Set up time of
alternating lots: 1 hour
Set up time of
alternating lots: 1/10
hour (6 min)
Set up time of
alternating lots: 1 hour
Set up time of
alternating lots: 1/10
hour (6 min)
→ if the setup time was reduced to 1/N of the initial time, the lot size could be
reduced to 1/N of its initial size without changing the loading rate of the process
Benefits of Setup Time Reduction
https://www.
youtube.co
m/watch?v=
bcIkuHqC71
o
Shortening Waiting time & Conveyance time between processes
Shortening Waiting Time Caused by Pre-Process Lot Size
It takes 30 hr (600
min x 3) for 600
product unit to go
through 3 processes
_________________
Next lessons
Summary
● Lead time
● Significance of lead time reduction
● How to reduce lead time?