ROR Final Module 3
Topics covered
ROR Final Module 3
Topics covered
LTD
3. A Cylinder
3
1. V/L C.B.D probably 50m or more underway seen from stbd side.
3. A Cylinder.
4
1. V/L C.B.D. probably 50m or more underway seen end on.
3. A Cylinder.
5
1. V/L C.B.D underway seen from astern.
3. A Cylinder.
6
1. V/L C.B.D. less than 50m underway seen from stbd side.
3. A Cylinder
7
1. V/L C.B.D less than 50m underway seen end on.
3. A Cylinder.
8
1. Mine clearance v/l probably 50m or more underway seen from port side.
2. One short blast a/c to stbd and pass more than 1000m.
3. Three balls- one at foremast head and one at each end of the foreyard.
9
1. Mine clearance v/l probably 50m or more underway seen from stbd side.
2. Two short blasts a/c to port and pass more than 1000m.
3. Three balls- one at foremast head and one at each end of the foreyard.
10
1. Mine clearance v/l underway seen from astern of less than 50m at anchor.
2. One short blast a/c to stbd and pass more than 1000m.
3. Three balls- one at foremast head and one at each end of the foreyard. Also if at anchor, a ball in the fore part.
11
1. Mine clearance v/l less than 50m underway seen from stbd side.
2. Two short blasts a/c to port and pass more than 1000m.
3. Three balls- one at foremast head and one at each end of the foreyard.
12
1. Mine clearance v/l underway seen from astern or less than 50m at anchor.
2. Two short blast a/c to port and pass more than 1000m.
3. Three balls- one at foremast head and one at each end of the foreyard. Also, if at anchor, a ball in the fore part.
13
1. Mine clearance v/l probably 50m or more but less than 100m at anchor, seen from port side.
2. One short blast a/c to stbd and pass more than 1000m.
3. Three balls- one at foremast head and one at each end of the foreyard. Also a ball in the fore part.\
14
1. Mine clearance v/l probably 50m or more underway seen end on.
2. One short blast a/c to stbd and pass more than 1000m.
3. Three balls- one at foremast head and one at each end of the foreyard.
15
1. Mine clearance v/l less than 50m underway seen from port side.
2. One short blast a/c to stbd and pass more than 1000m.
3. Three balls- one at foremast head and one at each end of the foreyard.
16
1. Mine clearance v/l underway seen from astern or less than 50m at anchor.
2. One short blast a/c to stbd and pass more than 1000m.
3. Three balls- one at foremast head and one at each end of the foreyard. Also, if at anchor, a ball in the fore part.
17
1. a) Air-cushion v/l in non-displacement mode underway seen from astern.
b) Air-cushion v/l less than 12m in non-displacement mode underway out of range of side lights, seen from stbd side.
3. No day signal.
18
1. Air-cushion v/l less than 50m in non-displacement mode underway seen from port side.
3. No day signal.
19
1. Air-cushion v/l less than 50m in non-displacement mode underway seen from stbd side.
3. No day signal.
20
1. Air-cushion v/l less than 50m in non-displacement mode underway seen end on.
3. No day signal.
21
1. N.U.C v/l making way seen from port side.
22
1. a) N.U.C v/l making way seen from astern.
b) Aground v/l less than 50m.
23
1. N.U.C v/l making way seen from port side.
24
1. N.U.C v/l underway but stopped.
25
1. N.U.C v/l making way seen from stbd side.
26
1. N.U.C v/l making way seen end on.
27
1. Pilot v/l underway seen end on.
3. Flag H
28
1. Pilot vessel underway seen from stbd side.
3. Flag H.
29
1. Pilot vessel underway seen fro astern or less than 50m at anchor.
30
1. Pilot vessel probably 50m or more but less than 100m at anchor seen from port side.
31
1. Pilot vessel underway seen from port side.
3. Flag H.
32
1. Aground vessel probably 50m or more, seen from port side.
2. One short blast a/c to stbd, reverse course and infrom master.
4. less than 100m- three strokes on the bell before and after rapid ringing of the bell for 5 secs.
100m or more- Three strokes on the bell before and after rapid ringing of the bell for 5 secs in fore part and rapid ringing of the gong for 5 secs in the aft part.
33
1. Dredger R.A.M with obstruction on port side making way seen from astern.
3. Ball, diamond and ball in vertical line. Also two diamonds in a vertical line on safe side and two balls in vertical line on obstruction side.
34
1. Vessel R.A.M or dredger/ uwo without obstruction less than 50m at anchor, or making way seen from astern.
3. Ball, diamond and ball in vertical line and if at anchor, a ball in the fore part.
35
1. Vessel R.A.M or dredger/ uwo without obstruction less than 50m making way seen from port side.
36
1. Dredger/ uwo less than 50m R.A.M with obstruction on port side making way seen from port side.
3. Ball, diamond and ball in vertical line. Also two diamonds in vertical line on safe side and two balls in vertical line on obstruction side.
37
1. Vessel R.A.M or dredger/ uwo without obstruction probably 50m or more making way seen from port side.
38
1. Vessel R.A.M or dredger/ uwo without obstruction probably 50m or more making way seen from stbd side.
39
1. Vessel R.A.M or dredger/ uwo without obstruction less than 50m making way seen end on.
40
1. a) Vessel R.A.M or dredger/ uwo without obstruction probably 50m or more making way seen end on.
b) P.D vessel towing less than 50m underway, tow 200m or less R.A.M seen end on.
41
1. dredger/ uwo R.A.M with obstruction on port side makng way seen from astern.
3. Ball, diamond and ball in vertical line. Also two diamonds in vertical line on safe side and two balls in vertical line on obstruction side.
42
1. Vessel R.A.M or dredger/ uwo without obstruction less than 50m making way seen from stbd side.
43
1. Vessel R.A.M or dredger/ uwo without obstruction less than 50m at anchor, or making way seen from astern.
3. Ball, diamond and ball in vertical line and if at anchor, a ball in fore part.
44
1. Vessel R.A.M or dredger/ uwo without obstruction less than 50m making way seen from port side.
45
1. Vessel R.A.M or dredger/ uwo without obstruction probably or more but less than 100m at anchor from port side.
46
1. Dredger/ uwo probably 50m or more R.A.M with obstruction on port side making way seen from stbd side.
3. Ball, diamond and ball in vertical line. Also two diamonds in vertical line on safe side and two balls in vertical line on obstruction side.
47
1. a) Vessel R.A.M or dredger/ uwo without obstruction underway but stopped.
b) Rigid flag A.
48
1. Dredger/ uwo less than 50m R.A.M with obstruction on stbd side making way seen from stbd side.
3. Ball, diamond and ball in vertical line. Also two diamonds in vertical line on safe side and two balls in vertical line on obstruction side.
49
1. dredger/ uwo less than 50m R.A.M with obstruction on stbd side making way seen from port side.
3. Ball, diamond and ball in vertical line. Also two diamonds in vertical line on safe side and two balls in vertical line on obstruction side.
50
1. Dredger/ uwo less than 50m R.A.M with obstruction on port side making way seen from stbd side.
3. Ball, diamond and ball in vertical line. Also two diamonds in vertical line on safe side and two balls in vertical line on obstruction side.
51
1. Dredger/ uwo less than 50m R.A.M with obstruction on port side making way seen end on.
3. Ball, diamond and ball in vertical line. Also two diamonds in vertical line on safe side and two balls in vertical line on obstruction side.
52
1. Dredger/ uwo less than 50m R.A.M with obstruction on stbd side making way seen end on.
3. Ball, diamond and ball in vertical line. Also two diamonds in vertical line on safe side and two balls in vertical line on obstruction side.
53
1. Dredger/ uwo probably 50m or more R.A.M with obstruction on stbd side making way seen end on.
3. Ball, diamond and ball in vertical line. Also two diamonds in vertical line on safe side and two balls in vertical line on obstruction side.
54
1. Dredger/ uwo R.A.M with obstruction underway stopped or at anchor.
3. Ball, diamond and ball in vertical line. Also, two diamonds in vertical line on safe side and two balls in vertical line on obstruction side.
55
1. Dredger probably 50m or more R.A.M with obstruction on stbd side making way seen from port side.
3. Ball, diamond and ball in vertical line. Also, two diamonds in vertical line on safe side and two balls in vertical line on obstruction side.
56
1. Dredger R.A.M with obstruction on stbd side making way seen from astern.
3. Ball, diamond and ball in vertical line. Also two diamonds in vertical line on safe side and two balls in vertical line on obstruction side.
57
1. Vessel R.A.M or dredger/uwo without obstruction less than 50m at anchor, or making way seen from astern.
3. Ball, diamond and ball in vertical line and if at anchor also a ball in the fore part.
58
1. Dredger /uwo R.A.M with obstruction on stbd side making way seen from astern.
3. Ball, diamond and ball in vertical line. Also two diamonds in vertical line on safe side and two balls in vertical line on obstruction side.
59
1. F.V. other than trawler making way, gear extending more than 150m seen from astern.
3. Two cones with apexes together in vertical line. Also a cone with apex upwards in the direction of the gear.
60
1. F.V. other than trawler underway but stopped or at anchor, gear extending 150m or less.
61
1. Trawler probably 50m or more making way shooting nets seen end on.
62
1. Trawler less than 50m making way hauling nets seen from port side.
63
1. Trawler less than 50m making way shooting nets seen from port side.
64
1. Trawler less than 50m making way hauling nets seen from stbd side.
65
1. Trawler less than 50m making way shooting nets seen from stbd side.
66
1. Trawler underway but stopped or at anchor, nets fast upon an obstruction.
67
1. Trawler underway but stopped or at anchor hauling nets.
68
1. Trawler less than 50m making way hauling nets seen end on.
69
1. Trawler less than 50m making way shooting nets seen end on.
70
1. Two vessels pair trawling shooting nets seen from astern.
3. Each vessel shows two cones with apexes together in vertical line. Also fags T & Z.
71
1. Trawler underway but stopped or at anchor.
72
1. F.V other than trawler making way gear extending more than 150m seen from port side.
3. Two cones with apexes together in vertical line. Also a cone with apex upwards in direction of gear.
73
1. F.V. other than trawler making way, gear extending more than 150m, seen from stbd side.
3. Two cones with apexes together in vertical line. Also a cone with apex upwards in direction of gear.
74
1. Trawler less than 50m making way seen from stbd side.
75
1. Trawler less than 50m making way seen end on.
76
1. F.V. other than trawler using purse seine gear extending 150m or less underway but stopped or at anchor.
77
1. F.V. other than trawler using purse seine gear extending 150m or less making way seen from astern.
78
1. F.V. other than trawler using purse seine gear extending more than 150m making way seen from astern.
3. Two cones with apexes together in vertical line. Also a cone with apex upwards in direction of gear.
79
1. F.V. other than trawler using purse seine gear extending more than 150m making way seen from astern.
3. Two cones with apexes together in vertical line. Also a cone with apex upwards in direction of gear.
80
1. F.V. other than trawler making way, gear extending more than 150m seen from astern.
3. Two cones with apexes together in vertical line. Also a cone with apex upwards in direction of gear.
81
1. F.V. other than trawler making way, gear extending more than 150m making way seen from astern.
3. Two cones with apexes together in vertical line. Also a cone with apex upwards in direction of gear.
82
1. F.V. other than trawler making way, gear extending 150m or more, seen from port side.
3. Two cones with apexes together in vertical line. Aso a cone with apex upwards in direction of gear.
83
1. F.V. other than trawler using purse seine gear extending 150m or less making way seen from port side.
84
1. F.V. other than trawler using purse seine gear extending 150m or less making way seen from stbd side.
85
1. F.V. other than trawler using purse seine gear extending 150m or less making way seen end on.
86
1. Two vessels pair trawling underway but stopped or at anchor, nets fast upon an obstruction.
3. Each vessel shows two cones with apexes together in vertical line. Also flag T.
87
1. Trawler making way hauling nets seen from astern.
88
1. Trawler making way shooting nets seen from astern.
89
1. Two vessels probably 50m or more pair trawling making way shooting nets, seen end on.
3. Each vessel shows two cones with apexes together in vertical line. Also flag Z & T.
90
1. Trawler less than 50m making way seen from port side.
91
1. Trawler making way seen from astern.
92
1. Trawler probably 50m or more making way seen from port side.
93
1. Trawler probably 50m or more making way seen from stbd side.
94
1. Trawler making way seen from astern.
95
1. F.V. other than trawler using purse seine gear extending 150m or less making way seen from astern.
96
1. F.V. other than trawler using purse seine gear extending more than 150m making way seen from stbd side.
3. Two cones with apexes together in vertical line. Also a cone with apex upwards in direction of gear.
97
1. Trawler probably 50m or more underway but stopped or at anchor, seen from stbd side.
98
1. Trawler probably 50m or more underway but stopped or at anchor, seen from port side.
99
1. Trawler probably 50m or more underway but stopped or at anchor, seen end on.
100
1. F.V. other than trawler
a) making way, gear extending 150m or less seen from astern.
b) underway but stopped or at anchor, gear extending more than 150m.
101
1. F.V. other than trawler making way, gear extending 150m or less, seen from port side.
102
1. F.V. other than trawler making way, gear extending 150m or less, seen from side.
103
1. Trawler less than 50m making way seen from port side.
104
1. Trawler making way shooting nets seen from astern.
105
1. F.V. other than trawler making way, gear extending more than 150m, seen from astern.
3. Two cones with apexes together in vertical line. Also a cone with apex upwards in direction of gear.
106
1. F.V. other than trawler making way , gear extending 150m or less, seen end on.
107
1. Trawler probably 50m or more underway but stopped or at anchor, nets fast upon an obstruction, seen from port side.
108
1. Trawler making way hauling nets seen from astern.
109
1. Trawler making way shooting nets seen from astern.
110
1. Trawler probably 50m or more making way shooting nets seen from port side.
111
1. Trawler probably 50m or more underway but stopped or at anchor, nets fast upon an obstruction, seen from stbd side.
112
1. F.V. other than trawler using purse seine gear extending more than 150m, making way seen end on.
3. Two cones with apexes together in vertical line. Also a cone with apex upwards in direction of the gear.
113
1. Trawler probably 50m or more making way seen from stbd side.
114
1. Trawler probably 50m or more underway but stopped or at anchor, nets fast upon an obstruction seen end on.
115
1. Trawler probably 50m or more making way seen end on.
116
1. Trawler making way hauling nets seen from astern.
117
1. F.V. other than trawler making way, gear extending more than 150m, seen end on.
3. Two cones with apexes together in vertical line. Also a cone with apex upwards in direction of gear.
118
1. F.V. other than trawler
a) making way, gear extending 150m or less, seen from astern.
b) underway but stopped or at anchor, gear extending more than 150m.
119
1. a) vessel probably 50m or more but less than 100m at anchor, seen from ahead or astern.
b) P.D. vessel probably 50m or more underway seen end on, out of range of side lights.
c) P.D. vessel towing or pushing less than 50m underway, tow 200m or less, out of range of side lights.
4. As per possibility.
120
1. P.D. vessel towing less than 50m underway tow 200m or less than stbd side.
3. No day signal.
121
1. P.D. vessel towing less than 50m underway tow exceeds 200m seen from stbd side.
3. One diamond.
122
1. P.D. vessel pushing ahead probably 50m or more underway seen from port side.
3. No day signal.
123
1. Inconspicuous, partly submerged vessel or object or their combination, towed, length 200m or less.
3. One diamond at or near aftermost extremity of last vessel or object. If tow exceeds 200m one additional diamond forward.
4. No fog signal.
124
1. P.D. vessel towing less than 50m underway with tow 200m or less seen from stbd side.
3. No day signal.
125
1. P.D. vessel probably 50m or more underway with tow 200m or less seen from stbd side.
3. No day signal.
126
1. P.D. vessel probably 50m or more underway tow exceeds 200m seen from port side.
3. One diamond.
127
1. P.D. vessel probably 50m or more underway tow exceeds 200m seen from stbd side.
3. One diamond.
128
1. P.D. vessel towing alongside less than 50m underway seen end on.
3. No day signal.
129
1. P.D. vessel pushing ahead probably 50m or more underway seen from stbd side.
3. No day signal.
130
1. P.D. vessel pushing ahead probably 50m or more underaway seen from port side.
3. No day signal.
131
1. P.D. vessel towing less than 50m underway with tow 200m or less seen from port side.
3. No day signal.
132
1. P.D. vessel towing probably 50m or more underway tow exceeds 200m seen end on.
3. One diamond.
133
1. P.D. vessel less than 50m underway seen from stbd side.
3. No day signal.
134
1. P.D. vessel less than 50m underway seen end on.
3. No day signal.
135
1. P.D. vessel towing underway seen end on-
3. a) one diamond.
b) no day signal.
136
1. S.V. underway seen end on.
3. No day signal.
137
1. S.V. probably 20m or more underway seen from port side.
3. No day signal.
138
1. S.V. probably 20m or more underway seen from stbd side.
3. No day signal.
139
1. S.V. probably 20m or more underway seen from astern.
3. No day signal.
140
1. S.V. probably 20m or more underway seen from astern.
3. No day signal.
141
1. a) S.V. underway seen from stbd side.
b) vessel being towed seen from stbd side.
3. a) no day signal.
b) if length of tow exceeds 200m a diamond.
142
1. S.V. probably 20m or more underway seen end on.
3. No day signal.
143
1. a) S.V. underway seen from port side.
b) vessel being towed seen from port side.
3. a) no day signal.
b) if length of tow exceeds 200m a diamond.
144
1. S.V. less than 20m underway seen end on.
3. No day signal.
145
1. P.D. vessel towing probably 50m or more underway with tow 200m or less seen from stbd side.
3. No day signal.
146
1. Inconspicuous or partly submerged vessel or object or their combination towed, breadth less than 25m, length 100m or less.
3. One diamond at or near aftermost extremity of last vessel or object. If tow exceeds 200m, one additional diamond forward.
4. No fog signal.
147
1. P.D. vessel less than 50m underway seen from port side.
3. No day signal.
148
1. P.D. vessel probably 50m or more underway seen from port side.
3. No day signal.
149
1. P.D. vessel probably 50m or more underway seen from stbd side.
3. No day signal.
150
1. P.D. vessel towing probably 50m or more underway tow exceeds 200m R.A.M seen end on.
151
1. P.D. vessel towing less than 50m underway tow exceeds 200m R.A.M seen from port side.
152
1. P.D. vessel towing less than 50m underway tow exceeds 200m R.A.M seen from stbd side.
153
1. P.D. vessel towing probably more than 50m underway tow exceeds 200m R.A.M seen from port side.
154
1. P.D. vessel towing underway R.A.M seen from astern.
3. Ball, diamond and ball in vertical line and if tow exceeds 200m also a diamond.
155
1. P.D. vessel towing underway R.A.M seen from astern.
3. Ball, diamond and ball in vertical line and if tow exceeds 200m also a diamond.
156
1. P.D. vessel towing probably 50m or more underway tow exceeds 200m R.A.M seen from port side.
157
1. P.D. vessel towing alongside probably 50m or more underway seen end on.
3. No day signal.
158
1. P.D. vessel towing probably 50m or more underway tow exceeds 200m seen from stbd side.
3. One diamond.
159
1. a) P.D. vessel less than 20m underway seen end on.
b) P.D. vessel less than 12m underway mast head lt. displaced from centre line, seen end on.
3. No day signal.
160
1. a) P.D. or S.V. underway seen from astern.
b) P.D. vessel less than 50m underway out of range of side lights.
c) All-Round light of:-
i) vessel less than 50m at anchor
ii) vessel under oars.
iii) P.D. vessel less than 7m, speed not exceeding 7 knots.
iv) P.D. vessel less than 12m, out of range of sidelights.
v) Sailing vessel less than 7m.
4. As per possibility.
161
Day Signals
162
1. P.D. vessel constrained by draught, underway, seen from stbd side.
2. One short blast, a/c to stbd and pass round her stern.
163
1. Vessel N.U.C underway, seen from stbd side.
164
1. Vessel aground ,seen from stbd side.
2. One short blast, a/c to stbd, reverse course and inform master.
165
1. Vessel R.A.M except mine clearance vessel, underway, seen from stbd side.
166
1. a) P.D. vessel towing, tow length > 200m, underway seen from stbd side.
b) vessel object towed, tow length > 200m, seen from stbd side.
167
1. a) vessel fishing with nets or lines extending <= 150m horizontally from vessel, underway, or at anchor, seen from stbd side.
b) trawler, underway or at anchor, seen from stbd side.
168
1. P.D. vessel towing, R.A.M, tow length > 200m, underway, seen from stbd side.
2. Two short blasts, a/c to port and pass round stern of last vessel or object towed.
169
1. Small vessel engaged in diving operations, seen from stbd side.
3. All round red light, white and red lights in vertical line.
170
1. Pilot vessel at anchor, seen from stbd side.
3. a) all round white over red light in vertical line at or near masthead.
b) all round white lights ford and aft.
c) working lights to illuminate deck.
d) length < 100m- working lights not compulsory.
e) length < 50m- working lights and white light at stern not compulsory, and ford white light placed where it can best be seen.
171
1. trawler, underway, shooting nets, seen from stbd side.
172
1. S.V. underway, also propelled by machinery, seen from stbd side.
173
1. Pilot vessel underway, seen from stbd side.
3. a) all round white light over re light in vertical line at or near masthead.
b) side lights and stern light.
174
1. a) P.D. vessel towing, tow length > 200m, underway seen from port side.
b) vessel or object towed, tow length > 200m seen from port side.
2. One short blast a/c to stbd and pass round stern of last vessel or object towed.
175
1. S.V. underway, also propelled by machinery, seen from port side.
176
1. Pilot vessel underway, seen from port side.
3. a) all round white light over re light in vertical line at or near masthead.
b) side lights and stern light.
177
1. Vessel at anchor, seen from port side.
178
1. Vessel engaged in mine clearance operations, at anchor, seen from port side.
2. One short blast, a/c to stbd and pass > 1000m clear of the vessel.
3. a) three all round green lights- one at foremast head and one at each end of fore yard.
b) all round white lights ford and aft.
c) length < 100m- working lights not compulsory.
d) length < 50m- working lights and white light at stern not compulsory and ford white light placed where it can best be seen.
179
1. Vessel R.A.M except mine clearance vessels at anchor, seen from port side.
180
1. Trawler underway or at anchor hauling nets seen from port side.
181
1. Last of inconspicuous, partly submerged vessel or object towed, tow length <= 200m seen from stbd side.
3. a) Breadth < 25m- all round white lights ford and aft.
b) breadth >=25m- additional all round white lights at extremities of breadth.
c) length < 100m- additional all round white lights in between above lights at horizontal intervals <=100m.
d) dracones- ford light not compulsory.
4. Nil
182
1. Last of inconspicuous, partly submerged vessel or object towed, tow length > 200m.
3. a) Breadth > 25m- all round white lights ford and aft.
b) breadth >=25m- additional all round white lights at extremities of breadth.
c) length > 100m- additional all round white lights in between above lights at horizontal intervals <=100m.
d) dracones- ford light not compulsory.
4. Nil
183
1. Vessel fishing with nets or lines extending > 150m horizontally from vessel, underway or at anchor, seen end on from ahead or astern.
184
1. Vessel engaged in mine clearance operations, underway seen end on from ahead or astern.
2. One short blast a/c to stbd and pass > 1000m clear of vessel.
3. a) three all round green lights- one at foremast head and one at each end of the fore yard.
b) masthead lights ford and aft, side lights and stern light.
c) length < 50m- aft masthead light not compulsory.
185
1. dredger, R.A.M underway or at anchor, seen end on from ahead or astern.
186
1. Two anchors engaged in pair trawling, underway or at anchor, hauling nets, seen end on from ahead or astern.
187
1. Two anchors engaged in pair trawling, underway or at anchor, nets fast upon an obstruction, seen end on from ahead or astern.
188
1. Two trawlers engaged in pair trawling, underway, shooting nets, seen end on from ahead or astern.
189
190