- DocumentMáxima presión de restricción para soldadura (psi)uploaded by
Adrian Toca
- Documentes-ES_7558uploaded by
Adrian Toca
- DocumentDTO0261OE EP PROCEDIMIENTO PARA LA CONSTRUCCION DE BANCOS DE DUCTOS E I...uploaded by
Adrian Toca
- DocumentDTO0237OE EP-09 SISTEMA PUESTA A TIERRA V.1uploaded by
Adrian Toca
- DocumentDTO0756OM EP REGISTRO FOTOGRAFICO Y CROQUIS DE INSPECCIÓN V.1 2.11.9uploaded by
Adrian Toca
- DocumentDTO0742OC EP REGISTRO OBRAS DE GEOTECNIA V.1 - RELLENO TIPO 11 2.6.14uploaded by
Adrian Toca
- DocumentDTO0724OC EP INSPECCION DE EXCAVACIONES V.1 2.4.11uploaded by
Adrian Toca
- Documentitem 4 tee 8 sch80 873 tangshan (m)uploaded by
Adrian Toca
- DocumentDensidades de campouploaded by
Adrian Toca
- DocumentTRUNNION 8 CLASE 900uploaded by
Adrian Toca
- Documentydf trunnionuploaded by
Adrian Toca
- DocumentAnexo Responsabilidades Prevencion COVID 19 Para Lideres Directores Resid (1)uploaded by
Adrian Toca
- DocumentValv Bola Trunnion Clase 900 Mtsuploaded by
Adrian Toca
- DocumentDE-PR-TU-001 Proc. Cargue y descargue e izaje de equipos, mat, acces. y herram. Ver. 0uploaded by
Adrian Toca
- DocumentDE-IT-TU-003 Instruc. Arme, desarme y modificación de andamios Ver. 0uploaded by
Adrian Toca
- DocumentDE-IT-TU-001 Instruc. prueba neum. - hidrost. para acces, mangueras y equipos sandb. Ver. 0uploaded by
Adrian Toca
- DocumentDE-IT-TU-004 Instruc. de inspección de equipos y materiales Ver. 0uploaded by
Adrian Toca
- DocumentDE-IT-TU-002 Instruc. apique identificación linea gasoducto 20 PROMIGAS Ver. 0uploaded by
Adrian Toca
- DocumentDE-IT-TU-003 INSTRUCTIVO DE ARME Y DESARME DE ANDAMIOS Ver 0 docxuploaded by
Adrian Toca
- DocumentDE-IT-TU-001 ACCESORIOS, MANGUERASuploaded by
Adrian Toca
- DocumentDE-IT-TU-04 INSTRUCTIVO DE INSPECCION EQUIPOSuploaded by
Adrian Toca