Exhibit G 1

Authorization for Construction

Pursuant to this agreement the Owner and the Construction Manager hereby execute
this Exhibit G1 and further agree as follows
1 The Construction

s Manager

Guaranteed Maximum Price

GMP

proposal for the

entire Project has been established The Construction Manager GMP for the TEE s Center Project dated December 7 2010 attached hereto and incorporated herein
is accepted by the Owner
2 3
4

The General Conditions Guaranteed Maximum Cost for the

00 670 082 1
00 400 26 00 930 250 00 647 796 1 00 842 710 00 543 199 3 00 000 780

Project including this Bid Package is


Preconstruction Services

The Subcontracts Cost is Bid Package 1 Bid Package 2


Bid

Package Bid Package


5 6 7 The

3 4

Lump Sum Fixed Management Fee for the Project including this Bid Package is The Guaranteed Maximum Price per attachment A Value Engineering for the Project is The Date of Substantial Completion shall be

00 000 900 27
24 months after
Notice to Proceed

Items 2 3 and 5 above were previously agreed to and included in the agreement
Owner

Construction Manager
W R Allen LLC

Augusta Georgia

By

e 0v
Signature
iv Ip
5

Seal
Gvv

Signature
5d
T

Seal
sic

Name
Wilk
oA
i

Name

Fi23 i o
Title

Titl

kil
Attest
s y b

Street Address

No PO Box

City

Cle

f7 7

19 100 400
g

City State Zip


1

mq C 4 Eot Signature 9
1 of 1

4 t 2 1

Date of Signature 9

1
1015 Broad Street

Augusta Georgia 30901


com rwallen www

3879 733 2800 733 Office 706 I Fax 706

wow

Decernber 7 2009

A P

Ivir Jacques Ware Project Manager Heery IDED Augusta Richmond County

RWAllen

Capital Improvements Program Management


501 Greene Street

Augusta GA 30901
RE

Guaranteed Maximum Price Contract

Augusta Tee Center


Mr Ware

It is our understanding that Augusta County would like to execute a Guaranteed Richmond Maximum Price GMP contract with R Allen LLC Based on our 75 pricing exercise we W produced a GMP number of 29 After a thorough estimate reconciliation meeting 00 109 471
with Heery we were able to reduce the GMP nunaber However we still exceeded the established GMP of 27 Therefore R W Allen has developed the attached list of 00 000 900

scope clarification savings and value engineering ongoing items in an effort to achieve the
desired GMP

R W Allen LLC will execute the GMP contract in the amount of 27 based on the 00 000 900

project cost reconciliation and the acceptance ofthe attached value engineering items which are
required to achieve the desired GMP

If you have any questions or concerns regarding the attached items please do not hesitate to
contact us

Sincerely W R Allen LLC

Scott A Clark President and CEO

Construction Services

Attachment

5 C
k

1 21171 2010

Augusta Trade Exhibit


P

Event Center

Potential Savings

75 GMP Estimate dated

10 17 11

109 71 29

Potential Savings Design Contingency Reducton


Subtotal

479885
991 28

Scope Clarifications
Refine wood

decking
Scope

lam gu

beam scope

Metal Wall Panel


Door Hardware

Scope
screen

Etiminate utility
Elimiaate roof Refine Refine

wall
area

000 20 000 20 080 15 000 10


OOO G 000 20 000 90 000 84 000 05

screen

wall at Iow roof

painting

scope

flooring scope

Refine eevator scope Refine fire protection scope

Value Engineering
Eliminato treatment for wood decking
Eflminate FSC

requirements for wood decking Eliminate treatment for glu beams 4am
Eliminate fSC requirements for gIuiam beams Provide schedue 10 fire sprinkler pipe in Iieu of schedule 40 Eliminate AVVI certified cabinet mariufacturer millwork
Reduce parapet @

000 4 000 8

000 18 000 21
TBD

courtyard along the kitchen roof

Eliminate J toilets

x tile

acr

fianmin0
area

Eliminate utility screen wall Eliminate roofscreen wall at Iow roof


Install TPDin lieu nf metal roof

panels

Modify duct

insulation

stainless wrap

000 190 000 40 500 7 500 12 000 5 000 40 000 80


TBD

Reduce metal panel scope Eliminate duct cteaning Provide metal coping in tieu of caststone @ stucco parapets Install ACT in tieu of stucco drive thru ceillag
Provide stucco in Iieu of brick @ the west elevation

800 75 000 20 000 I5 500 3

Provide 5000 standard size

car wlth 46 bi doors for parting freight elev Provide holed hydrautic elevators in Iieu traction elevators

000 130 000 65

Total