Professional Documents
Culture Documents
L 6 3 3
SEPTIC TANK N VOLUME RATE 2 2 5.04 2 2 2.52 1.5 1 0.945 8.505 3000 0.75 1 13.5 3400
COST
25515 45900
EXCAVATION
6.5
3.5
45.5
100
4550
PVC PIPE
34
272 76237
RADIUS OF SEPTIC TANK , r DEPTH OF SEPTIC TANK ,h AREA OF SEPTIC TANK , A EXCAVATION RATE OF EXCAVATION COST OF EXCAVATION AMOUNT OF BRICK BATS TO BE USED
= = = = = = =
1.5 m 3m 7.065 m 21.195 m 100 Rs 2119.5 Rs 5404.725 2 Rs PER BRICK 10809.45 Rs 204 Rs 4000 Rs 17132.95 Rs
RATE OF LOW CLASS BRICK = COST OF BRICK LAYING (INCLUDING SUPPLY AT SITE) = PIPEWORK LABOUR HEAD TOTAL COST IN Rs = = =
= = = = =
RATE OF BRICK PILLAR OF SIZE 300X300 mm = COST OF 10 PILLARS TOTAL COST OF GI SHEET SHED = =