When the piping installation is subcontracted. the subcontractor frequently suppliesthe bulk materials. Even if that is the case,theaccount should show the breakdown between material and labor to permit the analysis of the materialilabor ratio.
0
- Control paneliTDCiPLC. -
Receivingistoringlhandling.
Calibration. Installation. Loop checkout. Instrument air piping from distribution point instrument. to the individual control center
the Normally. the installation of instruments is subcontracted with subcontractor supplying the installation materials. Those materials should bc included together with the subcontract labor in the subcontract column.
0
All electricalequipment: 1. Unit transformers and associated switch gear. 2. Lighting transformers. 3. Motor controlcentersibreakers. 4. Localpanels.
low voltagedistribution main substation (excluded) down to the last lighting fixture. 1. Poles, towers and miscellaneous supplies. 2. Conduitand trays. 3. Wiring and bus ducts. 4. Junctionboxes. 5 . Terminals and connectors. push buttons. etc. 6. Lighting fixtures and receptacles. 7. Lighting panels. from the
- All materialsrequiredforhighand