In many companies, it is normal that, once engineering is complete, the Project Manager will follow the job to the field to look over the contractor's shoulder with someconstructionsupervisoryassistancefromeither theplantor CED staff. Under the small project approach, the Project Manager andor the Field Engineer act as C.M. and work directly with the construction contractors. When acting as C.M., the Owner is assuming responsibility and risks normally assigned to the General Contractor. The extent of the risks involved and their probability must be evaluated for each case and weighed against the potential savings.

14.3 Construction Management Activities


The construction phase of all projects includes two well-defined sets of activities. actual construction and construction management.

Actual Construction
The actual construction comprises a variety of activities involving work by different specialized craftsmen: Civil Work

Site preparation. Undergroundmainsandsewers. Foundations. Structural steel. Buildings.

- Painting.
Mechanical Work

Relocationsandmodifications. Equipment setting. Piping. Instrument installation.

Electrical Work

- Powerandlighting. - Instrument wiring.


Specialty Work

- Insulation.