CHAPTER -1
ABOUT COMPANY
Elite Engineers and Buildings come to existence 5years ago, Elite Engineers Construction today
is a strong and vibrant organization committed to delighting our customers through innovation.
Our Architectural and Technical innovation set customers a strong vision of the company based
on our enduring values such as a Quality, Reliability, Punctuality and Transparency.
We firmly believe that innovation as well as renovation lies in every aspect of human life and
therefore, we keep the same view towards our designing and construction projects. Thus, we
always strive to make an innovative solution that deeply depends on all kinds of individual
needs. Our business policy is to always be unique and lead towards a source of new style as well
as new way of attaining the success of construction and renovation as to the betterment and for
all the solutions of our customer’s needs and demands.
The Company started a building construction with a finger count, by stepping stone the company
has completed more than 100 building with satisfied clients. Presently around more than 30
projects are ongoing Contraction. Today the company operates as a complete professional
construction service using its collective skills and understanding of markets to develop a unique
value proposition to clients.
1.1 Objectives
CHAPTER 2
ABOUT THE CONSTRUCTION DEPARTMENT
Construction Department workers play a vital role in determining the look of films: they are
responsible for building, painting and plastering all the sets required for productions.
They work closely with the Art and Design Department to ensure that the Director's and
the Production Designer's ideas are visually realized on sets.
In addition to excellent craft skills in their chosen field, members of the Construction.
Department must also have strong creative abilities. They are often required to create
structures in a specific period or historical style, or they may be required to distress' their
work, so that it looks worn and lived in rather than brand new. They must have an
excellent working knowledge of all the materials available in their field, combined with
highly developed technical skills, far in advance of those required by traditional
domestic plasterers, painters, scaffolders or carpenters.
The Engineers
Engineer are very important members of the design team who responsibilities are to
assist in the overall design of the project within the scope of their specialist’s field.
Engineers such as geotechnical, structural, electrical, mechanical and well so on carry
out various analysis and calculations before arriving at the optimal design solution for a
specific building thereafter, they will produce drawings, specifications, schedules and
other relevant data that maybe required for the overall design of the project to assist the
quantity surveyor in the preparation of bills of quantities and crofting and the client in
his assessment of the suitability project, regarding statutory requirements. During project
execution stage, engineer should visit the site periodically for inspections to ensure that
in general, the work
being carried out is in compliance with their drawings, schedule, specifications also available
modify or redesign their individual aspects as may become necessary. Also some projects
may require the services of resident engineers on the building project site. The duties of a
project engineer are:
Reviews all preliminary reports including advance planning studies for the
project. Proper shoulder widths, traffic and falseworks clearances, approach
slab status, and adequate stream slow and scour provisions must be verified
prior to developing the general plan.
The Surveyor
The role of construction team member in building projects delivery surveyor is the custodian of
land information. The size, topography, location, features on and beneath land upon which
any development is Built, is determined first buy surveyors. Without this information, no
proper, adequate, effective and accurate planning, design and fusion of execution of building
projects can be carried out.
Transportation Department
This department supplies the survey equipment’s to the construction field. Where the survey is
going to be carried out. This department supplies instrument on time and this department
plays a major role in the construction field of a civil engineering.
Safety was given importance on the site project manager kept a track of Safety methods in
the entire project during the execution. Project manager is used to carry Safety inspections
regular basis. Some of the Safety rules allowed strictly at site were:
Visitors entering the site should strictly where Safety helmets. Also
visitors must be accompanied by the concerned engineer of that
particular area to be visited.
No workman below 14 years or above 65 years of age shall be engaged
for a job. Child labor strictly prohibited.
Eye protective equipment was used by the labor’s engagement activities
such as welding chipping and other jobs that require eye protection.
Hand gloves where were while handling sharp articles, hot
material, corrosive chemical, welding, cutting etc.
Adequate illumination at workplace was ensure before starting the job at
night.
All scaffolding or work platform was made strong enough to take the
expected load.
CHAPTER 3
TASKS PERFORMED ON THE SITE
I have been working with the site engineer at the office and observe various
construction activities on the site. The site engineer is always explaining work performed in
the office and I had observed the works on the site performed by workers. As a new person
to join the site; my first task was getting accustom with the professional workers and other
stakeholders on the site. Aster this I have focused on my activities by ensuring proper
interaction with my site engineer, super v for and other workers. When we visited the
office engineer showed the below documents that are required for the permission to build
the house.
Estimation cost.
Lineout
Excavation.
Staircase construction.
Plastering.
According to the engineering drawing given, mark the center point of a corner column.
Measure the correct distance of column Centre from boundary wall as given in the
drawing. Use a pole or peg to pin it on the cement mortar available on the ground
Take angular setting out – Right angles setting out to mark the next columns on a
straight line. (Use the Pythagoras theorem)
Columns act as vertical support to beam to slabs, and to transmit the loads the foundations.
Columns are the primary compression members, although they may also have to resist
building moment transmitted by beams.
For footing mat is provided. Mesh reinforcement consists of bars 10 mm diameter at spacing
of 6" c/c. Usually bend length provided will be 4".
Column size is 9"x15". The reinforcement provided is 4 bars of 16 mm diameter and 2 bars
of 12 mm diameter. Lateral ties are of 8 mm diameter at spacing of 6"c/c.
Concrete for column will be of grade M20 with mix proportion 1:1.5:3. It means 1bag of
cement, 1.5 bags of sand and 3 bags of aggregates. Usually in site sand and aggregates are
measured in terms of pan. For one bag of cement, 10 pan of sand and 12 pan of aggregates.
Plinth level is a specific height from the ground level at which building superstructure
construction starts
These beams prevent moisture from entering the building from the foundation.
It prevents cracks from the foundation to the wall This prevents the building to
collapse during an earthquake.
To transfer a load of a superstructure to the foundation of the building.
To serve as a retaining wall to prevent the filling part from rising over the higher floor
or building.
To improve the architectural appearance of a building.
To provide stability to the building from all sides
3.2.5. Wall
Walls are the vertical elements on which the roof finally rests. They can be made of different
materials like bricks, stones, mud, concrete blocks, lateritic blocks etc. Is the walls are very
long, columns can be provided to carry the roof.Walls provide privacy and enclosure. Walls
also provide security and protection against natural elements such as wind, rain
BRICK MASONARY
Brick masonry is a highly durable form of construction. It is built by placing bricks in mortar
in a systematic manner to construct solid mass that withstand exerted loads. There are several
types of bricks and number of mortars which can be used to construct brick masonry.
The bond in brick masonry, which adheres bricks together, is produced by filling joints
between bricks with suitable mortar. Special cautions shall be practiced while mortar is mixed
and placed since it greatly affects the performance and durability of masonry structure.
Flemish bond was used in the site and at ratio of 1:6 for the wall 9 inches.
3.2.6 PLASTERING
continuation of a vertical feature beneath the roof such as a fire wall or party
wall. Parapets were originally used to defend buildings from military attack, but today
they are primarily used as guard rails, to conceal rooftop equipment, reduce wind loads
on the roof and to prevent the spread of fires.
CHAPTER-4
PLAN AND ESTIMATION
DETAILED ESTIMATE
DETAILS OF MEASUREMENTS
Total centre to
centre length
For 23cm wall = 23.08 m
For 10cm wall = 8.12 m
Junctions
23cm to 23cm N = 1
23cm to 15cm N1 = 7
10cm to 10cm N2 = 3
S.No Particulars of Breadt
No. Length Depth Quantity Total Qty.
Items h
1 KSRB 4-1.5 : Providing and laying in position plain cement concrete of mix M20 with
OPC cement @ 300kgs, with 20mm and down size graded granite metal coarse
aggregates @0.64 cum and fine aggregates @ 0.43cum, with superplasticiser @3lts
confirming to IS9103-1999 Reaffirmed-2008, machine mixed, concrete laid in layers not
exceeding 15 cms. thick, well compacted, in foundation, plinth and sill, including cost of
all materials, labour, HOM of machinery, curing complete as per specifications.
Specification No. KBS 4.1, 4.2
For 23cm wall 1 23.08 0.45 0.075 0.78
For 15cm wall 1 8.12 0.45 0.075 0.27
Sills below
windows 7 1.50 0.23 0.10 0.24
Windows W
Ventilators V 1 0.60 0.23 0.10 0.01
1.31 1.31Cum
2 KSRB 4.2.2 : Providing and laying in position reinforced cement concrete of design mix
M20 with OPC cement @ 320kgs, with 20mm and down size graded granite metal coarse
aggregates @0.878cum and fine aggregates @ 0.459cum, with superplasticiser @3lts
confirming to IS9103-1999 Reaffirmed-2008, machine mixed, concrete laid in layers not
exceeding 15 cms thick, vibrated for all works in foundation plinth and ground floor level
for roof slabs, staircase, lintels, retaining walls, return walls, walls ( any thickness )
including attached plasters, columns, piers, abutments, pillars, posts, struts, buttresses,
string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window cills,
fillets etc., including cost of all materials, labour, HOM of machinery, curing, complete as
per specifications. Specification No. KBS 4.1, 4.6
4 KSRB 6-1.3 : Providing and constructing burnt brick masonry for basement and
superstructure with approved quality of non-modular bricks of standard size of class
designation 35 with cement mortar 1:6 including cost of materials, labour charges,
scaffolding, curing complete as per specifications. Specification No. KBS 6.2
For walls 1 23.08 0.23 3 15.93
For 10cm wall 1 8.12 0.10 3 2.43
A(+) 18.36
Deductions
Deduct for
openings 1 1.00 0.23 2.10 0.48
MD
D 3 0.90 0.23 2.10 1.30
O3 1 0.90 0.23 2.10 0.43
Windows W 7 1.50 0.23 1.50 3.62
Ventilators V 1 0.60 0.23 0.60 0.08
Deduct lintels 1 23.08 0.23 0.15 0.80
1 8.12 0.1 0.15 0.12
Deduct Columns 9 0.30 0.23 3.00 1.86
Net Deductions B (-) 8.71
Windows
W
Aluminium
Ventilators 2 0.60 - 0.60 0.72
V
9.72 9.72 Sqm
7 KSBC 7.9 Providing and fixing MS grill work for windows and ventilators weighing 21
Kg/sqm using M.S.flats and square rods as per approved design, drawing including
cutting steel section and welding the same to the required patterns with coat of red lead
paint primer, cost of materials, fixtures, labour, HOM of machinery complete as per
specifications. Specification No.KBS7.12
(21 x
204.12 204.12Kg
At 21kg/Sqm 9.72)
8 14.51 : Providing and laying Hassan Green / River Pink granite flooring for
staircase,treads and rises using pre polished 20 mm thick water cut green Granite slab laid
over existing cement concrete bed in CM 1:3, average 20mm thick including full
rounding for nosing, cutting 3 line grooves not more than 2 mm wide for antiskidding,
including cost of all materials, mortar, labour, curing etc., complete as per specification.
Hall 1 3.00 5.18 - 15.54
M.B 2 3.00 3.00 - 18.00
BED ROOM 1 3.00 3.80 - 11.40
KITCHEN 1 3.00 3.30 9.90
54.84 54.84 Sqm
8a KSRB 14.14-5; Providing Ceramic tiles of approved make shade and size for flooring,
threads of steps and landing laid on a bed of 12 mm thick cement using colour pigment,
including coast of materials labour curing complete as per specification. Specification No.
KBS for ceramic tiles of size 15x15cms
10 Cement plastering inside KSRB 15.3.1 Providing 12mm thick cement plaster in single
coat with cement 1:3 to brick masonry including rounding off corners wherever required
smooth rendering, Providing and removing scaffolding, including coast of material,
labour, curing complete as per specification.
Hall 2 7.18 - 3.00 43.08
M.Bed room 2 6.63 - 3.00 39.78
Bed room 2 6.80 - 3.00 40.80
Kitchen 2 6.30 - 3.00 37.80
A(+) 161.46
Ceiling plastering
1 3.53 3.65 - 12.88
Hall
M.Bed room 1 3.53 3.10 - 10.94
Bed room 1 3.90 3.10 - 12.09
Kitchen 1 3.23 2.43 - 7.85
B(+) 43.77
Deduct for openings
Deduct for openings
1 1.00 0.23 2.10 0.48
Doors MD
D 5 0.90 0.23 2.10 2.17
Windows W 4 1.50 0.23 1.50 2.07
Ventilators V 2 0.60 0.23 0.60 0.17
Net deductions C(-) 4.89
Net inside
210.12 210.12Sqm
plastering (A+B-C)
11 Cement paint KSRB 15-16.1 : Providing and finishing external wall in two costs with
waterproof cement paint of approved brand and shade to give an even shade after
thoroughly Brooming the surface to remove all dirt loose powdered materials, free from
mortal drops and other foreign matter cost of materials, labour, complete as per
specification.
Same as that of 126.92
126.92
external plastering Sqm
12 Plastic Emulsion Paint KSRB 15-15.1 : Providing Applying painting in two coats with
plastic emulsion paint of approved brand on wall surface to give an even approved shade
after thoroughly brushing the surface, free from mortal drops and other foreign matter
including preparing surface even and sand paper smooth cost of materials labour.
Complete as per specification.
Same as that of
210.12 210.12Sqm
inside plastering
13 KSRB 15-17.6 : Providing and applying painting two coats ( excluding priming coat ) on
new wood surface and / or wood based surface with enamel paint to give an even shade,
cleaning the surface of all dirt, dust and foreign matter, sand papering including cost of
materials, labour, complete as per specifications.
ABSTRACT OF ESTIMATE
1530868.7
TOTAL Rs.
1
Add 8.0 % for Electrification 122469.50
Add 6.0 % for Water supply
91852.12
and Sanitation
Add 5% for Architectural
76543.44
charges
GRAND 1821733.7
TOTAL Rs. 6
Say Rs. 182200.00
OUTCOMES
General outcomes of internship
Importance of documentation.
Was able to identify reason for the problems arise during the construction.
CONCLUSION
To know about how to get the work done from the labors.
By this internship, I came to know about the practical conditions on the site.
SITE VISITING