PORTFOLIO
BOARD OF DIRECTORS
DIRECTOR OF DIRECTOR OF
ENGINEERING ADMINISTRATION
- Final preparation of the documents necessary for the bid package such as the drawings
specifications, general conditions, and bill of quantities are ready.
- All documents need to be closely reviewed by the construction manager and appropriat
owner personnel to decrease conflicts, and changes.
- With the contract documents are almost complete; a detailed and complete cost
estimate for the project can be done.
FINANCIAL ANALYST
Here's a possible financial layout for spending 55,000,000 to build a three-story building with fifty-four rooms:
Foundation: 2,000,000
Framing: 3,500,000
Roofing: 1,000,000
Exterior Finishing: 1,500,000
Interior Finishing: 5,000,000
HVAC: 2,000,000
Plumbing: 1,500,000
Electrical: 1,000,000
Total: 18,500,000
Professional Fees:
Architect: 2,500,000
Engineer: 2,000,000
Permitting: 500,000
Project Management: 1,000,000
Total: 6,000,000
Contingency Fund:
- This stage begins with a public advertisement for all interested bidders or an invitation
for specific bidders.
- If the projects are in phases, each work package will be advertised and bid out
individually.
- It is a very important stage to select highly qualified contractors. It is not wise to select
under-bid contractors.
3. Construction phase
- This stage takes the project from procurement through the final completion.
- It is the time where the bulk of the owner’s funds will be spent.
- It is the outcome of all previous stages (i.e., good preparation means smooth
construction).
4. Closeout phase
- Transition from design and construction to the actual use of the constructed facility.
- In this stage, the management team must provide documentation, shop drawings,
as-built drawings, and operation manuals to the owner organization.
- The as-built drawings are the original contract drawings adjusted to reflect all the
changes that occurred.
Project
Overview
• A shopping complex
• A 3-storey building
• 54 rooms
• Ground and first floor consist
of 14 rooms each, Second and
third floor consist of 13 rooms
each. Two toilet to a floor.
• At GRA, Benin City, Edo
State.
SITE SAFETY AND PERSONAL PROTECTIVE EQUIPMENT (PPE)
- Site preperation
- Site clearance and setting out
- Excavation
- Foundation blinding
- Bar bending work for column base, starter column and ground beam
- Back filling and compaction
- Laying of DPM , Wire mesh and Hardcore
- Formwork for slab
- Casting of slab
- Formwork for columns
- Casting of columns
CAUSES OF PROBLEM
1. Economic Factors: Economic downturns, fluctuations in material costs, or changes in
interest rates affected the financial viability of the construction project and impacted on
the company's ability to achieve desired results.
2. Document Changes:
Clearly document any changes in project specifications, designs, or timelines.
Ensure that all relevant parties have access to updated project documentation.