You are on page 1of 1

EXHAUST FAN FORMULA TOILET = (5 No. of min./Air Change) Air Flow = volume in cu ft/No.

of min/air change KITCHEN = V/3 WASH = V/5 GENERAL VENTILATION REQUIREMENTS (EXHAUST) Auditorium = 5 No. of min/Air Change Bakeries = 3 Banquer Halls = 3 Boiler Rooms = 1 Bowling Alleys = 5 Cafeterias = 5 Classrooms = 6 Cleaning & Drying = 5 Club Rooms = 5 Churches = 5 Creameries = 6 Dance Halls = 5 Dining Room = 5 Dormitories = 6 Engine Room = 2 Factories = 6 Garages = 6 Kitchens = 2 Laboratories = 5 Laundries = 3 Lodge Rooms = 3 Machine Shop = 6 Recreation Room = 5 Residences = 4 Sales Room = 6 Ship Holds = 6 Bilets = 3 Tunnels = 10 HVAC DUCT SHEET GAUGE 18 = 10.525 KG/SQ M GAUGE 20 = 8.084 KG/SQ M GAUGE 22 = 8.864 KG/SQ M GAUGE 24 = 5.643 KG/SQ M GAUGE 26 = 4.423 KG/SQ M RECTANGULAR GALVANIZED DUCT SHEET as per SMACNA (-+500Pa, +2WG) DIMENSION(inch) = DUCT GAGE (mm) Up to 10 = 26 gages (0.50mm) 11 22 = 24 (0.63mm)

23 29 37 49 55 61 73 85

28 36 48 54 60 72 84 96

= = = = = = = =

24 22 22 22 20 18 18 18

(0.63mm) (0.79mm) (0.79mm) (0.79mm) (0.91mm) (1.21mm) (1.21mm) (1.21mm)

SCHEDULE FOR SHORT RADIUS ELBOW (minimum throat radius = 4) Duct Width (inch) = No. of Vanes Up to 12 = none 12 13 = 1 vanes 21 39 = 2 40 Above = 3 ELBOW DEPTH (H) REQUIRED = No. of Tie Rods Up to 12 = none 13 20 = 1 21 48 = 2 49 64 = 3 65 80 = 4 DUCT HANGER SCHEDULE Longest Dimension of Duct(mm)=Hanger Rod Size(mm)=Trapeze Shelf Angle Size(mm)=Max. Spacing(mm) up to 760=6dia rod=25x25x3=3000 770 to 1070=8=40x40x4=3000 1080 to 1520=10=40x40x4=3000 1530 & greater=10=50x50x5=3000

You might also like