Professional Documents
Culture Documents
PRICE SCHEDULE FOR CIVIL, STEEL STRUCTUAL, PIPING AND MECHANICAL INSTALLATION WORKS
SUMMARY SHEET
OFFER PRICE
Currency
Remark
COST ITEM
1. Direct Work Cost 1.1 Materials 1.2 Labour ( Direct Laour Only ) 1.3 Construction Equipment 1.4 Inland Transportation Cost Sub - total (1) 2. Indirect Work Cost and Expenses 2.1 Common Temporary Facilities a) Construction Facilities b) Camp Facilities 2.2 Transporttion and Insurance, Etc.
(Baht)
85,000.00 75,000.00
a) Construction Equipment b) Common Temporary Facilities 2.3 Material Handling and Storing 2.4 Supervisory and Adminstrative Staff and Labour 2.5 Travelling Expenses a) Staff b) Labour 2.6 Scaffolding will be provided by VNT 2.7 Camp Operation 2.8 Field Office Expenses 2.9 Home Office Expenses 2.10 Insurances, Taxes and Duties 2.11 HSE Sub - total (2) 3. Overhead and Profit Sub - total (3) 18%
35,000.00
1,420,000.00
2,047,188.24
13,420,456.24
PRICE SCHEDULE FOR CIVIL, STEEL STRUCTUAL, PIPING AND MECHANICAL INSTALLATION WORKS CCK Engineering and construction Co.,Ltd. STEEL STRUCTUREFABRICATION / INSTALLATION
Date27.11.56
Rev.00
DEMOLITION OF EXISTING WORK FOR DRAINAGE 1 DEMOLISH EXISTING STAIR AND ITS PEDESTALS 1.00 set
65,000
65,000
65,000
OPERATING PLATFORM 1 CONCRETE STRUCTURE NON-SHRINK GROUT CONCRETE, fc' = 280 ksc. (Cylinder 28 days) FORMWORK DEFORM BAR, DB 10 DEFORM BAR, DB 12 DEFORM BAR, DB 16 EPOXY (HIT-RE 500SD) CHEMICAL BOLT M16 CHEMICAL BOLT M20 0.04 1.00 6.00 28.00 11.00 23.00 1.00 32.00 2.00 m3 m3 m2 kg. kg. kg. SETS SETS SETS
STEEL STRUCTURE COLUMN H-150x150x7x10 COLUMN H-200x200x8x12 BEAM H-194X150X6X9 BEAM H-300X150X6.5 BEAM C-125X65X6X8 BEAM H-350X175X7X11 BRACING L-65x65x6 590.00 1,318.00 1,381.00 1,575.00 620.00 2,401.00 326.00 kg. kg. kg. kg. kg. kg. kg.
38 38 38 38 38 38 38
PRICE SCHEDULE FOR CIVIL, STEEL STRUCTUAL, PIPING AND MECHANICAL INSTALLATION WORKS CCK Engineering and construction Co.,Ltd. STEEL STRUCTUREFABRICATION / INSTALLATION
Date27.11.56
Rev.00
Unit Cost. Total Cost Unit Cost. Total Cost STAIR C-180x75x7x10.5 Grating 32x3t Stair Tread 32X3t (L800 X W270) Stair Tread 32X3t (L1000 X W270) PL-10t PL-12t PL-22t PL-28t HEX BOLT M12x25 HEX BOLT M16x40 HEX BOLT M20x45 PIPE 1-1/2"X3.5t PIPE 3/4"X2.8t FB-120x6t PL-6t PL-9t HEX BOLT M20x35 FB-50x12t FB-50x8t FB-50x6t RB 20 PIPE 1-1/4"X3.2t L-50x50x5 PAINTING 542.00 90.00 13.00 14.00 411.00 49.00 254.00 237.00 110.00 40.00 560.00 700.00 139.00 467.00 50.00 19.00 150.00 42.00 18.00 15.00 123.00 2.00 2.00 330.00 kg. m2 SETS SETS kg. kg. kg. kg. SETS SETS SETS kg. kg. kg. kg. kg. SETS kg. kg. kg. kg. kg. kg. m2 38.00 2,750 1,500.00 1,800.00 28.00 28.00 30.00 30.00 35.00 45.00 65.00 28.00 28.00 28.00 28.00 28.00 65.00 28.00 28.00 28.00 28.00 28.00 38.00 350.00 20,596 247,500 19,500 25,200 11,508 1,372 7,620 7,110 3,850 1,800 36,400 19,600 3,892 13,076 1,400 532 9,750 1,176 504 420 3,444 56 76 115,500 38 150 200 200 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 180 20,596 13,500 2,600 2,800 15,618 1,862 9,652 9,006 4,180 1,520 21,280 26,600 5,282 17,746 1,900 722 5,700 1,596 684 570 4,674 76 76 59,400 41,192 261,000 22,100 28,000 27,126 3,234 17,272 16,116 8,030 3,320 57,680 46,200 9,174 30,822 3,300 1,254 15,450 2,772 1,188 990 8,118 132 152 174,900
PRICE SCHEDULE FOR CIVIL, STEEL STRUCTUAL, PIPING AND MECHANICAL INSTALLATION WORKS CCK Engineering and construction Co.,Ltd. STEEL STRUCTUREFABRICATION / INSTALLATION
Date27.11.56
Rev.00
PIPE RACK "X" SECTION 2 1 EXTENSION PIPE RACK COLUMN AND BEAM H-194X150X6X9 BEAM H-200X100X5.5X8 BRACING L-75x75x6 PL-10t HEX BOLT M20x50 PAINTING 6,867.00 1,172.00 596.00 432.00 320.00 242.00 kg. kg. kg. kg. SETS m2
38 38 38 38 38 180
PRICE SCHEDULE FOR CIVIL, STEEL STRUCTUAL, PIPING AND MECHANICAL INSTALLATION WORKS CCK Engineering and construction Co.,Ltd. STEEL STRUCTUREFABRICATION / INSTALLATION
Date27.11.56
Rev.00
Unit Cost. Total Cost Unit Cost. Total Cost 4 SPECIAL PIPE SUPPORT 1 FOUNDATION EXCAVATION COMPACTED SUBGRADE COMPACTED SAND CONCRETE, fc' = 280 ksc. (Cylinder 28 days) LEAN CONCRETE, fc' = 100 ksc. (Cylinder 28 days) BACKFILL 119.00 3.00 3.00 16.00 3.00 96.00 23.00 49.00 155.00 2,750.00 0.10 48.00 m3 m3 m3 m3 m3 m3 m3 m2 kg. kg. m3 SETS
DISPOSAL FORMWORK DEFORM BAR, DB 12 DEFORM BAR, DB 20 NON-SHRINK GROUT ANCHOR BOLT M20
STEEL STRUCTURE COLUMN AND BEAM H-200x200x8x12 PL-10t PL-25t PAINTING 1,375.00 176.00 277.00 44.00 kg. kg. kg. m2
38 38 38 180
BLOWER FOUNDATION
FOUNDATION
PRICE SCHEDULE FOR CIVIL, STEEL STRUCTUAL, PIPING AND MECHANICAL INSTALLATION WORKS CCK Engineering and construction Co.,Ltd. STEEL STRUCTUREFABRICATION / INSTALLATION
Date27.11.56
Rev.00
Unit Cost. Total Cost Unit Cost. Total Cost CONCRETE, fc' = 280 ksc. (Cylinder 28 days) FORMWORK DEFORM BAR, DB 16 CHEMICAL BOLT M16 NON-SHRINK GROUT HILTI-HIT-RE500-SD 1.40 2.80 109.60 6.60 0.20 1.00 kg. m2 kg. kg. m3 SETS
PAVING EXCAVATION BACKFILL 16.00 4.00 12.00 12.00 2.00 2.00 10.00 515.00 m3 m3 m3 m2 m3 m3 m3 kg.
DISPOSAL FORMWORK LEAN CONCRETE, fc' = 100 ksc. (Cylinder 28 days) COMPACTED SAND CONCRETE, fc' = 280 ksc. (Cylinder 28 days) DEFORM BAR, DB 12
#######
#######
2,472,268
PRICE SCHEDULE FOR CIVIL, STEEL STRUCTUAL, PIPING AND MECHANICAL INSTALLATION WORKS CCK Engineering and construction Co.,Ltd. STEEL STRUCTUREFABRICATION / INSTALLATION
Date27.11.56
Rev.00
PRICE SCHEDULE FOR CIVIL, STEEL STRUCTUAL, PIPING AND MECHANICAL INSTALLATION WORKS
SUBCONTRACTOR SCOPE
CODE
WORK ITEM
BOQ
UNIT
MATERIAL SUPPLY
LABOUR SUPPLY
TOTAL AMOUNT
UNIT COST
AMOUNT
UNIT COST
AMOUNT
4,250.00
DB
700.00
2,975,000.00
2,975,000.00
100.00
DB
700.00
70,000.00
70,000.00
Stub on
80.00
DB
700.00
56,000.00
56,000.00
1.00
LOT
110,750.00
110,750.00
110,750.00
Pressure test
1.00
LOT
85,000.00
85,000.00
85,000.00
300.00
DB
850.00
255,000.00
255,000.00
1.00
LOT
9,000.00
9,000.00
9,000.00
Pressure test
1.00
LOT
8,500.00
8,500.00
8,500.00 -
Painting
2,350.00
m2
350.00
822,500.00
180.00
423,000.00
1,245,500.00
Pipe Support
3,000.00
kg
55.00
165,000.00
38.00
114,000.00
279,000.00
Valve Installation
169.00
In-PC
250.00
42,250.00
42,250.00
1.00
Lot
987,500.00
Page 9 of 23
4,148,500.00
5,136,000.00
PRICE SCHEDULE FOR CIVIL, STEEL STRUCTUAL, PIPING AND MECHANICAL INSTALLATION WORKS
EQUIPMENT ISTALLATION
SUBCONTRACTOR SCOPE
CODE
WORK ITEM
BOQ
UNIT
MATERIAL SUPPLY
LABOUR SUPPLY
TOTAL AMOUNT
UNIT COST
TOTAL COST
UNIT COST
TOTAL COST
1.00
EA
1.00
EA
120,000.00
120,000.00
120,000.00
1.00
EA
85,000.00
85,000.00
85,000.00
Page 10 of 23
########
290,000.00
Page 11 of 23
PRICE SCHEDULE FOR CIVIL, STEEL STRUCTUAL, PIPING AND MECHANICAL INSTALLATION WORKS
MANPOWERS RATES
Manpowers Rates
Hourly Rate
Remarks
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Site Manager Construction Superintendent Engineer Supervisor QA/QC Inspector Foreman Technician Rigger Mechanic Pipe Fitter Steel Fitter Pipe Welder Plate Welder Helper
15 16 17 18 19 20 21 22 23
Labour Material Controller Draftman Safety Officer Safety Inspector Driver Store Keeper Fire Watchman Electrician
Note : 1) The above rate is based on 8 working hour per day. If Working time in excess of 8 hours per day will be considered as overtime in which case the hourly rates shall be - Monday to Saturday = 1.5 times - Night Shift = 1.2 times - Sunday / National Holiday : Normal working time = 2.0 times - Sunday / National Holiday : Other working time = 3.0 times
PRICE SCHEDULE FOR CIVIL, STEEL STRUCTUAL, PIPING AND MECHANICAL INSTALLATION WORKS
Equipment Category
Hourly Rate
Remarks
1 2 3 4 5 6 7 8 9
Truck Crane 25 Ton Truck Crane 45 Ton Truck Mounted Crane 5 Ton 4-Work Truck (Pick up) Fork-Lift 5 Ton Fork-Lift 2 Ton Arc Welding Machine Tig Welding Machine 7" Grinding Machine
2,250.00 3,200.00 820.00 250.00 350.00 300.00 35.00 50.00 20.00 15.00 35.00 50.00 100.00 35.00 20.00 100.00
10 4" Grinding Machine 11 Electric Cutting Machine for Disc 14" 12 Drilling Machine 13 Gas Cutting Set (included Gas) 14 Electrod Oven 100 Kgs 15 Portable Welding Rod Dryer 16 Tapping Machine
17 Pipe Bender 18 Hydraulic Test Pump 19 Air Compressor (included fuel,lubricant oil) 20 Chain Block 0.5 Ton ~ 5 Ton 21 Scaffolding 22 Generator 100 KVA 23 Other (Specified by Contractor)
Note : 1) The above rate is included Fuel,Lubricant oil. 2) The above rate is excluded operator and consumable accessories
PRICE SCHEDULE FOR CIVIL, STEEL STRUCTUAL, PIPING AND MECHANICAL INSTALLATION WORKS
PIPING MATERIALS
Size
Q'ty
Materail
Rev.
Unit Cost. Total Cost
Remark
PIPING CLASS 131 PIPES 1 PIPE SCH.80 ANSI B36-10 ASTM A106B PE-PLAIN ENDS SEAMLESS 2 PIPE SCH.80 ANSI B36-10 ASTM A106B PE-PLAIN ENDS SEAMLESS 3 PIPE SCH.40 ANSI B36-10 ASTM A106B BE-ANSI B16-25 SEAMLESS 4 PIPE SCH.40 ANSI B36-10 ASTM A106B BE-ANSI B16-25 SEAMLESS 5 PIPE SCH.40 ANSI B36-10 ASTM A106B BE-ANSI B16-25 SEAMLESS 6 PIPE SCH.40 ANSI B36-10 ASTM A106B BE-ANSI B16-25 SEAMLESS FITTINGS 7 ELBOW 45 SCH.40 ANSI B16-9 ASTM A234 WPB BW-ANSI B16-25 BUTTWELD, 131 LR 3 8 ELBOW 45 SCH.40 ANSI B16-9 ASTM A234 WPB BW-ANSI B16-25 BUTTWELD, 131 LR 6 9 ELBOW 90 SCH.80 ANSI B16-9 ASTM A234 WPB BW-ANSI B16-25 BUTTWELD, 131 LR 1 10 ELBOW 90 SCH.40 ANSI B16-9 ASTM A234 WPB BW-ANSI B16-25 BUTTWELD, 131 LR 2 11 ELBOW 90 SCH.40 ANSI B16-9 ASTM A234 WPB BW-ANSI B16-25 BUTTWELD, 131 LR 6 12 WELDOLET SCH.40 x 80 ANSI B16-25 ASTM A105 BW-ANSI B16-25 13 WELDOLET SCH.40 x 80 ANSI B16-25 ASTM A105 BW-ANSI B16-25 14 WELDOLET SCH.40 x 80 ANSI B16-25 ASTM A105 BW-ANSI B16-25 15 WELDOLET SCH.40 x 80 ANSI B16-25 ASTM A105 BW-ANSI B16-25 16 WELDOLET SCH.40 x 80 ANSI B16-25 ASTM A105 BW-ANSI B16-25 17 WELDOLET SCH.40 x 80 ANSI B16-25 ASTM A105 BW-ANSI B16-25 18 WELDOLET SCH.40 x 80 ANSI B16-25 ASTM A105 BW-ANSI B16-25 131 131 131 131 131 1 x 3/4 2 x 3/4 2x1 3x1 6 x 3/4 2 9 21 14 11 3 2 1 1 2 1 1 1 1 1 1 2 2 2 EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA 131 131 131 131 131 131 1 1 1/2 2 3 6 10 24 6 36 6 48 6 M M M M M M
19 REDUCER ECC SCH.40 x 80 ANSI B16-9 ASTM A234 WPB BW-ANSI B16-25 131 BUTTWELD 2x1 20 SPECTACLE BLIND 150# RF ANSI B16-5 ASTM A516/70 STM-01.10 21 SPECTACLE BLIND 150# RF ANSI B16-5 ASTM A516/70 STM-01.10 22 SPECTACLE BLIND 150# RF ANSI B16-5 ASTM A516/70 STM-01.10 23 SPECTACLE BLIND 150# RF ANSI B16-5 ASTM A516/70 STM-01.10 24 TEE SCH.80 ANSI B16-9 ASTM A234 WPB BW-ANSI B16-25 25 TEE SCH.40 ANSI B16-9 ASTM A234 WPB BW-ANSI B16-25 131 131 131 131 131 131 1 2 3 6 1 10
PRICE SCHEDULE FOR CIVIL, STEEL STRUCTUAL, PIPING AND MECHANICAL INSTALLATION WORKS
PIPING MATERIALS
Size
Q'ty
Materail
Rev.
Unit Cost. Total Cost
Remark
FLANGES 26 FLANGE WN 150# RF ANSI B16-5 ASTM A105 BW-ANSI B16-25 WN. BORE 131 SCH.803/4 27 FLANGE WN 150# RF ANSI B16-5 ASTM A105 BW-ANSI B16-25 WN. BORE 131 SCH.80 1 28 FLANGE WN 300# RF ANSI B16-5 ASTM A105 BW-ANSI B16-25 WN. BORE 131 SCH.80 1 1/2 29 FLANGE WN 150# RF ANSI B16-5 ASTM A105 BW-ANSI B16-25 WN. BORE 131 SCH.40 2 30 FLANGE WN 150# RF ANSI B16-5 ASTM A105 BW-ANSI B16-25 WN. BORE 131 SCH.40 3 31 FLANGE WN 150# RF ANSI B16-5 ASTM A105 BW-ANSI B16-25 WN. BORE 131 SCH.40 6 32 FLANGE WN 150# RF ANSI B16-5 ASTM A105 BW-ANSI B16-25 WN. BORE 131 SCH.4010 33 FLANGE BLIND 150# RF ANSI B16-5 ASTM A105 34 FLANGE BLIND 150# RF ANSI B16-5 ASTM A105 35 FLANGE BLIND 150# RF ANSI B16-5 ASTM A105 GASKETS 36 GASKET 150# RF 3 MM KLINGER-SIL C4400 37 GASKET 150# RF 3 MM KLINGER-SIL C4400 38 GASKET 300# RF 3 MM KLINGER-SIL C4400 39 GASKET 150# RF 3 MM KLINGER-SIL C4400 40 GASKET 150# RF 3 MM KLINGER-SIL C4400 41 GASKET 150# RF 3 MM KLINGER-SIL C4400 42 GASKET 300# RF 3 MM KLINGER-SIL C4400 43 GASKET 150# RF 3 MM KLINGER-SIL C4400 BOLTS&NUTS 44 65MM BOLT FULL THD ANSI B16-5 ASTM A193-B7 / ASTM A194-2H HEX NUTS 131 1/2 1/2 1/2 3/4 3/4 3/4 3/4 66 106 4 4 35 18 13 SET SET SET SET SET SET SET 131 131 131 131 131 131 131 131 3/4 1 1 1/2 2 3 6 6 10 14 29 1 15 6 15 2 6 EA EA EA EA EA EA EA EA 131 131 131 3/4 1 2 8 20 1 6 3 13 7 8 3 3 EA EA EA EA EA EA EA EA EA EA
70MM BOLT FULL THD ANSI B16-5 ASTM A193-B7 / ASTM A194-2H HEX NUTS 45 131 46 90MM BOLT FULL THD ANSI B16-5 ASTM A193-B7 / ASTM A194-2H HEX NUTS 131
90MM BOLT FULL THD ANSI B16-5 ASTM A193-B7 / ASTM A194-2H HEX NUTS 47 131 100MM BOLT FULL THD ANSI B16-5 ASTM A193-B7 / ASTM A194-2H HEX NUTS 48 131 120MM BOLT FULL THD ANSI B16-5 ASTM A193-B7 / ASTM A194-2H HEX NUTS 49 131 140MM BOLT FULL THD ANSI B16-5 ASTM A193-B7 / ASTM A194-2H HEX NUTS 50 131
PRICE SCHEDULE FOR CIVIL, STEEL STRUCTUAL, PIPING AND MECHANICAL INSTALLATION WORKS
PIPING MATERIALS
Size
Q'ty
Materail
Rev.
Unit Cost. Total Cost
Remark
51
160MM BOLT FULL THD ANSI B16-5 ASTM A193-B7 / ASTM A194-2H HEX NUTS 131
18 48 18 4
80MM BOLT FULL THD ANSI B16-5 ASTM A193-B7 / ASTM A194-2H HEX NUTS 52 131 95MM BOLT FULL THD ANSI B16-5 ASTM A193-B7 / ASTM A194-2H HEX NUTS 53 131 110MM BOLT FULL THD ANSI B16-5 ASTM A193-B7 / ASTM A194-2H HEX NUTS 54 131 VALVES 55 VALVE GATE 150# RF CS/A182 F6 56 VALVE GATE 150# RF CS/A182 F6 57 VALVE GLOBE 150# RF CS/A182 F6 58 VALVE GATE 150# RF CS/A182 F6 59 VALVE GATE 150# RF CS/A182 F6 60 VALVE BUTTERFLY 150# RF WAFER ANSI B16-5 Cl/EPDM LO 61 VALVE GATE 150# RF CS/A182 F6 62 VALVE GLOBE 150# RF CS/A182 F6 63 SPECIAL ITEMS 64 LIQUID DRAIN TRAP (SP-001, SP-002) 65 LIQUID DRAIN TRAP (SP-003) PIPING CLASS 138 PIPES 66 PIPE SCH.80 ANSI B36-10 ASTM A106B PE-PLAIN ENDS SEAMLESS 67 PIPE SCH.80 ANSI B36-10 ASTM A106B PE-PLAIN ENDS SEAMLESS 68 PIPE SCH.80 ANSI B36-10 ASTM A106B PE-PLAIN ENDS SEAMLESS 69 PIPE SCH.40 ANSI B36-10 ASTM A53B BE-ANSI B16-25 WELDED 70 PIPE SCH.40 ANSI B36-10 ASTM A53B BE-ANSI B16-25 WELDED 71 PIPE SCH.40 ANSI B36-10 ASTM A53B BE-ANSI B16-25 WELDED 72 PIPE SCH.40 ANSI B36-10 ASTM A53B BE-ANSI B16-25 WELDED 73 PIPE SDT.WT. ANSI B36-10 ASTM A53B BE-ANSI B16-25 WELDED 74 PIPE SDT.WT. ANSI B36-10 ASTM A139B BE-ANSI B16-25 WELDED 75 PIPE SDT.WT. ANSI B36-10 ASTM A139B BE-ANSI B16-25 WELDED 138 138 138 138 138 138 138 138 138 138 131 131 131 131 131 131 131 131 131 131
3/4 1 1 2 3 6 6 6
6 8 1 5 1 2 2 1
EA EA EA EA EA EA EA EA
1 2
2 1
EA EA
1/2 1 1 1/2 2 4 6 10 12 16 18
6 6 6 6 6 6 30 84 582 12
M M M M M M M M M M
PRICE SCHEDULE FOR CIVIL, STEEL STRUCTUAL, PIPING AND MECHANICAL INSTALLATION WORKS
PIPING MATERIALS
Size
Q'ty
Materail
Rev.
Unit Cost. Total Cost
Remark
FITTINGS 76 ELBOW 45 SCH.40 ANSI B16-9 ASTM A234 WPB BW-ANSI B16-25 BUTTWELD, 138 LR 10 77 ELBOW 45 SDT.WT. ANSI B16-9 ASTM A234 WPB BW-ANSI B16-25 BUTTWELD, 138 LR 12 78 ELBOW 45 SDT.WT. ANSI B16-9 ASTM A234 WPB BW-ANSI B16-25 BUTTWELD, 138 LR 16 79 ELBOW 90 SCH.40 ANSI B16-9 ASTM A234 WPB BW-ANSI B16-25 BUTTWELD, 138 LR 10 80 ELBOW 90 SCH.40 ANSI B16-9 ASTM A234 WPB BW-ANSI B16-25 BUTTWELD, 138 LR 12 81 ELBOW 90 SDT.WT. ANSI B16-9 ASTM A234 WPB BW-ANSI B16-25 BUTTWELD, 138 LR 16 82 ELBOW 90 SDT.WT. ANSI B16-9 ASTM A234 WPB BW-ANSI B16-25 BUTTWELD, 138 LR 18 83 REDUCER CON SDT.WT. ANSI B16-9 ASTM A234 WPB BW-ANSI B16-25 BUTTWELD 138 16 x 12 1 2 9 4 13 33 3 1 EA EA EA EA EA EA EA EA EA EA EA EA EA
84 REDUCER ECC SDT.WT. x SCH 40 ANSI B16-9 ASTM A234 WPB BW-ANSI138 B16-25 12BUTTWELD x 10 2 85 REDUCER ECC SDT.WT. ANSI B16-9 ASTM A234 WPB BW-ANSI B16-25 BUTTWELD 138 16 x 12 86 REDUCER ECC SDT.WT. ANSI B16-9 ASTM A234 WPB BW-ANSI B16-25 BUTTWELD 138 18 x 16 87 TEE SCH.40 ANSI B16-9 ASTM A234 WPB BW-ANSI B16-25 88 TEE SDT.WT. ANSI B16-9 ASTM A234 WPB BW-ANSI B16-25 FLANGES 89 FLANGE WN 150# RF ANSI B16-5 ASTM A105 BW-ANSI B16-25 WN. BORE 138 SCH.801/2 90 FLANGE WN 150# RF ANSI B16-5 ASTM A105 BW-ANSI B16-25 WN. BORE 138 SCH.80 1 91 FLANGE WN 150# RF ANSI B16-5 ASTM A105 BW-ANSI B16-25 WN. BORE 138 SCH.40 2 92 FLANGE WN 150# RF ANSI B16-5 ASTM A105 BW-ANSI B16-25 WN. BORE 138 SCH.40 4 93 FLANGE WN 150# RF ANSI B16-5 ASTM A105 BW-ANSI B16-25 WN. BORE 138 SCH.40 6 94 FLANGE WN 150# RF ANSI B16-5 ASTM A105 BW-ANSI B16-25 WN. BORE 138 SCH.4010 95 FLANGE WN 150# RF ANSI B16-5 ASTM A105 BW-ANSI B16-25 WN. BORE 138 SDT.WT 12 96 FLANGE WN 150# RF ANSI B16-5 ASTM A105 BW-ANSI B16-25 WN. BORE 138 SDT.WT 16 97 FLANGE WN 150# RF ANSI B16-5 ASTM A105 BW-ANSI B16-25 WN. BORE 138 SDT.WT 18 98 FLANGE WN 300# RF ANSI B16-5 ASTM A105 BW-ANSI B16-25 WN. BORE 138 SCH.80 1 1/2 99 FLANGE BLIND 150# RF ANSI B16-5 ASTM A105 ## FLANGE BLIND 150# RF ANSI B16-5 ASTM A105 ## FLANGE BLIND 150# RF ANSI B16-5 ASTM A105 138 138 138 1/2 1 2 2 10 2 8 2 15 3 13 6 2 2 8 2 138 138 10 16 3 1 1 2
EA EA EA EA EA EA EA EA EA EA EA EA EA
PRICE SCHEDULE FOR CIVIL, STEEL STRUCTUAL, PIPING AND MECHANICAL INSTALLATION WORKS
PIPING MATERIALS
Size
Q'ty
Materail
Rev.
Unit Cost. Total Cost
Remark
## FLANGE BLIND 150# RF ANSI B16-5 ASTM A105 ## FLANGE BLIND 150# RF ANSI B16-5 ASTM A105 GASKETS ## GASKET 150# RF 4.5 MM SPW CS/GPH/CS ## GASKET 150# RF 4.5 MM SPW CS/GPH/CS ## GASKET 300# RF 4.5 MM SPW CS/GPH/CS ## GASKET 150# RF 4.5 MM SPW CS/GPH/CS ## GASKET 150# RF 4.5 MM SPW CS/GPH/CS ## GASKET 150# RF 4.5 MM SPW CS/GPH/CS ## GASKET 150# RF 4.5 MM SPW CS/GPH/CS ## GASKET 150# RF 4.5 MM SPW CS/GPH/CS ## GASKET 150# RF 4.5 MM SPW CS/GPH/CS BOLTS&NUTS ## ##
138 138
6 16
2 1
EA EA
1/2 1 1 1/2 2 6 10 12 16 18
4 18 2 3 2 14 4 12 6
EA EA EA EA EA EA EA EA EA
70MM BOLT FULL THD ANSI B16-5 ASTM A193-B7 / ASTM A194-2H HEX NUTS 138 60MM BOLT FULL THD ANSI B16-5 ASTM A193-B7 / ASTM A194-2H HEX NUTS 138
70 18 9 18 13 92 66 123 35 18 35
SET SET SET SET SET SET SET SET SET SET SET
90MM BOLT FULL THD ANSI B16-5 ASTM A193-B7 / ASTM A194-2H HEX NUTS ## 138 ## 100MM BOLT FULL THD ANSI B16-5 ASTM A193-B7 / ASTM A194-2H HEX NUTS 138
80MM BOLT FULL THD ANSI B16-5 ASTM A193-B7/ ASTM A194-2H HEX NUTS ## 138 120MM BOLT FULL THD ANSI B16-5 ASTM A193-B7 / ASTM A194-2H HEX NUTS ## 138 200MM BOLT FULL THD ANSI B16-5 ASTM A193-B7 / ASTM A194-2H HEX NUTS ## 138 140MM BOLT FULL THD ANSI B16-5 ASTM A193-B7 / ASTM A194-2H HEX NUTS ## 138 ## 255MM BOLT FULL THD ANSI B16-5 ASTM A193-B7 / ASTM A194-2H HEX NUTS 138
150MM BOLT FULL THD ANSI B16-5 ASTM A193-B7 / ASTM A194-2H HEX NUTS 1 1/8 ## 138 ## 275MM BOLT FULL THD ANSI B16-5 ASTM A193-B7 / ASTM A194-2H HEX NUTS 1 1/8 138 VALVES ## VALVE DIAPHRAGM 125# FF ANSI B16-5 ASTM A182 F304 125D1 ## VALVE DIAPHRAGM 125# FF ANSI B16-5 ASTM A182 F304 125D1 ## VALVE DIAPHRAGM 125# FF ANSI B16-5 ASTM A182 F304 125D1 138 138 138 1/2 1 2
2 8 1
EA EA EA
PRICE SCHEDULE FOR CIVIL, STEEL STRUCTUAL, PIPING AND MECHANICAL INSTALLATION WORKS
PIPING MATERIALS
Size
Q'ty
Materail
Rev.
Unit Cost. Total Cost
Remark
## VALVE BUTTERFLY 150# RF WAFER ANSI B16-5 CAST IRON / EPDM GO 138 ## VALVE BUTTERFLY 150# RF WAFER ANSI B16-5 CAST IRON / EPDM GO 138 SPECIAL ITEMS ## EXPANSION JOINT (SP-007) ## EXPANSION JOINT (SP-006) ## LIQUID DRAIN TRAP (SP-008) PIPING CLASS 237 PIPES ## PIPE SCH.40S ANSI B36-19 ASTM A312 TP304L PE-PLAIN ENDS EFW ## PIPE SCH.10S ANSI B36-19 ASTM A312 TP304L BE-ANSI B16-25 EFW FITTINGS 237 237 138 138 138
10 18
3 2
EA EA
12 16 3/4
1 1 4
EA EA EA
1/2 4
6 24
M M
## ELBOW 90 SCH.10S ANSI B16-9 ASTM A403 WP304L BW-ANSI B16-25 BUTTWELD, 237 4LR ## STUB-ENDS SCH. 10S MSS SP 43 TYPE A ASTM A403 WP304L BW-ANSI B16-25 237 SHORT 4 FLANGES
23 31
EA EA
## FLANGE WN 150# RF ANSI B16-5 ASTM A182 F304L BW-ANSI B16-25 WN.237 BORE SCH.40S 1/2 8 ## FLANGE LAP 150# RF ANSI B16-5 ASTM A105 ## FLANGE BLIND 150# RF ANSI B16-5 ASTM A182 F304L GASKETS ## GASKET 150# RF 3 MM KLINGER-SIL C4400 ## GASKET 150# RF 3 MM KLINGER-SIL C4400 BOLTS&NUTS ## 60MM BOLT FULL THD ANSI B16-5 ASTM A193-B7/ ASTM A194-2H HEX NUTS 237 ## 95MM BOLT FULL THD ANSI B16-5 ASTM A193-B7/ ASTM A194-2H HEX NUTS 237 ## 150MM BOLT FULL THD ANSI B16-5 ASTM A193-B7/ ASTM A194-2H HEX NUTS 237 VALVES ## VALVE DIAPHRAGM 150# RF ANSI B16-5 ASTM A182 F304 150D2 DIAPHRAGM 237 B 1/2 7 1/2 5/8 5/8 62 62 31 237 237 1/2 4 15 31 237 237 4 1/2 31 8
EA EA EA
EA EA
EA EA
## VALVE BUTTERFLY 150# RF WAFER ANSI B16-5 ASTM A351 CF8M / PTFE 237 DISC : AISI 4 316L LO 7 PIPIE SUPPORT
PRICE SCHEDULE FOR CIVIL, STEEL STRUCTUAL, PIPING AND MECHANICAL INSTALLATION WORKS
PIPING MATERIALS
Size
Q'ty
Materail
Rev.
Unit Cost. Total Cost
Remark
## PIPES PIPE 4" SCH.40 ANSI B36-10 ASTM A106B BE-ANSI B16-25 SEAMLESS PIPE 8" SCH.40 ANSI B36-10 ASTM A106B BE-ANSI B16-25 SEAMLESS PIPE 8" SCH.40 ANSI B36-10 ASTM A53B BE-ANSI B16-25 WELDED PIPE 10" SCH.40 ANSI B36-10 ASTM A53B BE-ANSI B16-25 WELDED PIPE 12" STD.WT. ANSI B36-10 ASTM A53B BE-ANSI B16-25 WELDED ## STEEL SHAPES L40x40x5 L50x50x6 L65x65x6 L75x75x9 L100x100x10 C125x65x6 C150x75x6.5 H100x100x6x8 H150x150x7x10 H200x200x8x12 ## STEEL PLATES PLATE 230x230x9t PLATE 260x260x9t PLATE 320x290x12t PLATE 320x300x12t PLATE 330x330x16t PLATE 380x380x16t PLATE 490x490x16t PLATE 560x560x16t ## EXPANSION BOLTS EXPANSION BOLT 5/8"x127L 5/8"x127L 12 SET 1 3 8 16 3 2 3 1 EA EA EA EA EA EA EA EA 1 3.3 20 17 1 9 9 16 40 4 M M M M M M M M M M 4" 8" 8" 10" 12" 1.5 1 2 1.5 1.5 M M M M M
PRICE SCHEDULE FOR CIVIL, STEEL STRUCTUAL, PIPING AND MECHANICAL INSTALLATION WORKS
PIPING MATERIALS
Size
Q'ty
Materail
Rev.
Unit Cost. Total Cost
Remark
EXPANSION BOLT 3/4"x152L EXPANSION BOLT 7/8"x178L ## U-BOLTS U-BOLT FOR CS PIPE 1" U-BOLT FOR CS PIPE 2" U-BOLT FOR CS PIPE 3" U-BOLT FOR CS PIPE 6" U-BOLT FOR CS PIPE 16" ## PTFE SHEET 1200x1200 x3t Total Piping Material
3/4"x152L 7/8"x178L
12 4
SET SET
9 8 1 2 1 6
NOTES; 1. UNIT OF PIPES AND STEEL SHAPES USED IN THIS MTO IS "METRE". VENDOR SHALL CONVERT THE UNIT TO SUIT THE STANDARD LENGTH (NORMALLY 6 METRES ). 2. MATERIAL SPECIFICATION FOR STEEL PLATE IS ASTM A283 GR.C HOT ROLLED OR JIS B3101 SS400. 3. MATERIAL SPECIFICATION FOR STEEL SHAPE IS ASTM A36 OR EQ. 4. MATERIAL SPECIFICATION FOR EXPANSION BOLT IS ASTM A325. 5. MATERIAL SPECIFICATION FOR U-BOLT IS ASTM A307 GR.B/A563 GR.A.