ITB REFERENCE NUMBER 4251-VCM-ITB-T322-001 SEND VCM EMISSION TO INCINERATOR PROJECT

PRICE SCHEDULE FOR CIVIL, STEEL STRUCTUAL, PIPING AND MECHANICAL INSTALLATION WORKS

SUMMARY SHEET

OFFER PRICE

Currency

Remark

COST ITEM
1. Direct Work Cost 1.1 Materials 1.2 Labour ( Direct Laour Only ) 1.3 Construction Equipment 1.4 Inland Transportation Cost Sub - total (1) 2. Indirect Work Cost and Expenses 2.1 Common Temporary Facilities a) Construction Facilities b) Camp Facilities 2.2 Transporttion and Insurance, Etc.

(Baht)

2,377,460.00 5,520,808.00 850,000.00 550,000.00 9,298,268.00

85,000.00 75,000.00

a) Construction Equipment b) Common Temporary Facilities 2.3 Material Handling and Storing 2.4 Supervisory and Adminstrative Staff and Labour 2.5 Travelling Expenses a) Staff b) Labour 2.6 Scaffolding will be provided by VNT 2.7 Camp Operation 2.8 Field Office Expenses 2.9 Home Office Expenses 2.10 Insurances, Taxes and Duties 2.11 HSE Sub - total (2) 3. Overhead and Profit Sub - total (3) 18%

35,000.00

1,420,000.00

45,000.00 150,000.00 65,000.00 200,000.00 2,075,000.00

2,047,188.24

Grand Total Excluded VAT

13,420,456.24

ITB REFERENCE NUMBER 4251-VCM-ITB-T322-001 SEND VCM EMISSION TO INCINERATOR PROJECT

PRICE SCHEDULE FOR CIVIL, STEEL STRUCTUAL, PIPING AND MECHANICAL INSTALLATION WORKS CCK Engineering and construction Co.,Ltd. STEEL STRUCTUREFABRICATION / INSTALLATION
Date27.11.56

Rev.00

Materail Item Description Quantity Unit

Labour Total Amount

Unit Cost. Total Cost Unit Cost. Total Cost

DEMOLITION OF EXISTING WORK FOR DRAINAGE 1 DEMOLISH EXISTING STAIR AND ITS PEDESTALS 1.00 set

65,000

65,000

65,000

OPERATING PLATFORM 1 CONCRETE STRUCTURE NON-SHRINK GROUT CONCRETE, fc' = 280 ksc. (Cylinder 28 days) FORMWORK DEFORM BAR, DB 10 DEFORM BAR, DB 12 DEFORM BAR, DB 16 EPOXY (HIT-RE 500SD) CHEMICAL BOLT M16 CHEMICAL BOLT M20 0.04 1.00 6.00 28.00 11.00 23.00 1.00 32.00 2.00 m3 m3 m2 kg. kg. kg. SETS SETS SETS

STEEL STRUCTURE COLUMN H-150x150x7x10 COLUMN H-200x200x8x12 BEAM H-194X150X6X9 BEAM H-300X150X6.5 BEAM C-125X65X6X8 BEAM H-350X175X7X11 BRACING L-65x65x6 590.00 1,318.00 1,381.00 1,575.00 620.00 2,401.00 326.00 kg. kg. kg. kg. kg. kg. kg.

38.00 38.00 38.00 38.00 38.00 38.00 38.00

22,420 50,084 52,478 59,850 23,560 91,238 12,388

38 38 38 38 38 38 38

22,420 50,084 52,478 59,850 23,560 91,238 12,388

44,840 100,168 104,956 119,700 47,120 182,476 24,776

ITB REFERENCE NUMBER 4251-VCM-ITB-T322-001 SEND VCM EMISSION TO INCINERATOR PROJECT

PRICE SCHEDULE FOR CIVIL, STEEL STRUCTUAL, PIPING AND MECHANICAL INSTALLATION WORKS CCK Engineering and construction Co.,Ltd. STEEL STRUCTUREFABRICATION / INSTALLATION
Date27.11.56

Rev.00

Materail Item Description Quantity Unit

Labour Total Amount

Unit Cost. Total Cost Unit Cost. Total Cost STAIR C-180x75x7x10.5 Grating 32x3t Stair Tread 32X3t (L800 X W270) Stair Tread 32X3t (L1000 X W270) PL-10t PL-12t PL-22t PL-28t HEX BOLT M12x25 HEX BOLT M16x40 HEX BOLT M20x45 PIPE 1-1/2"X3.5t PIPE 3/4"X2.8t FB-120x6t PL-6t PL-9t HEX BOLT M20x35 FB-50x12t FB-50x8t FB-50x6t RB 20 PIPE 1-1/4"X3.2t L-50x50x5 PAINTING 542.00 90.00 13.00 14.00 411.00 49.00 254.00 237.00 110.00 40.00 560.00 700.00 139.00 467.00 50.00 19.00 150.00 42.00 18.00 15.00 123.00 2.00 2.00 330.00 kg. m2 SETS SETS kg. kg. kg. kg. SETS SETS SETS kg. kg. kg. kg. kg. SETS kg. kg. kg. kg. kg. kg. m2 38.00 2,750 1,500.00 1,800.00 28.00 28.00 30.00 30.00 35.00 45.00 65.00 28.00 28.00 28.00 28.00 28.00 65.00 28.00 28.00 28.00 28.00 28.00 38.00 350.00 20,596 247,500 19,500 25,200 11,508 1,372 7,620 7,110 3,850 1,800 36,400 19,600 3,892 13,076 1,400 532 9,750 1,176 504 420 3,444 56 76 115,500 38 150 200 200 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 180 20,596 13,500 2,600 2,800 15,618 1,862 9,652 9,006 4,180 1,520 21,280 26,600 5,282 17,746 1,900 722 5,700 1,596 684 570 4,674 76 76 59,400 41,192 261,000 22,100 28,000 27,126 3,234 17,272 16,116 8,030 3,320 57,680 46,200 9,174 30,822 3,300 1,254 15,450 2,772 1,188 990 8,118 132 152 174,900

ITB REFERENCE NUMBER 4251-VCM-ITB-T322-001 SEND VCM EMISSION TO INCINERATOR PROJECT

PRICE SCHEDULE FOR CIVIL, STEEL STRUCTUAL, PIPING AND MECHANICAL INSTALLATION WORKS CCK Engineering and construction Co.,Ltd. STEEL STRUCTUREFABRICATION / INSTALLATION
Date27.11.56

Rev.00

Materail Item Description Quantity Unit

Labour Total Amount

Unit Cost. Total Cost Unit Cost. Total Cost

PIPE RACK "X" SECTION 2 1 EXTENSION PIPE RACK COLUMN AND BEAM H-194X150X6X9 BEAM H-200X100X5.5X8 BRACING L-75x75x6 PL-10t HEX BOLT M20x50 PAINTING 6,867.00 1,172.00 596.00 432.00 320.00 242.00 kg. kg. kg. kg. SETS m2

38.00 38.00 38.00 28.00 65.00 350.00

260,946 44,536 22,648 12,096 20,800 84,700

38 38 38 38 38 180

260,946 44,536 22,648 16,416 12,160 43,560

521,892 89,072 45,296 28,512 32,960 128,260

ITB REFERENCE NUMBER 4251-VCM-ITB-T322-001 SEND VCM EMISSION TO INCINERATOR PROJECT

PRICE SCHEDULE FOR CIVIL, STEEL STRUCTUAL, PIPING AND MECHANICAL INSTALLATION WORKS CCK Engineering and construction Co.,Ltd. STEEL STRUCTUREFABRICATION / INSTALLATION
Date27.11.56

Rev.00

Materail Item Description Quantity Unit

Labour Total Amount

Unit Cost. Total Cost Unit Cost. Total Cost 4 SPECIAL PIPE SUPPORT 1 FOUNDATION EXCAVATION COMPACTED SUBGRADE COMPACTED SAND CONCRETE, fc' = 280 ksc. (Cylinder 28 days) LEAN CONCRETE, fc' = 100 ksc. (Cylinder 28 days) BACKFILL 119.00 3.00 3.00 16.00 3.00 96.00 23.00 49.00 155.00 2,750.00 0.10 48.00 m3 m3 m3 m3 m3 m3 m3 m2 kg. kg. m3 SETS

DISPOSAL FORMWORK DEFORM BAR, DB 12 DEFORM BAR, DB 20 NON-SHRINK GROUT ANCHOR BOLT M20

STEEL STRUCTURE COLUMN AND BEAM H-200x200x8x12 PL-10t PL-25t PAINTING 1,375.00 176.00 277.00 44.00 kg. kg. kg. m2

38.00 28.00 28.00 350.00

52,250 4,928 7,756 15,400

38 38 38 180

52,250 6,688 10,526 7,920

104,500 11,616 18,282 23,320

BLOWER FOUNDATION

FOUNDATION

ITB REFERENCE NUMBER 4251-VCM-ITB-T322-001 SEND VCM EMISSION TO INCINERATOR PROJECT

PRICE SCHEDULE FOR CIVIL, STEEL STRUCTUAL, PIPING AND MECHANICAL INSTALLATION WORKS CCK Engineering and construction Co.,Ltd. STEEL STRUCTUREFABRICATION / INSTALLATION
Date27.11.56

Rev.00

Materail Item Description Quantity Unit

Labour Total Amount

Unit Cost. Total Cost Unit Cost. Total Cost CONCRETE, fc' = 280 ksc. (Cylinder 28 days) FORMWORK DEFORM BAR, DB 16 CHEMICAL BOLT M16 NON-SHRINK GROUT HILTI-HIT-RE500-SD 1.40 2.80 109.60 6.60 0.20 1.00 kg. m2 kg. kg. m3 SETS

PAVING EXCAVATION BACKFILL 16.00 4.00 12.00 12.00 2.00 2.00 10.00 515.00 m3 m3 m3 m2 m3 m3 m3 kg.

DISPOSAL FORMWORK LEAN CONCRETE, fc' = 100 ksc. (Cylinder 28 days) COMPACTED SAND CONCRETE, fc' = 280 ksc. (Cylinder 28 days) DEFORM BAR, DB 12

Total Civil Cost

#######

#######

2,472,268

ITB REFERENCE NUMBER 4251-VCM-ITB-T322-001 SEND VCM EMISSION TO INCINERATOR PROJECT

PRICE SCHEDULE FOR CIVIL, STEEL STRUCTUAL, PIPING AND MECHANICAL INSTALLATION WORKS CCK Engineering and construction Co.,Ltd. STEEL STRUCTUREFABRICATION / INSTALLATION
Date27.11.56

Rev.00

Materail Item Description Quantity Unit

Labour Total Amount

Unit Cost. Total Cost Unit Cost. Total Cost

NOTE Steel structure shall confirm to JIS G 3444

Carbon steel bolts and nuts

2.1 Anchor bolts shall confirm to ASTM A307

2.2 Nuts shall confirm to ASTM A307

High strength bolts and nuts

3.1 Bolts shall confirm to ASTM A325

3.2 Nuts shall confirm to ASTM A325

Steel pipe shall confirm to ASTM A53 type E, grade B

Galvanized shall confirm to ASTM A153

All reinforcing steel shall confirm to TIS 24-2527(1984) SD 40

All cement shall confirm to ASTM C150 type - I

ITB REFERENCE NUMBER 4251-VCM-ITB-T322-001

SEND VCM EMISSION TO INCINERATOR PROJECT

PRICE SCHEDULE FOR CIVIL, STEEL STRUCTUAL, PIPING AND MECHANICAL INSTALLATION WORKS

PIPING FABRICATION / INSTALLATION

SUBCONTRACTOR SCOPE

CODE

WORK ITEM

BOQ

UNIT

MATERIAL SUPPLY

LABOUR SUPPLY

TOTAL AMOUNT

UNIT COST

AMOUNT

UNIT COST

AMOUNT

CARBON STEEL PIPING

Shop fabrication S.40 / STD schedule

4,250.00

DB

700.00

2,975,000.00

2,975,000.00

Shop fabrication S.80

100.00

DB

700.00

70,000.00

70,000.00

Stub on

80.00

DB

700.00

56,000.00

56,000.00

NDE (PT100% Cover)

1.00

LOT

110,750.00

110,750.00

110,750.00

Pressure test

1.00

LOT

85,000.00

85,000.00

85,000.00

STAINLESS STEEL PIPING

Shop fabrication/ Installation

300.00

DB

850.00

255,000.00

255,000.00

NDE (PT100% Cover)

1.00

LOT

9,000.00

9,000.00

9,000.00

Pressure test

1.00

LOT

8,500.00

8,500.00

8,500.00 -

Painting

2,350.00

m2

350.00

822,500.00

180.00

423,000.00

1,245,500.00

Pipe Support

3,000.00

kg

55.00

165,000.00

38.00

114,000.00

279,000.00

Valve Installation

169.00

In-PC

250.00

42,250.00

42,250.00

Scaffolding is provised by VNT

1.00

Lot

TOTAL DIRECT COST

987,500.00
Page 9 of 23

4,148,500.00

5,136,000.00

ITB REFERENCE NUMBER 4251-VCM-ITB-T322-001 SEND VCM EMISSION TO INCINERATOR PROJECT

PRICE SCHEDULE FOR CIVIL, STEEL STRUCTUAL, PIPING AND MECHANICAL INSTALLATION WORKS

EQUIPMENT ISTALLATION

SUBCONTRACTOR SCOPE

CODE

WORK ITEM

BOQ

UNIT

MATERIAL SUPPLY

LABOUR SUPPLY

TOTAL AMOUNT

UNIT COST

TOTAL COST

UNIT COST

TOTAL COST

MAIN EQUIPMENT 85,000.00 85,000.00 85,000.00

VCM EFFLUENT FOAM SEPARATOR

1.00

EA

VCM EFFLUENT BLOWER

1.00

EA

120,000.00

120,000.00

120,000.00

VCM EFFLUENT COOLER

1.00

EA

85,000.00

85,000.00

85,000.00

Page 10 of 23

TOTAL DIRECT COST

########

290,000.00

Page 11 of 23

ITB REFERENCE NUMBER 4251-VCM-ITB-T322-001 SEND VCM EMISSION TO INCINERATOR PROJECT

PRICE SCHEDULE FOR CIVIL, STEEL STRUCTUAL, PIPING AND MECHANICAL INSTALLATION WORKS

MANPOWERS RATES

Manpowers Rates

Hourly Rate

Remarks

1 2 3 4 5 6 7 8 9 10 11 12 13 14

Site Manager Construction Superintendent Engineer Supervisor QA/QC Inspector Foreman Technician Rigger Mechanic Pipe Fitter Steel Fitter Pipe Welder Plate Welder Helper

650 250 150 150 75 120 75 75 75 85 85 150 100 65

15 16 17 18 19 20 21 22 23

Labour Material Controller Draftman Safety Officer Safety Inspector Driver Store Keeper Fire Watchman Electrician

65 100 100 120 85 65 65 75 65

Note : 1) The above rate is based on 8 working hour per day. If Working time in excess of 8 hours per day will be considered as overtime in which case the hourly rates shall be - Monday to Saturday = 1.5 times - Night Shift = 1.2 times - Sunday / National Holiday : Normal working time = 2.0 times - Sunday / National Holiday : Other working time = 3.0 times

ITB REFERENCE NUMBER 4251-VCM-ITB-T322-001 SEND VCM EMISSION TO INCINERATOR PROJECT

PRICE SCHEDULE FOR CIVIL, STEEL STRUCTUAL, PIPING AND MECHANICAL INSTALLATION WORKS

CONSTRUCTION EQUIPMENT RATES

Equipment Category

Hourly Rate

Remarks

1 2 3 4 5 6 7 8 9

Truck Crane 25 Ton Truck Crane 45 Ton Truck Mounted Crane 5 Ton 4-Work Truck (Pick up) Fork-Lift 5 Ton Fork-Lift 2 Ton Arc Welding Machine Tig Welding Machine 7" Grinding Machine

2,250.00 3,200.00 820.00 250.00 350.00 300.00 35.00 50.00 20.00 15.00 35.00 50.00 100.00 35.00 20.00 100.00

10 4" Grinding Machine 11 Electric Cutting Machine for Disc 14" 12 Drilling Machine 13 Gas Cutting Set (included Gas) 14 Electrod Oven 100 Kgs 15 Portable Welding Rod Dryer 16 Tapping Machine

17 Pipe Bender 18 Hydraulic Test Pump 19 Air Compressor (included fuel,lubricant oil) 20 Chain Block 0.5 Ton ~ 5 Ton 21 Scaffolding 22 Generator 100 KVA 23 Other (Specified by Contractor)

50.00 50.00 450.00 25.00 450.00

Note : 1) The above rate is included Fuel,Lubricant oil. 2) The above rate is excluded operator and consumable accessories

ITB REFERENCE NUMBER 4251-VCM-ITB-T322-001 SEND VCM EMISSION TO INCINERATOR PROJECT

PRICE SCHEDULE FOR CIVIL, STEEL STRUCTUAL, PIPING AND MECHANICAL INSTALLATION WORKS

PIPING MATERIALS

Pipe Item Material Description

Size

Q'ty

Materail

Unit (Class) (Inch)


Final

Rev.
Unit Cost. Total Cost

Remark

PIPING CLASS 131 PIPES 1 PIPE SCH.80 ANSI B36-10 ASTM A106B PE-PLAIN ENDS SEAMLESS 2 PIPE SCH.80 ANSI B36-10 ASTM A106B PE-PLAIN ENDS SEAMLESS 3 PIPE SCH.40 ANSI B36-10 ASTM A106B BE-ANSI B16-25 SEAMLESS 4 PIPE SCH.40 ANSI B36-10 ASTM A106B BE-ANSI B16-25 SEAMLESS 5 PIPE SCH.40 ANSI B36-10 ASTM A106B BE-ANSI B16-25 SEAMLESS 6 PIPE SCH.40 ANSI B36-10 ASTM A106B BE-ANSI B16-25 SEAMLESS FITTINGS 7 ELBOW 45 SCH.40 ANSI B16-9 ASTM A234 WPB BW-ANSI B16-25 BUTTWELD, 131 LR 3 8 ELBOW 45 SCH.40 ANSI B16-9 ASTM A234 WPB BW-ANSI B16-25 BUTTWELD, 131 LR 6 9 ELBOW 90 SCH.80 ANSI B16-9 ASTM A234 WPB BW-ANSI B16-25 BUTTWELD, 131 LR 1 10 ELBOW 90 SCH.40 ANSI B16-9 ASTM A234 WPB BW-ANSI B16-25 BUTTWELD, 131 LR 2 11 ELBOW 90 SCH.40 ANSI B16-9 ASTM A234 WPB BW-ANSI B16-25 BUTTWELD, 131 LR 6 12 WELDOLET SCH.40 x 80 ANSI B16-25 ASTM A105 BW-ANSI B16-25 13 WELDOLET SCH.40 x 80 ANSI B16-25 ASTM A105 BW-ANSI B16-25 14 WELDOLET SCH.40 x 80 ANSI B16-25 ASTM A105 BW-ANSI B16-25 15 WELDOLET SCH.40 x 80 ANSI B16-25 ASTM A105 BW-ANSI B16-25 16 WELDOLET SCH.40 x 80 ANSI B16-25 ASTM A105 BW-ANSI B16-25 17 WELDOLET SCH.40 x 80 ANSI B16-25 ASTM A105 BW-ANSI B16-25 18 WELDOLET SCH.40 x 80 ANSI B16-25 ASTM A105 BW-ANSI B16-25 131 131 131 131 131 1 x 3/4 2 x 3/4 2x1 3x1 6 x 3/4 2 9 21 14 11 3 2 1 1 2 1 1 1 1 1 1 2 2 2 EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA 131 131 131 131 131 131 1 1 1/2 2 3 6 10 24 6 36 6 48 6 M M M M M M

131 6 x 1 1/2 131 6 x 1 1/2

19 REDUCER ECC SCH.40 x 80 ANSI B16-9 ASTM A234 WPB BW-ANSI B16-25 131 BUTTWELD 2x1 20 SPECTACLE BLIND 150# RF ANSI B16-5 ASTM A516/70 STM-01.10 21 SPECTACLE BLIND 150# RF ANSI B16-5 ASTM A516/70 STM-01.10 22 SPECTACLE BLIND 150# RF ANSI B16-5 ASTM A516/70 STM-01.10 23 SPECTACLE BLIND 150# RF ANSI B16-5 ASTM A516/70 STM-01.10 24 TEE SCH.80 ANSI B16-9 ASTM A234 WPB BW-ANSI B16-25 25 TEE SCH.40 ANSI B16-9 ASTM A234 WPB BW-ANSI B16-25 131 131 131 131 131 131 1 2 3 6 1 10

ITB REFERENCE NUMBER 4251-VCM-ITB-T322-001 SEND VCM EMISSION TO INCINERATOR PROJECT

PRICE SCHEDULE FOR CIVIL, STEEL STRUCTUAL, PIPING AND MECHANICAL INSTALLATION WORKS

PIPING MATERIALS

Pipe Item Material Description

Size

Q'ty

Materail

Unit (Class) (Inch)


Final

Rev.
Unit Cost. Total Cost

Remark

FLANGES 26 FLANGE WN 150# RF ANSI B16-5 ASTM A105 BW-ANSI B16-25 WN. BORE 131 SCH.803/4 27 FLANGE WN 150# RF ANSI B16-5 ASTM A105 BW-ANSI B16-25 WN. BORE 131 SCH.80 1 28 FLANGE WN 300# RF ANSI B16-5 ASTM A105 BW-ANSI B16-25 WN. BORE 131 SCH.80 1 1/2 29 FLANGE WN 150# RF ANSI B16-5 ASTM A105 BW-ANSI B16-25 WN. BORE 131 SCH.40 2 30 FLANGE WN 150# RF ANSI B16-5 ASTM A105 BW-ANSI B16-25 WN. BORE 131 SCH.40 3 31 FLANGE WN 150# RF ANSI B16-5 ASTM A105 BW-ANSI B16-25 WN. BORE 131 SCH.40 6 32 FLANGE WN 150# RF ANSI B16-5 ASTM A105 BW-ANSI B16-25 WN. BORE 131 SCH.4010 33 FLANGE BLIND 150# RF ANSI B16-5 ASTM A105 34 FLANGE BLIND 150# RF ANSI B16-5 ASTM A105 35 FLANGE BLIND 150# RF ANSI B16-5 ASTM A105 GASKETS 36 GASKET 150# RF 3 MM KLINGER-SIL C4400 37 GASKET 150# RF 3 MM KLINGER-SIL C4400 38 GASKET 300# RF 3 MM KLINGER-SIL C4400 39 GASKET 150# RF 3 MM KLINGER-SIL C4400 40 GASKET 150# RF 3 MM KLINGER-SIL C4400 41 GASKET 150# RF 3 MM KLINGER-SIL C4400 42 GASKET 300# RF 3 MM KLINGER-SIL C4400 43 GASKET 150# RF 3 MM KLINGER-SIL C4400 BOLTS&NUTS 44 65MM BOLT FULL THD ANSI B16-5 ASTM A193-B7 / ASTM A194-2H HEX NUTS 131 1/2 1/2 1/2 3/4 3/4 3/4 3/4 66 106 4 4 35 18 13 SET SET SET SET SET SET SET 131 131 131 131 131 131 131 131 3/4 1 1 1/2 2 3 6 6 10 14 29 1 15 6 15 2 6 EA EA EA EA EA EA EA EA 131 131 131 3/4 1 2 8 20 1 6 3 13 7 8 3 3 EA EA EA EA EA EA EA EA EA EA

70MM BOLT FULL THD ANSI B16-5 ASTM A193-B7 / ASTM A194-2H HEX NUTS 45 131 46 90MM BOLT FULL THD ANSI B16-5 ASTM A193-B7 / ASTM A194-2H HEX NUTS 131

90MM BOLT FULL THD ANSI B16-5 ASTM A193-B7 / ASTM A194-2H HEX NUTS 47 131 100MM BOLT FULL THD ANSI B16-5 ASTM A193-B7 / ASTM A194-2H HEX NUTS 48 131 120MM BOLT FULL THD ANSI B16-5 ASTM A193-B7 / ASTM A194-2H HEX NUTS 49 131 140MM BOLT FULL THD ANSI B16-5 ASTM A193-B7 / ASTM A194-2H HEX NUTS 50 131

ITB REFERENCE NUMBER 4251-VCM-ITB-T322-001 SEND VCM EMISSION TO INCINERATOR PROJECT

PRICE SCHEDULE FOR CIVIL, STEEL STRUCTUAL, PIPING AND MECHANICAL INSTALLATION WORKS

PIPING MATERIALS

Pipe Item Material Description

Size

Q'ty

Materail

Unit (Class) (Inch)


Final

Rev.
Unit Cost. Total Cost

Remark

51

160MM BOLT FULL THD ANSI B16-5 ASTM A193-B7 / ASTM A194-2H HEX NUTS 131

3/4 5/8 5/8 5/8

18 48 18 4

SET SET SET SET

80MM BOLT FULL THD ANSI B16-5 ASTM A193-B7 / ASTM A194-2H HEX NUTS 52 131 95MM BOLT FULL THD ANSI B16-5 ASTM A193-B7 / ASTM A194-2H HEX NUTS 53 131 110MM BOLT FULL THD ANSI B16-5 ASTM A193-B7 / ASTM A194-2H HEX NUTS 54 131 VALVES 55 VALVE GATE 150# RF CS/A182 F6 56 VALVE GATE 150# RF CS/A182 F6 57 VALVE GLOBE 150# RF CS/A182 F6 58 VALVE GATE 150# RF CS/A182 F6 59 VALVE GATE 150# RF CS/A182 F6 60 VALVE BUTTERFLY 150# RF WAFER ANSI B16-5 Cl/EPDM LO 61 VALVE GATE 150# RF CS/A182 F6 62 VALVE GLOBE 150# RF CS/A182 F6 63 SPECIAL ITEMS 64 LIQUID DRAIN TRAP (SP-001, SP-002) 65 LIQUID DRAIN TRAP (SP-003) PIPING CLASS 138 PIPES 66 PIPE SCH.80 ANSI B36-10 ASTM A106B PE-PLAIN ENDS SEAMLESS 67 PIPE SCH.80 ANSI B36-10 ASTM A106B PE-PLAIN ENDS SEAMLESS 68 PIPE SCH.80 ANSI B36-10 ASTM A106B PE-PLAIN ENDS SEAMLESS 69 PIPE SCH.40 ANSI B36-10 ASTM A53B BE-ANSI B16-25 WELDED 70 PIPE SCH.40 ANSI B36-10 ASTM A53B BE-ANSI B16-25 WELDED 71 PIPE SCH.40 ANSI B36-10 ASTM A53B BE-ANSI B16-25 WELDED 72 PIPE SCH.40 ANSI B36-10 ASTM A53B BE-ANSI B16-25 WELDED 73 PIPE SDT.WT. ANSI B36-10 ASTM A53B BE-ANSI B16-25 WELDED 74 PIPE SDT.WT. ANSI B36-10 ASTM A139B BE-ANSI B16-25 WELDED 75 PIPE SDT.WT. ANSI B36-10 ASTM A139B BE-ANSI B16-25 WELDED 138 138 138 138 138 138 138 138 138 138 131 131 131 131 131 131 131 131 131 131

3/4 1 1 2 3 6 6 6

6 8 1 5 1 2 2 1

EA EA EA EA EA EA EA EA

1 2

2 1

EA EA

1/2 1 1 1/2 2 4 6 10 12 16 18

6 6 6 6 6 6 30 84 582 12

M M M M M M M M M M

ITB REFERENCE NUMBER 4251-VCM-ITB-T322-001 SEND VCM EMISSION TO INCINERATOR PROJECT

PRICE SCHEDULE FOR CIVIL, STEEL STRUCTUAL, PIPING AND MECHANICAL INSTALLATION WORKS

PIPING MATERIALS

Pipe Item Material Description

Size

Q'ty

Materail

Unit (Class) (Inch)


Final

Rev.
Unit Cost. Total Cost

Remark

FITTINGS 76 ELBOW 45 SCH.40 ANSI B16-9 ASTM A234 WPB BW-ANSI B16-25 BUTTWELD, 138 LR 10 77 ELBOW 45 SDT.WT. ANSI B16-9 ASTM A234 WPB BW-ANSI B16-25 BUTTWELD, 138 LR 12 78 ELBOW 45 SDT.WT. ANSI B16-9 ASTM A234 WPB BW-ANSI B16-25 BUTTWELD, 138 LR 16 79 ELBOW 90 SCH.40 ANSI B16-9 ASTM A234 WPB BW-ANSI B16-25 BUTTWELD, 138 LR 10 80 ELBOW 90 SCH.40 ANSI B16-9 ASTM A234 WPB BW-ANSI B16-25 BUTTWELD, 138 LR 12 81 ELBOW 90 SDT.WT. ANSI B16-9 ASTM A234 WPB BW-ANSI B16-25 BUTTWELD, 138 LR 16 82 ELBOW 90 SDT.WT. ANSI B16-9 ASTM A234 WPB BW-ANSI B16-25 BUTTWELD, 138 LR 18 83 REDUCER CON SDT.WT. ANSI B16-9 ASTM A234 WPB BW-ANSI B16-25 BUTTWELD 138 16 x 12 1 2 9 4 13 33 3 1 EA EA EA EA EA EA EA EA EA EA EA EA EA

84 REDUCER ECC SDT.WT. x SCH 40 ANSI B16-9 ASTM A234 WPB BW-ANSI138 B16-25 12BUTTWELD x 10 2 85 REDUCER ECC SDT.WT. ANSI B16-9 ASTM A234 WPB BW-ANSI B16-25 BUTTWELD 138 16 x 12 86 REDUCER ECC SDT.WT. ANSI B16-9 ASTM A234 WPB BW-ANSI B16-25 BUTTWELD 138 18 x 16 87 TEE SCH.40 ANSI B16-9 ASTM A234 WPB BW-ANSI B16-25 88 TEE SDT.WT. ANSI B16-9 ASTM A234 WPB BW-ANSI B16-25 FLANGES 89 FLANGE WN 150# RF ANSI B16-5 ASTM A105 BW-ANSI B16-25 WN. BORE 138 SCH.801/2 90 FLANGE WN 150# RF ANSI B16-5 ASTM A105 BW-ANSI B16-25 WN. BORE 138 SCH.80 1 91 FLANGE WN 150# RF ANSI B16-5 ASTM A105 BW-ANSI B16-25 WN. BORE 138 SCH.40 2 92 FLANGE WN 150# RF ANSI B16-5 ASTM A105 BW-ANSI B16-25 WN. BORE 138 SCH.40 4 93 FLANGE WN 150# RF ANSI B16-5 ASTM A105 BW-ANSI B16-25 WN. BORE 138 SCH.40 6 94 FLANGE WN 150# RF ANSI B16-5 ASTM A105 BW-ANSI B16-25 WN. BORE 138 SCH.4010 95 FLANGE WN 150# RF ANSI B16-5 ASTM A105 BW-ANSI B16-25 WN. BORE 138 SDT.WT 12 96 FLANGE WN 150# RF ANSI B16-5 ASTM A105 BW-ANSI B16-25 WN. BORE 138 SDT.WT 16 97 FLANGE WN 150# RF ANSI B16-5 ASTM A105 BW-ANSI B16-25 WN. BORE 138 SDT.WT 18 98 FLANGE WN 300# RF ANSI B16-5 ASTM A105 BW-ANSI B16-25 WN. BORE 138 SCH.80 1 1/2 99 FLANGE BLIND 150# RF ANSI B16-5 ASTM A105 ## FLANGE BLIND 150# RF ANSI B16-5 ASTM A105 ## FLANGE BLIND 150# RF ANSI B16-5 ASTM A105 138 138 138 1/2 1 2 2 10 2 8 2 15 3 13 6 2 2 8 2 138 138 10 16 3 1 1 2

EA EA EA EA EA EA EA EA EA EA EA EA EA

ITB REFERENCE NUMBER 4251-VCM-ITB-T322-001 SEND VCM EMISSION TO INCINERATOR PROJECT

PRICE SCHEDULE FOR CIVIL, STEEL STRUCTUAL, PIPING AND MECHANICAL INSTALLATION WORKS

PIPING MATERIALS

Pipe Item Material Description

Size

Q'ty

Materail

Unit (Class) (Inch)


Final

Rev.
Unit Cost. Total Cost

Remark

## FLANGE BLIND 150# RF ANSI B16-5 ASTM A105 ## FLANGE BLIND 150# RF ANSI B16-5 ASTM A105 GASKETS ## GASKET 150# RF 4.5 MM SPW CS/GPH/CS ## GASKET 150# RF 4.5 MM SPW CS/GPH/CS ## GASKET 300# RF 4.5 MM SPW CS/GPH/CS ## GASKET 150# RF 4.5 MM SPW CS/GPH/CS ## GASKET 150# RF 4.5 MM SPW CS/GPH/CS ## GASKET 150# RF 4.5 MM SPW CS/GPH/CS ## GASKET 150# RF 4.5 MM SPW CS/GPH/CS ## GASKET 150# RF 4.5 MM SPW CS/GPH/CS ## GASKET 150# RF 4.5 MM SPW CS/GPH/CS BOLTS&NUTS ## ##

138 138

6 16

2 1

EA EA

138 138 138 138 138 138 138 138 138

1/2 1 1 1/2 2 6 10 12 16 18

4 18 2 3 2 14 4 12 6

EA EA EA EA EA EA EA EA EA

70MM BOLT FULL THD ANSI B16-5 ASTM A193-B7 / ASTM A194-2H HEX NUTS 138 60MM BOLT FULL THD ANSI B16-5 ASTM A193-B7 / ASTM A194-2H HEX NUTS 138

1/2 1/2 3/4 3/4 5/8 7/8 7/8 1 1

70 18 9 18 13 92 66 123 35 18 35

SET SET SET SET SET SET SET SET SET SET SET

90MM BOLT FULL THD ANSI B16-5 ASTM A193-B7 / ASTM A194-2H HEX NUTS ## 138 ## 100MM BOLT FULL THD ANSI B16-5 ASTM A193-B7 / ASTM A194-2H HEX NUTS 138

80MM BOLT FULL THD ANSI B16-5 ASTM A193-B7/ ASTM A194-2H HEX NUTS ## 138 120MM BOLT FULL THD ANSI B16-5 ASTM A193-B7 / ASTM A194-2H HEX NUTS ## 138 200MM BOLT FULL THD ANSI B16-5 ASTM A193-B7 / ASTM A194-2H HEX NUTS ## 138 140MM BOLT FULL THD ANSI B16-5 ASTM A193-B7 / ASTM A194-2H HEX NUTS ## 138 ## 255MM BOLT FULL THD ANSI B16-5 ASTM A193-B7 / ASTM A194-2H HEX NUTS 138

150MM BOLT FULL THD ANSI B16-5 ASTM A193-B7 / ASTM A194-2H HEX NUTS 1 1/8 ## 138 ## 275MM BOLT FULL THD ANSI B16-5 ASTM A193-B7 / ASTM A194-2H HEX NUTS 1 1/8 138 VALVES ## VALVE DIAPHRAGM 125# FF ANSI B16-5 ASTM A182 F304 125D1 ## VALVE DIAPHRAGM 125# FF ANSI B16-5 ASTM A182 F304 125D1 ## VALVE DIAPHRAGM 125# FF ANSI B16-5 ASTM A182 F304 125D1 138 138 138 1/2 1 2

2 8 1

EA EA EA

ITB REFERENCE NUMBER 4251-VCM-ITB-T322-001 SEND VCM EMISSION TO INCINERATOR PROJECT

PRICE SCHEDULE FOR CIVIL, STEEL STRUCTUAL, PIPING AND MECHANICAL INSTALLATION WORKS

PIPING MATERIALS

Pipe Item Material Description

Size

Q'ty

Materail

Unit (Class) (Inch)


Final

Rev.
Unit Cost. Total Cost

Remark

## VALVE BUTTERFLY 150# RF WAFER ANSI B16-5 CAST IRON / EPDM GO 138 ## VALVE BUTTERFLY 150# RF WAFER ANSI B16-5 CAST IRON / EPDM GO 138 SPECIAL ITEMS ## EXPANSION JOINT (SP-007) ## EXPANSION JOINT (SP-006) ## LIQUID DRAIN TRAP (SP-008) PIPING CLASS 237 PIPES ## PIPE SCH.40S ANSI B36-19 ASTM A312 TP304L PE-PLAIN ENDS EFW ## PIPE SCH.10S ANSI B36-19 ASTM A312 TP304L BE-ANSI B16-25 EFW FITTINGS 237 237 138 138 138

10 18

3 2

EA EA

12 16 3/4

1 1 4

EA EA EA

1/2 4

6 24

M M

## ELBOW 90 SCH.10S ANSI B16-9 ASTM A403 WP304L BW-ANSI B16-25 BUTTWELD, 237 4LR ## STUB-ENDS SCH. 10S MSS SP 43 TYPE A ASTM A403 WP304L BW-ANSI B16-25 237 SHORT 4 FLANGES

23 31

EA EA

## FLANGE WN 150# RF ANSI B16-5 ASTM A182 F304L BW-ANSI B16-25 WN.237 BORE SCH.40S 1/2 8 ## FLANGE LAP 150# RF ANSI B16-5 ASTM A105 ## FLANGE BLIND 150# RF ANSI B16-5 ASTM A182 F304L GASKETS ## GASKET 150# RF 3 MM KLINGER-SIL C4400 ## GASKET 150# RF 3 MM KLINGER-SIL C4400 BOLTS&NUTS ## 60MM BOLT FULL THD ANSI B16-5 ASTM A193-B7/ ASTM A194-2H HEX NUTS 237 ## 95MM BOLT FULL THD ANSI B16-5 ASTM A193-B7/ ASTM A194-2H HEX NUTS 237 ## 150MM BOLT FULL THD ANSI B16-5 ASTM A193-B7/ ASTM A194-2H HEX NUTS 237 VALVES ## VALVE DIAPHRAGM 150# RF ANSI B16-5 ASTM A182 F304 150D2 DIAPHRAGM 237 B 1/2 7 1/2 5/8 5/8 62 62 31 237 237 1/2 4 15 31 237 237 4 1/2 31 8

EA EA EA

EA EA

SET SET SET

EA EA

## VALVE BUTTERFLY 150# RF WAFER ANSI B16-5 ASTM A351 CF8M / PTFE 237 DISC : AISI 4 316L LO 7 PIPIE SUPPORT

ITB REFERENCE NUMBER 4251-VCM-ITB-T322-001 SEND VCM EMISSION TO INCINERATOR PROJECT

PRICE SCHEDULE FOR CIVIL, STEEL STRUCTUAL, PIPING AND MECHANICAL INSTALLATION WORKS

PIPING MATERIALS

Pipe Item Material Description

Size

Q'ty

Materail

Unit (Class) (Inch)


Final

Rev.
Unit Cost. Total Cost

Remark

## PIPES PIPE 4" SCH.40 ANSI B36-10 ASTM A106B BE-ANSI B16-25 SEAMLESS PIPE 8" SCH.40 ANSI B36-10 ASTM A106B BE-ANSI B16-25 SEAMLESS PIPE 8" SCH.40 ANSI B36-10 ASTM A53B BE-ANSI B16-25 WELDED PIPE 10" SCH.40 ANSI B36-10 ASTM A53B BE-ANSI B16-25 WELDED PIPE 12" STD.WT. ANSI B36-10 ASTM A53B BE-ANSI B16-25 WELDED ## STEEL SHAPES L40x40x5 L50x50x6 L65x65x6 L75x75x9 L100x100x10 C125x65x6 C150x75x6.5 H100x100x6x8 H150x150x7x10 H200x200x8x12 ## STEEL PLATES PLATE 230x230x9t PLATE 260x260x9t PLATE 320x290x12t PLATE 320x300x12t PLATE 330x330x16t PLATE 380x380x16t PLATE 490x490x16t PLATE 560x560x16t ## EXPANSION BOLTS EXPANSION BOLT 5/8"x127L 5/8"x127L 12 SET 1 3 8 16 3 2 3 1 EA EA EA EA EA EA EA EA 1 3.3 20 17 1 9 9 16 40 4 M M M M M M M M M M 4" 8" 8" 10" 12" 1.5 1 2 1.5 1.5 M M M M M

ITB REFERENCE NUMBER 4251-VCM-ITB-T322-001 SEND VCM EMISSION TO INCINERATOR PROJECT

PRICE SCHEDULE FOR CIVIL, STEEL STRUCTUAL, PIPING AND MECHANICAL INSTALLATION WORKS

PIPING MATERIALS

Pipe Item Material Description

Size

Q'ty

Materail

Unit (Class) (Inch)


Final

Rev.
Unit Cost. Total Cost

Remark

EXPANSION BOLT 3/4"x152L EXPANSION BOLT 7/8"x178L ## U-BOLTS U-BOLT FOR CS PIPE 1" U-BOLT FOR CS PIPE 2" U-BOLT FOR CS PIPE 3" U-BOLT FOR CS PIPE 6" U-BOLT FOR CS PIPE 16" ## PTFE SHEET 1200x1200 x3t Total Piping Material

3/4"x152L 7/8"x178L

12 4

SET SET

1" 2" 3" 6" 16"

9 8 1 2 1 6

SET SET SET SET SET EA

NOTES; 1. UNIT OF PIPES AND STEEL SHAPES USED IN THIS MTO IS "METRE". VENDOR SHALL CONVERT THE UNIT TO SUIT THE STANDARD LENGTH (NORMALLY 6 METRES ). 2. MATERIAL SPECIFICATION FOR STEEL PLATE IS ASTM A283 GR.C HOT ROLLED OR JIS B3101 SS400. 3. MATERIAL SPECIFICATION FOR STEEL SHAPE IS ASTM A36 OR EQ. 4. MATERIAL SPECIFICATION FOR EXPANSION BOLT IS ASTM A325. 5. MATERIAL SPECIFICATION FOR U-BOLT IS ASTM A307 GR.B/A563 GR.A.