SEA-TO-SKY HIGHWAY IMPROVEMENT PROJECT

SUBGRADE EMBANKMENTS
LOCATION: STATION: DWG # / Rev #: Latest IFC, RFI, FDC checked? Indicate.
Foreman CHECK

Check for Changes (Yes / No):

DESCRIPTION Pre-work MoT SS 200, 201 reviewed Layout checked (survey crew) Area cleared and grubbed Installation Embankment foundation inspected/approved by Geotech Engineer Fill material free of organics & gradation meets specification Fills keyed into slopes & mat'l is placed such that voids are filled Water of backfill as required Compaction achieved 95% std Proctor (top 300mm 100% std Proctor) (earth embankments only) QA tested. Proof rolling required/carried out Rock fills compacted, 4 passes with roller minimum Lift thickness monitored and controlled (to max rock size and not exceeding 700mm) Finished line and grade checked (+/- 15mm) (survey crew)

Engineer COMPLIANCE CHECK (Y/N)

DATE

ADDITIONAL ITEMS: # of lifts placed per day:

Superintendent:

Signature:

Date:

NOTES, COMMENTS, NCRS:

QC_DBFO_014

Rev. 01

Nov. 2005