SEA-TO-SKY HIGHWAY IMPROVEMENT PROJECT

MISCELLANEOUS STEELWORK
LOCATION: SEGMENT #: DWG # / Rev #: Latest IFC, RFI, FDC checked? Indicate.
Foreman Engineer Check Check Compliance (Y/N)

SECTION #: Check for Changes (Yes / No):

DESCRIPTION Pre-work and Materials MoT SS 422 and Design Drawing reviewed Shop drawings, mill certificates submitted/approved Incoming materials inspection, attach inspection Installation Survey layout and control of installation locations (survey crew) Installation carried out to design Field painting, if required Quality Control Field inspection of installed work Manufacturer proof of coating system Check for coating damage Field touch-up required SS 422.39.01

Date

ADDITIONAL ITEMS:

Superintendent Signoff:

Signature:

Date:

NOTES, COMMENTS, NCRS:

QC_DBFO_016

Rev. 0

July 2005