Eyebrow framing at the HQ is complete with sheathing of the eyebrow at 85% complete. Stone is being installed on the northwest side of the HQ. Metal panels are completely installed at the penthouse. VC low roof installation is complete. MEP above ceiling rough-in is ongoing at the VC.
Eyebrow framing at the HQ is complete with sheathing of the eyebrow at 85% complete. Stone is being installed on the northwest side of the HQ. Metal panels are completely installed at the penthouse. VC low roof installation is complete. MEP above ceiling rough-in is ongoing at the VC.
Eyebrow framing at the HQ is complete with sheathing of the eyebrow at 85% complete. Stone is being installed on the northwest side of the HQ. Metal panels are completely installed at the penthouse. VC low roof installation is complete. MEP above ceiling rough-in is ongoing at the VC.
North View of HQ Southwest View of HQ Framing Full Height Partition at VC
First Floor Restroom Rough-In’s Metal Wall Panel at Penthouse Exterior Brick Veneer
• Window frame installation is ongoing along the HQ north side.
• Damproofing the northwest side of the HQ is complete. • Stone is being installed on the west side of the HQ. • Glass is being hung on the north side 1st and 2nd floors of the HQ. • Metal panels are completely installed at the penthouse. • VC low roof installation is complete. • MEP above ceiling rough-in is ongoing at the VC. • Brick installation on the southeast side of the HQ is complete with the southwest side starting. • Eyebrow framing at the HQ is complete with sheathing of the eyebrow at 85% complete. • Starting the installation of metals panels on the exterior of the HQ.