TCM ECR CONCRETE AUDIT REPORT

 Tie rod to be removed from East side TCM ECR wall


 Improper finishing & shuttering Board not Removed in TCM ECR East side wall.

 Water leakage from tie rod holes from south side wall.

 Grinding of concrete surface pending.


 Concrete Not Removed from conduit pipe.

TCM Equipment Concrete work report


 Tie rod removing not done in west side of TCM.

 Rebar not cover in concrete Near column B-7.

 Tie rod not removed in TCM part-3 Stair case area.


 Red oxide paint to be provided over insert plate that partly applied.

 Honey comb repairing and tie rod cutting pending in TCM inside.
 Hessian cloth to be Removed in Top slab.

 All extra rebar cutting in TCM inside.


 Grinding of concrete surface pending.

 Insert plate mismatch at TCM part-1 inside wall.


 Shuttering board to be Removed in TCM part-1 North side(inside).

 Ply board to be Removed in opening area.


 Bulging area to be Rectify in TCM part-2 inside opening area.