DPSI-GE-13 Rev 1

DOOSAN POWER SYSTEMS INDIA PVT.LTD

ANCHOR BOLT INSTALLATION PROTOCOL (PRE CAST/POST CAST)

JAWAHARPUR 2X660 MV SUPER THERMAL POWER STATION PROJECT

CLEINT: JAWAHARPUR VIDYUT UTPADAN NIGAM LIMITED


CONSULTANTS : DESEIN PRIVATE LIMITED
ELEVATION/LEVEL & COORDINATES FOR ANCHOR BOLT
Report No.: Date:
Inspection Item No.:
Location: Instrument Details:
Drawing No.: Revision No.: FQP No:

As Per Site Difference


As per drawing Co-ordinate
Co-ordinate (If any) In mm
Anchor Bolt No. Remarks
X Y Z X Y Z X Y Z

Note: X,Y represents the co-ordinate & Z represents elevation.

Remarks:

DPSI DPSI
DPSI CIVIL MECH. SUBCON DPSI DPSI MECH.
MECH. SUBCON QC CIVIL MECH DESEIN JVUNL
EXE. EXE. SURVEYOR EXE.
QC QC
DOOSAN POWER SYSTEMS INDIA PVT.LTD Format No. :DPSI/SR/ 17/047
SURVEY REPORT Rev. :01
PROJECT :2X660 MW JAWAHARPUR SUPER THERMAL POWER STATION Date of Rev : 06-07-18
CLIENT: JAWAHARPUR VIDYUT UTPADAN NIGAM LIMITED Page No. : 1 of 1
SURVEY REPORT - ELEVATION & COORDINATES (PRE-POUR/POST-POUR)
Report No.:…………………………………….. Date:………………………………
Refe.Pour Card No.:……………………………. Instruments No.:………………….
Location:……………………………………….. Item name:
Drawing No.:…………………………………… Revision No.:……………………..
Item Co-ordinate Item Elevation
Sl. As per
Description As per Drawing As Per Site As Per Remarks
No. Difference Drawing Difference
N E N E Site

Note:
*Instrument
DPSI station co-ordinate>
MECH. Location: DPSI N:
DPSI DPSI E:
MECH. SUBCON DPSI
CIVIL SUBCON MECH. CIVIL MECH DESEIN JVUNL
QC SURVEYOR
EXE. EXE. EXE. QC QC