You are on page 1of 1

Texas A&M University

Administrative Services Building


W e e k l y R e p o r t : 8 / 2 2 / 11 - 8 / 2 6 / 11

West View

1st Floor Office Door and Glass

1st Floor Break Room Casework

1st Floor West Corridor

3rd Floor West Corridor

5th Floor West Corridor

Doors and hardware are installed on the 1st floor Brick has been washed down at the buck hoist area and scaffold has been removed Interior aluminum frames on the 4th floor are 70% installed Casework is installed in the 1st floor break room Metal panels are being installed at the buck hoist area Interior wall sconces are installed on the 1st floor Grid is currently being installed on the 5th floor Interior transom and sidelight glass is being installed on the 1st floor Metal panels have been installed on the north curtain wall Brick will start to be installed on the retaining wall next week

You might also like