INTRODUCTION

The Power Transformer Subcommittee of the Institute of Electrical and Electronics Engineers,
(IEEE), representing both manufactures and users, has established and documented standard
transformer test procedures. These test procedures are described in the American National
Standards Institute, (ANSI) Standard ANSI C57.12.90 for liquid filled transformers and
C57.12.91 for dry type transformers. General requirements are documented in ANSI C57.12.00
and C57.12.01 respectively. Additional information is documented in the National Electrical
Manufacturers' Association (NEMA) Standards Publication No. TR-1.

Following completion of the test program, Sunbelt Transformer provides a written report
detailing the results of the tests. These test reports provide a baseline for the new transformer and
should be retained as a reference for future routine maintenance tests, such as TTR and Doble
insulation tests. Sunbelt Transformer ensures that measuring equipment is calibrated regularly to
national traceable standard instruments.

For further information on transformer testing, Sunbelt Transformer's sales or design engineers
can be contacted or reference can be made to the National Standards noted.

RATIO, POLARTITY AND PHASE RELATION TESTS

The purpose of a transformer is to convert power from one system voltage to another. This
voltage relationship, or voltage ratio, is determined by the number of turns on the high voltage
coil and the number of turns on the low voltage coil of the transformer. The ANSI specification
states that the measured ratios must have a maximum variation of plus or minus 0.5% compared
to specified ratios.

The ratio is measured by using a transformer turns ratiometer (commonly called a TTR) which
applies a low voltage to the transformer under test. A comparison is made between the
transformer under test and an adjustable variable ratio transformer in the ratiometer, when the
two ratios' are equal; a balance is obtained on the detector. A high exciting current during the
ratio test may indicate a shorted turn.

For three phase transformers, the polarity and the phase relationship between the high voltage
and the low voltage should to verify to the design requirements. These characteristics are
described in diagram 1 and are particularly important when two or more transformers are
paralleled. The phase relationship is the angular phasor (vector) displacement between, say, H1
and X1 and is typically 30 degrees leading.

RESISTANCE MEASUREMENT

The measurement of the dc resistance of the transformer windings and comparison to the design
calculations verifies that the correct conductor size has been used, brazed, crimped or bolted
connections are satisfactory and that the contact resistance of any tapswitches or tapchanger is
within acceptable limits.

The measurements must be made at a known temperature, at least 24 hours after oil filling, and
corrected to the standard reference temperature. An accurate measurement is necessary since it is
used to correct the load losses to the reference temperatures as discussed under Load Losses and
to calculate the winding temperatures after a temperature rise test.

NO-LOAD LOSS AND EXCITING CURRENT TESTS

The load losses and the exciting current are measured by using connections as shown in diagram
2, rated voltage is applied to either the high voltage or low voltage side while the other side
remains open circuit.

By applying an alternating voltage to the one side, a magnetic flux is established in the core,
which induces or causes a voltage to appear across the terminals of the other side. The exciting
current and no load loss or core loss is the energy required to establish (or excite) the magnetic
flux in the core. To obtain accurate values of no load losses, the wave shape of the applied
voltage must be a close as possible to a sine wave. A correction for the waveshape variation is
made to the measured results.

These tests are performed to ensure that the electrical performance of the core is comparable to
the calculated values. They verify that the core has been designed and built correctly, that the
quality of the core materials is satisfactory and the core is operating in the correct range of flux
density. Transformers are designed to operate near or below the knee of the magnetic
performance curve for the core steel material as illustrated in diagram 3. This practice avoids the
core operating into the saturation point of the magnetic performance curve which would cause
the no load loss and magnetizing currents to increase sharply. It also enables the transformer to
operate in accordance certain over voltage conditions as specified in the ANSI Standards without
exceeding its rated temperature rating.
Occasionally a user or specifier will request that the no load loss and magnetizing currents are
measured at 90%, 100% and 110% rated voltage. These tests verify that the core will not operate
into saturation during the ANSI specified over voltage conditions.

LOAD LOSS AND IMPEDANCE TEST

During the load loss and impedance test, a voltage is applied to the high voltage side of the
transformer while the bushings of the low voltage side are shorted together as shown in diagram
4. An applied voltage is increased until the current supplied matches the rated current. Losses
supplied to the transformer under these conditions are equivalent to the load losses that are
incurred during full load operation.

Load losses are the sum of the resistive losses in the windings plus stray losses in the tank, core
clamps and other metal parts and eddy losses due to circulating currents in the winding
conductors. The resistive part of the load losses is sensitive to temperature since the winding
resistance increases with increasing temperature. On the test report, the losses are corrected to
either 75 degrees C for 55-degree rise units or 85 degrees for 65-degree rise units, which are the
specified reference temperatures.

The applied voltage required to supply the rated current during this test is used in the calculation
of impedance voltage. Impedance is expressed as the percentage ratio of applied voltage to rated
voltage. ANSI Standards allow impedance tolerances for two winding transformers of plus or
minus 71/2% and for transformers having three or more winding, auto-transformers or grounding
transformers the tolerance is plus or minus 10%.

The impedance of a transformer determines the amount of fault current flowing in the windings
should a short circuit occur during the operation of the transformer. The magnitude of short
circuit currents flowing through the transformer, assuming no system impedance and an infinite
supply, would be the rated current times the reciprocal of the per unit impedance. An impedance
percentage of 5% or 0.05p.u. will cause a potential short circuit current of 20 times the rated
current. The lower the impedance the higher the potential short circuit current.

The mechanical forces acting within the transformer are directly related to the square of the
magnitude of current flowing through the windings. The designer calculates the design's
capability to withstand these mechanical forces and, if necessary, makes adjustments to ensure
the transformer meets the ANSI criteria. Sunbelt Transformer designers uses a combination of
several methods based on many years of industrial test and field experience, including
"Westinghouse" calculations and Andersen programs, to confirm compliance.
The measured impedance also determines suitability for paralleling with existing transformers of
known impedance. A transformer whose tested impedance is higher than the other will cause the
other transformer to carry more than its equal share of the load.

DIELECTRIC TESTS

Dielectric tests are the group of tests during which the transformer will be subjected to higher
voltage levels and therefore higher voltage stresses than would normally be experienced in
service. The purpose is to confirm that the design, manufacture and processing of the transformer
and insulation structure and materials are adequate to provide many years of satisfactory life.

APPLIED POTENTIAL TEST

The applied voltage test (commonly called Hipot test) verifies that the major insulation structures
and the clearance between leads and ground are satisfactory. The major insulation is the
insulation between the winding under test and the other windings, to the core, to core clamps and
tank. The test level for each system voltage is specified in ANSI and is applied at power
frequency for one minute.

During this test, each winding is shorted out by connecting its bushing as shown in sketch 5, the
specified voltage is then applied to the winding under test with the other windings connected to
ground. No voltage is induced in the winding under test or magnetic flux induced in the core;
hence the insulation between turns or between layers in the winding under test is not stressed.

INDUCED VOLTAGE TEST

The induced voltage test, diagram 6, induces a voltage in the transformer and causes the voltage
stress between turns and between layers of each winding to be raised to higher than normal
service voltage. The applied voltage is typically at 120 or 180 hertz in order not to saturate the
core that would occur if it were at power frequency. To allow for variation in test frequencies,
the test duration is 7200 cycles.

SOUND LEVEL TEST

The sound level is measured by supplying one side of the transformer at rated voltage with the
other side open circuit, diagram 2. The sound level is measured at a specified height and
positions around the transformer and the results averaged. It is necessary to provide a low level
of background sound and avoid reflective surfaces to achieve accurate results.
For particular applications, users may specify lower levels than those in ANSI standards. Since
the core is the source of sound, the noise can be reduced by lowering the flux density and by
mounting the core on vibration pads in the tank. However, by reducing the sound level in this
way, the initial cost of the transformer will be increased while the no load losses will be reduced.

For forced cooled transformers, the fans are a source of sound, low speed fans or fans with
special blades can be used to reduce sound levels.

TEMPERATURE RISE TESTS

The temperature rise test is a way of verifying the cooling of the transformer and is performed by
using the connections show in Sketch 4. The temperature rise test is performed in two stages,
first by the supply of total losses, the oil rise temperatures are established. The end point is
reached when the rate of top oil temperature rise is essentially flat. The supplied power (current)
is then reduced to provide the load losses which would occur in the highest loss tap position and
the test continued for one hour. At this point, the power is isolated, the shorting connection is
removed and the winding resistances measured during the next 10 - 15 minutes. A curve of the
reducing resistance against time is plotted, called a cooling curve, and is extrapolated back to
time zero to provide the winding resistance at the instant of shutdown. Calculations are made to
give the temperature of the windings during the time they were carrying rated load losses. Under
certain conditions, the standards allow for one reading of winding resistance to be taken and a
correction made.

The temperature rise tests can typically take around 10 to 20 hours and are considered an
optional test. Typically a user will accept the results of a similar unit instead of performing a test.

The life expectancy and rate of aging of paper and pressboard insulation used to insulate the
windings depends on its service temperature, time at that temperature and the condition of the
surrounding oil. In order to achieve normal life expectancy of the insulation materials and hence
the transformer, the ANSI and NEMA specify temperatures that the transformer must not exceed
when delivering its rated output.

The ANSI standards provide information on the loss of life of the insulation should it be operated
above the specified temperatures. For every 8 degrees C above the specified insulation
temperature limits, the rate of losses of life is doubled. For users that require to overload their
transformers from time to time, this guide provided useful operating information.

CORONA (PARTIAL DISCHARGE)


Corona or partial discharge is measured during the induced test using special equipment coupled
to the transformer bushings. The level of discharge, measured in microvolts or picocoulombs, is
continuously monitored and recorded every 5 minutes. Transformer, rated 115KV and above,
require this one hour test during which all parts of the insulation is overstressed to 150% of
normal levels. The ANSI specifications mentioned above describe these tests and specify
acceptable levels for various system voltage levels. Sunbelt Transformer is equipped to measure
both microvolts and picocoulombs simultaneously.

During the operation of a transformer, electrical discharges may be generated which cause loss
of life of the insulation materials and interference of electrical communications in the area
around the location of the transformer. These discharges can be caused by several factors for
example a) inadequate processing/vacuum filling that leaves air voids in the insulation or oil, b)
concentrations of high electrical stress at sharp points/edges on conductors or c) local points of
overstressed insulation. Experienced manufacturers have developed various techniques to
minimize the likelihood of corona and pay particular attention during manufacture and oil filling
processes.

INSULATION-RESISTANCE TEST

For two winding transformers, the bushings of each winding are shorted together and the tank
and the core grounded. Measurements are taken between the high side to low side grounded and
then between the low side to high side grounded. The core is also measured to ground if
available via an external bushing or an accessible internal connection.

The dryness, cleanliness and the temperature of the transformer will effect the value of insulation
resistance. By measuring the insulation resistance, correcting to 20 degrees C, and comparing to
available published data, the quality and the reliability of the transformer can be estimated.
During manufacture this test is performed a number of times not only to determine dryness but
also to identify unintentional shorts or ground circuits, particularly between the core steel and the
core clamping structure. During routine preventative maintenance, these measurements can be
taken and compared to the original values to determine the condition of the insulation.

INSULATION POWER FACTOR

The insulation power factor test is another test that can be performed to determine the condition
of the transformer insulation. The measurement is made with a capacitance bridge, measuring the
capacitance between windings and between windings and ground, together with the power factor
or loss angle of this capacitance. The dissipation factor is a similar test that provides useful
information as to the dryness and condition of the insulation. Typically, at 20 degrees C, the
power factor of a new transformer should be below 0.5% and values of half this value can be
achieved in a new transformer.

Again, the values obtained during the factory tests on a new transformer can be compared to
those taken during routine maintenance tests and some indication of the deterioration of the
insulation structure can be determined.

OIL TESTS

Several tests can be performed on transformer oil to determine its condition and many are
particularly useful in determining the condition oil that has been in service for a number of years.
The most common test performed on oil is the dielectric test to either ASTM D877 or ASTM
D1816. These specifications define the method of preparing a sample, the equipment to be used
and the test method.

During factory tests it is useful to take oil samples before testing and again after testing in order
to perform a dissolved gas in oil analysis. This is particularly useful for high voltage
transformers and in cases when a temperature rise test be performed.

Oil tests are a useful indicator of the condition of the insulation system and the oil and form
Important elements of any transformer preventative maintenance program. Results taken after
periods of service can be compared to baseline measurements taken on the new transformer.

REGULATION AND EFFICENCY

As a transformer supplies an increasing load, the actual voltage at the secondary terminals
reduces and falls below the specified or designed voltage. This voltage drop or reduction is
called the regulation of the transformer and is related to the impedance of the transformer, lower
values of impedance will provide a reduction in regulation for a given load. The regulation is the
ratio of output voltage at a specified load, compared to the output voltage at no load. Calculation
of the regulation at various loads and power factors requires calculation of the two components
of the impedance, i.e. the reactance and resistance established from results of earlier tests.
Regulation increases as the power factor reduces or deteriorates.

Since utilities are required to maintain the system voltage within a certain range, regulation is an
important operational consideration and it can be compensated for by the use of voltage taps in
one or both of the winding. Typical no-load tapchanger adjustment are +5% above rated voltage
to -5% below rated voltage in 2 � % steps which is achieved by adding or removing active
turns in the winding. For certain applications, transformers are provided with On-Load
tapchanger having an increased range of adjustment with the ability of making tap changes
without disconnecting the load. For transformers having only no-load taps, excessive regulation
can be compensated for by the installation of separate step voltage regulators.

The efficiency of a transformer is usually well over 90%. It is calculated by the ratio of the
output divided by the input. Expressed as a per unit value, the calculation would be 1 - total
losses divided by the input. The total losses are those that would occur at the rated input
considered. Charts are available to facilitate the determination of the efficiency at various loads.

SUMMARY

This article gives basic details and discussion of transformer tests. Further information can be
obtained by contacting Sunbelt Transformer's sales or engineering department or by referring to
the ANSI standards C57 published by the IEEE. Reference and acknowledgement is made to the
American National Standards Institute and to National Electrical Manufacturers Association.

You might also like