You are on page 1of 28

FARAMAX

FARAMAX TRAFO: Manufacturing capabilities


September 2018 1
FARAMAX
INDEX TRAFO

• GENERAL DATA

• WINDING WORKSHOP

• CORE-CUTTING WORKSHOP

• TANK MANUFACTURING WORKSHOP

• ASSEMBLY WORKSHOP

• VAPOR PHASE

• TEST LABORATORY

• REFERENCES

• CERTIFIED QUALITY SYSTEM

May 2020 Production facilities 2


FARAMAX
FARAMAX Group TRAFO

• FARAMAX Group:

FARAMAX
International GmbH
(Switzerland)

SKRM FARAMAX Trafo S.L.


(Russia) (Spain)

• FARAMAX develops, manufactures and supplies power transformers and


autotransformers, Magnetically Controlled Shunt Reactors and based on them
Controlled Shunt Reactor Systems for electric grids and electric power systems
of high and extra-high voltage

May 2020 FARAMAX 3


FARAMAX
GENERAL DATA TRAFO

The original transformer plant Electrotecnica Extremeña S.A. (ETESA) was built in 2010 to produce
transformers and autotransformers up to 200 MVA 220 kV. In 2017 the plant entered into Faramax Group,
in 2018 manufacturing facilitiies upgrades to 500 kV were completed.

Overall data
- Total territory: 20,000 m2
- Production space: 10,000 m2

Product range
- Transformers and autotransformers up to 300+ MVA 220 kV (500 kV)
- Magnetically Controlled Shunt Reactors up to 200 MVAr 220 kV (500 kV)
- Fixed shunt reactors up to 150 MVAr (500 kV)

May 2020 Faramax Trafo production facilities 4


FARAMAX
WINDING WORKSHOP TRAFO

Total area: 1678 m2

2 horizontal and 3 vertical


winding machines

Max winding diameter: 2300 mm

Max winding weight: 12 tn

Crane: 12.5 tn

Automatic drying oven with


Isostatic pressing: HEDRICH

May 2020 Production facilities 5


FARAMAX
WINDING WORKSHOP TRAFO

3 vertical winding machines


Stollberg VWM 10T 1200

2 horizontal winding machines


Stollberg DIC-H-20/4

May 2020 Production facilities 6


FARAMAX
CORE CUTTING WORKSHOP TRAFO

Core cutting machine: GEORG

Maximum lamination width: 900 mm

Crane capacity: 10 tn

May 2020 Production facilities 7


FARAMAX
TANK MANUFACTURING WORKSHOP TRAFO

Total area: 2200 m2

Sand-blasting booth: 10 m

Painting booth: 10 m

Crane: 20 tn

May 2020 Production facilities 8


FARAMAX
TANK MANUFACTURING WORKSHOP TRAFO

Blasting booth Painting booth

May 2020 Production facilities 9


FARAMAX
ASSEMBLY WORKSHOP TRAFO

Dimensions: 108 x 25 m

Total area: 2875 m2

Core assembly tables:


- 5 m 3-leg 40 tn
- 12 m 8-leg 100 tn

Assembly stands: Stollberg

May 2020 Production facilities 10


FARAMAX
ASSEMBLY WORKSHOP TRAFO

Cranes:
- 63 tn + 16 tn
- 126 tn + 20 tn
- 160 tn + 25 tn

May 2020 Production facilities 11


FARAMAX
ASSEMBLY WORKSHOP TRAFO

3-leg core assembly table:

- 5 m long
- Max core weight 40 tn

Producer: EYHER

May 2020 Production facilities 12


FARAMAX
ASSEMBLY WORKSHOP TRAFO

8-leg core assembly table:

- 11 m long
- max core weight 100 tn

Producer: HI-KON (Croatia)

Unique technology, suitable


for production of cores for
Magnetically Controlled
Shunt Reactors (MCSR)

May 2020 Production facilities 13


FARAMAX
ASSEMBLY WORKSHOP TRAFO

Assembly platforms:

- 8 m long

Producer: Stollberg

May 2020 Production facilities 14


FARAMAX
ASSEMBLY WORKSHOP TRAFO

Active part of MCSR

May 2020 Production facilities 15


FARAMAX
ASSEMBLY WORKSHOP TRAFO

May 2020 Production facilities 16


FARAMAX
ASSEMBLY WORKSHOP TRAFO

Air cushion mover:

- 200 tn

Producer: Solving

May 2020 Production facilities 17


FARAMAX
ASSEMBLY WORKSHOP TRAFO

Ready for shipment

May 2020 Production facilities 18


FARAMAX
VAPOR PHASE TRAFO

Vapour-Phase Autoclave: HEDRICH

Dimensions (L x W x H): 11.6 x 4 x 5 m

May 2020 Production facilities 19


FARAMAX
VAPOR PHASE TRAFO

May 2020 Production facilities 20


FARAMAX
TEST LABORATORY TRAFO

Test laboratory: HAEFELY

Dimensions: 30 x 25 m

Ceiling height: 16.9 m

Faraday cage

50 / 60 Hz testing capability

Fully integrated test software


for automatic tests

May 2020 Production facilities 21


FARAMAX
TEST LABORATORY TRAFO

Impulse generator:

- 1800 kV
- 90 kJ

Capacitor banks:

- 64 MVAr

Frequency converter:

- 2 MVA
- 25..200 Hz

May 2020 Production facilities 22


FARAMAX
TEST LABORATORY TRAFO

May 2020 Production facilities 23


FARAMAX
FARAMAX INTERNATIONAL REFERENCES TRAFO

Year Customer Project Country Type Voltage Parameters

In progress FGC UES / Tumenenergo SS Vostochnij Russia Set of equipment for reconstruction of SS Vostochnij
2020 NGMK SS Bessopan Uzbekistan 2 x SCSR 220 kV -100..+100 Mvar
2019 FGC UES / Tumenenergo SS Tavricheskaya Russia Set of equipment for reconstruction of SS Tavricheskaya
2018 KEGOC SS Taldykorgan Kazakhstan MCSR 500 kV 180 Mvar
2018 KEGOC SS Aktogai Kazakhstan MCSR 500 kV 180 Mvar
2018 KEGOC SS Alma Kazakhstan MCSR 500 kV 180 Mvar
2017 LUKOIL Uzbekistan / HEC SS Kandym Uzbekistan 2 x SCSR 35 kV -16..+16 Mvar
2017 KEGOC SS Semey Kazakhstan MCSR 500 kV 3 x 60 Mvar
2017 MINEA SS Soyo Angola 2 x SCSR 400 kV -100..+10 Mvar
2016 MINEA SS Nzeto Angola 2 x SCSR 400 kV -100..+10 Mvar
2016 MINEA SS Kapari Angola SCSR 400 kV -100..+10 Mvar
2015 FGC UES / Tumenenergo SS Salekhard Russia SCSR 220 kV -100..+200 Mvar
2015 Gold Mining Co. Pavlik SS Pavlik Russia SCSR 110 kV -25..+50 Mvar
2014 Temir Zholy SS Koskol Kazakhstan SCSR 110 kV -25..+2.5 Mvar
2014 KEGOC / HEC SS Shymkent Kazakhstan SCSR 220 kV -100..+30 Mvar
2014 MRSK SS Ust-Kulom Russia SCSR 10 kV -10..+10 Mvar
2014 ENE SS Kuito Angola SCRS 220 kV -25..+2.5 Mvar
2014 FGC UES SS Kyzylskaya Russia SCSR 110 kV -25..+52 Mvar
2013 ENE SS Uige Angola SCSR 220 kV -60..+6 Mvar
2013 ENE SS Viana Angola SCSR 400 kV -100..+10 Mvar
2013 ENE SS Capanda Angola SCSR 400 kV -100..+10 Mvar
2012 Salym Petroleum SS Zapadno-Salymskaya Russia 2 x SCSR 35 kV -25..+25 Mvar
2011 MRSK Center SS Pokrov Russia SCSR 110 kV -25..+25 Mvar

May 2020 Production facilities 24


FARAMAX
ETESA-FARAMAX TRAFO REFERENCES TRAFO

POWER TRANSFORMERS/MCSR-SCSR
UN REF POW (MVA) HV(kV) GROUP CLIENT LOCATION COUNTRY TYPE FAT DATE YEAR
1 1 P0834-93 50 220 YNd11 IBERDROLA SPAIN DISTRIBUTION 07.05.2009 2009
2 1 P0834-94 50 220 YNd11 IBERDROLA SPAIN DISTRIBUTION 17.07.2009 2009

3 1 P0872-75 80 132 YNyn0d11 IBERDROLA SPAIN DISTRIBUTION 28.05.2010 2010


4 1 P0872-74 80 132 YNyn0d11 IBERDROLA SPAIN DISTRIBUTION 10.06.2010 2010
5 1 P0938-94 20 132 YNd11 IBERDROLA INGENIERÍA Y CONSULTORÍA SPAIN WIND POWER 03.08.2010 2010
6 1 P0938-93 20MVA 132 YNd11 IBERDROLA INGENIERÍA Y CONSULTORÍA SPAIN WIND POWER 06.08.2010 2010
7 1 P0943-14 25/30 MVA 66 YNd11 ENDESA GENERACION PTA JEREZ SPAIN DISTRIBUTION 22.09.2010 2010
8 1 P0920-72 65 MVA 227 YNd11 UTE MANCHASOL 2 CIUDAD REAL SPAIN THERMOSOLAR 22.10.2010 2010
9 1 P0944-11 32/40 MVA 136 YNyn0d11 E-ON SPAIN DISTRIBUTION 03.11.2010 2010
10 1 P0944-10 32/40 MVA 136 YNyn0d11 E-ON ST PORZUN SPAIN DISTRIBUTION 05.11.2010 2010
11 1 P0944-12 32/40 MVA 136 YNyn0d11 E-ON ST ALMUÑA SPAIN DISTRIBUTION 01.12.2010 2010
12 1 P0885-73 50 220 YNd11 IBERDROLA SPAIN DISTRIBUTION 29.12.2010 2010
13 1 P0921-33 40 110 YNd11 RENOVATIO POWER SRL (EDP) POLONIA SPAIN WIND POWER 05.05.2011 2011
14 1 P0966-50 19 138 YNd11 ENDESA GENERACIÓN SPAIN DISTRIBUTION 28.07.2011 2011
15 1 P0933-73 125 MVA 220 YNyn0d11 REE SANTA PONSA (MALLORCA) SPAIN DISTRIBUTION 04.08.2011 2011
16 1 P0973-95 22 MVA 45 YNd11 ISMEL ENERCRISA SPAIN COGENERATION 09.08.2011 2011
17 1 P0933-72 125 MVA 220 YNyn0d11 REE SON ORLANDIS (MALLORCA) SPAIN DISTRIBUTION 11.08.2011 2011
18 1 P0972-57 40 MVA 250 YNd11 IBERDROLA GENERACIÓN, S.A. CH SANTIAGO SPAIN HYDRO POWER 16.09.2011 2011
19 1 P0976-05 63 MVA 132 YNd11 IBERDROLA DISTRIBUCIÓN ELÉCTRICA ALMARAZ SPAIN DISTRIBUTION 06.10.2011 2011
20 1 P0976-69 63 MVA 132 YNd11 IBERDROLA DISTRIBUCIÓN ELÉCTRICA CASTUERA SPAIN DISTRIBUTION 15.10.2011 2011
21 1 P0977-62 13 10,5 YNd11 ELECNOR ASTE 1A ALCAZAR DE SAN JUAN SPAIN SOLAR POWER 20.10.2011 2011
22 1 P0977-63 13 10,5 YNd11 ELECNOR ASTE 1B ALCAZAR DE SAN JUAN SPAIN SOLAR POWER 26.10.2011 2011
23 1 P0992-45 25/30 MVA 55 YNd11 EON SE MARINA DE CUDEYO SPAIN DISTRIBUTION 18.11.2011 2011
24 1 P0968-07 50 MVA 220 YNd11 ELECTRA CALDENSE ST CAN VINYALS SPAIN DISTRIBUTION 23.12.2011 2011
25 1 P0976-68 63 MVA 132 YNyn0d11 IBERDROLA DISTRIBUCIÓN ELÉCTRICA NAVATEJERA SPAIN DISTRIBUTION 24.01.2012 2012
26 1 P0978-64 65 MVA 132 YNd11 ACCIONA ENERGÍA ORELLANA SPAIN SOLAR POWER 23.02.2012 2012
27 1 P1003-93 44/55 MVA 45 YNd11 IBERDROLA RENOVABLES ST PEÑAFLOR SPAIN WIND POWER 10.03.2012 2012
28 1 P1002-92 44/55 MVA 45 YNd11 IBERDROLA RENOVABLES ST PEÑAFLOR SPAIN WIND POWER 13.03.2012 2012
29 1 P0968-08 50 MVA 220 YNd11 ELECTRA CALDENSE ST CAN VINYALS SPAIN DISTRIBUTION 12.04.2012 2012
30 1 P1004-55 58/72 MVA 138 YNd11 ENDESA IBIZA SPAIN DISTRIBUTION 06.06.2012 2012
31 1 I0154-02 30,5 12,5 REE SPAIN DISTRIBUTION 27.07.2012 2012
32 1 P1018-27 65 MVA 66 YNd11 ECOLAIRE ST ARENALES SPAIN SOLAR POWER 20.09.2012 2012
33 1 P1026-30 60 MVA 225 YNd11 UTE CT CASABLANCA CASABLANCA SPAIN SOLAR POWER 11.10.2012 2012
34 1 P1016-20 50 MVA 220 YNd11 IBERDROLA DISTRIBUCIÓN ELÉCTRICA ST CANTALAR SPAIN DISTRIBUTION 30.10.2012 2012
35 1 P1019-60 125 MVA 220 YNyn0d11 IBERDROLA DISTRIBUCIÓN ELÉCTRICA ST QUEL SPAIN DISTRIBUTION 26.11.2012 2012
36 1 P1017-17 50 MVA 220 YNd11 IBERDROLA DISTRIBUCIÓN ELÉCTRICA ST GANDÍA SPAIN DISTRIBUTION 13.12.2012 2012
37 1 P1040-38 50 MVA 230 YNd11 TSK ELECTRONICA Y ELECTRICIDAD ALBA RIVAS NICARAGUA WIND POWER 25.01.2013 2013
38 1 P1019-61 125 MVA 220 YNyn0d11 IBERDROLA DISTRIBUCIÓN ELÉCTRICA ST LOGROÑO SPAIN DISTRIBUTION 27.03.2013 2013
39 1 P1035-12 60 MVA 132 YNd1 SCOTTISH POWER PAISLEY SPAIN DISTRIBUTION 12.04.2013 2013
40 1 P1034-10 60 MVA 132 YNd1(YNd11) SCOTTISH POWER BAINSFORD SPAIN DISTRIBUTION 16.05.2013 2013

May 2020 Production facilities 25


FARAMAX
ETESA-FARAMAX TRAFO REFERENCES TRAFO

41 1 P1059-71 60/80 MVA 220 Yd11 TUBOS REUNIDOS TUBOS REUNIDOS SPAIN DISTRIBUTION 12.06.2013 2013
42 1 P1060-72 25 MVA 30 Dyn11 TUBOS REUNIDOS TUBOS REUNIDOS SPAIN DISTRIBUTION 23.07.2013 2013
43 1 P1057-67 32/40 136,5 YNyn0d11 EON MAZUELAS SPAIN DISTRIBUTION 17.09.2013 2013
44 1 P1070-80 22,5/30 MVA 150 YNd11 EDP RENOVABLES LATERZA AND CASTELLANETA ITALY WIND POWER 25.10.2013 2013
45 1 P1057-68 32/40 MVA 136,5 YNyn0d11 EON BAIÑA SPAIN DISTRIBUTION 26.10.2013 2013
46 1 P1071-89 15 63 YNd11 LUMIGANOR SPAIN INDUSTRIAL 14.12.2013 2013
47 1 P1064-23 25 MVA 132 YNd11 BASSOLS ENERGÍA BASSOLS SPAIN DISTRIBUTION 17.12.2013 2013
48 1 P1052-54 12/24 MVA CER 66 Yyn0 WPD NEWENT UK DISTRIBUTION 30.12.2013 2013

49 1 P1066-26 16/20 MVA 132 YNd11 IBERDROLA BENEJAMA SPAIN DISTRIBUTION 12.02.2014 2014
50 1 P1082-12 4 MVA 55 YNd11 EDP HC ENERGIA LA MALVA SPAIN HYDRO POWER 27.03.2014 2014
51 1 P1082-13 4 MVA 55 YNd11 EDP HC ENERGIA LA MALVA SPAIN HYDRO POWER 27.03.2014 2014
52 1 P1052-48 12/24 MVA CER 66 Yyn0 WPD BLOXHAM UK DISTRIBUTION 07.04.2014 2013
53 1 P1054-66 37,5/50 MVA 230 YNd11 EDP SOTONERA SPAIN WIND POWER 15.04.2014 2014
54 1 P1073-08 5 66 Dyn11 ELECNOR SPAIN DISTRIBUTION 27.05.2014 2014
55 1 P1081-08 16/20 MVA 132 YNd11 IBERDROLA ST VALL D'ALBA SPAIN DISTRIBUTION 10.06.2014 2014
56 1 P1058-69 6 MVA 55 YNyn0d11 ISASTUR CELIS SPAIN DISTRIBUTION 13.06.2014 2014
57 1 P1034-11 60 MVA 132 YNd1(YNd11) SCOTTISH POWER VARIAS ST SCOTLAND DISTRIBUTION 24.06.2014 2014
58 1 P1084-21 4,5 MVA 25,5 YNd11 ENDESA CH. BOADELLA SPAIN HYDROPOWER 25.06.2014 2014
59 1 P1075-98 30/40 MVA 132 YNd11 ECOSOLAR CANWORTHY UK PHOTOVOLTAIC 02.08.2014 2014
60 1 P1065-24 20/40 CER 66 YNyn0 WPD UPTON WARREN UK DISTRIBUTION 26.09.2014 2014
61 1 P1085-22 50/60 MVA 132 YNd1(YNd11) SPEN (2014-2015) SALTNEY UK DISTRIBUTION 17.10.2014 2015
62 1 P1076-99 25 MVA 45 YNyn0d11 GAS NATURAL FENOSA RESERVA SPAIN DISTRIBUTION 05.11.2014 2014
63 1 P1039-37 AUTO 75 MVA 230 YNa0d11 TSK ELECTRONICA Y ELECTRICIDAD ANILLO OCCIDENTE NICARAGUA DISTRIBUTION 10.12.2014 2014
64 1 P1091-75 10 MVA 58 Ia0 UTE EIFFAGE-CHM TRACCIÓN SPAIN RAILWAY 02.03.2015 2015
65 1 P1089-73 30 MVA 220 Ii0-Ii6 UTE EIFFAGE-CHM TRACCIÓN SPAIN RAILWAY 20.03.2015 2015
66 1 P1092-76 10 MVA 58 Ia0 UTE EIFFAGE-CHM TRACCIÓN SPAIN RAILWAY 15.04.2015 2015
67 1 P1078-02 50/60 MVA 132 YNd1(YNd11) SPEN (2014-2015) TIR GWYNT UK RAILWAY 30.04.2015 2015
68 1 P1096-80 10 MVA 58 Ia0 UTE GALICIA AUTO TRACCIÓN SPAIN RAILWAY 16.06.2015 2015
69 1 P1104-91 20 MVA 220 YNyn0 UTE SUBESTACIÓN PAJARES ST PAJARES SPAIN RAILWAY 14.07.2015 2015
70 1 P1077-00 50/60 MVA 132 YNd1 SPEN (2014-2015) JOHNSTONE UK DISTRIBUTION 23.09.2015 2014
71 1 P1093-77 10 MVA 58 Ia0 UTE EIFFAGE-CHM TRACCIÓN SPAIN RAILWAY 06.11.2015 2015
72 1 P1090-74 30 MVA 220 Ii0-Ii6 UTE EIFFAGE-CHM TRACCIÓN SPAIN RAILWAY 19.11.2015 2015
73 1 P1094-78 10 MVA 58 Ia0 UTE EIFFAGE-CHM TRACCIÓN SPAIN RAILWAY 20.11.2015 2015
74 1 P1097-81 10 MVA 58 Ia0 UTE GALICIA AUTO TRACCIÓN SPAIN RAILWAY 03.12.2015 2015
75 1 P1098-82 10 MVA 58 Ia0 UTE GALICIA AUTO TRACCIÓN SPAIN RAILWAY 04.12.2015 2015
76 1 P1095-79 10 MVA 58 Ia0 UTE EIFFAGE-CHM TRACCIÓN SPAIN RAILWAY 14.12.2015 2015
77 1 P1099-83 10 MVA 58 Ia0 UTE GALICIA AUTO TRACCIÓN SPAIN RAILWAY 15.12.2015 2015
78 1 P1100-84 10 MVA 58 Ia0 UTE GALICIA AUTO TRACCIÓN SPAIN RAILWAY 16.12.2015 2015
79 1 P0989-36 10,5 66 YNd11 ST NEVADA SEVILLA SPAIN DISTRIBUTION 09.06.2015 2016
79 8 01105-01112 1 MVA 10,5 YNd11d11 JSC KEGOK AKTOGUY-TALDYKORGAN KAZAKHSTAN MCSR 31.08.2017 2017
80 1 01113-43 100 MVAr 400 MINEA NZETO ANGOLA SCSR 23.03.2018 2018

May 2020 Production facilities 26


FARAMAX
ETESA-FARAMAX TRAFO REFERENCES TRAFO

81 2 01114-01115 100 MVAr 220 JSC OZELEKTROAPPARAT BESSOPAN UZBEKISTAN SCSR 19.11.2018 2018

81 1 01121-11 175 MVA 220 YNd11 COBRA INSTALACIONES Y SERVICIOS ALCÁZAR DE SAN JUAN SPAIN PHOTOVOLTAIC 26.03.2019 2019
83 2 01119-01120 80 MVA 115 YNd11d11 JSC OZELEKTROAPPARAT UZBEKISTAN UZBEKISTAN DISTRIBUTION 27.05.2019 2019
84 1 01125-11 50 MVA 220 YNd11 COBRA INSTALACIONES Y SERVICIOS LA SOLANILLA SPAIN PHOTOVOLTAIC 24.06.2019 2019

85 1 01122-11 80 MVA 220 YNd11 SOLARPACK INGENIERÍA ALVARADO SPAIN PHOTOVOLTAIC 09.08.2019 2019
86 1 01126-11 40 MVA 220 YNd11 GREENALIA-ELECNOR REGOELLE SPAIN WIND POWER 23.09.2019 2019
87 1 01138-11 56 MVA 132 YNd11 SOLARPACK INGENIERÍA GRULLAS SPAIN PHOTOVOLTAIC 19.09.2019 2019
88 1 01154-11 50 MVA 132 YNd11 COBRA INSTALACIONES Y SERVICIOS GALISTEO SPAIN PHOTOVOLTAIC 04.11.2019 2019
89 4 01155-11 10 MVA 58 Ia0 ELECNOR SALAMANCA SPAIN RAILWAY 28.10.2019 2019

90 11 01127/37-10 10 MVA 58 Ia0 ADIF PEDRALBA LA PRADERÍA-ORENSE SPAIN RAILWAY 23.10.2019 2019

92 1 01124-11 140 MVA 220 YNd11 GREENALIA-ELECNOR CAMPELO SPAIN WIND POWER 20.12.2019 2019

93 2 01165/66-11 0,4 MVA 21 - SKRM VOSTOCHNIY RUSSIA SCSR 01.10.2019 2019


91 15 01139-11 11 MVA 59 Ia0 ADIF ALGECIRAS SPAIN RAILWAY under execution 2021
94 1 01160-11 55 MVA 132 YNd11 IBERDROLA RENOVABLES TERUEL SPAIN PHOTOVOLTAIC under execution 2020
95 3 01161-10 55 MVA 132 YNd11 IBERDROLA RENOVABLES CAMPO ARAÑUELO I, II, III (ALMARAZ) SPAIN PHOTOVOLTAIC under execution 2020
96 1 01167-10 56 MVA 132 YNd11 EIFFAGE ENERGÍA TURRONEROS SPAIN WIND POWER 06.03.2020 2020
97 1 01164-11 45 MVA 66 YNd11 SISTEM MELESUR EL ALMENDRO SPAIN WIND POWER under execution 2020
98 1 01168-10 55 MVA 132 YNd11 IBERDROLA RENOVABLES BARCIENCE SPAIN PHOTOVOLTAIC under execution 2020
99 1 01169-10 55 MVA 132 YNd11 IBERDROLA RENOVABLES PANONDRES SPAIN PHOTOVOLTAIC under execution 2020
100 1 01159-11 45 MVA 132 YNd11 ELECNOR PARACUELLOS DE JILOCA SPAIN PHOTOVOLTAIC under execution 2020
101 1 01170-11 125 MVA 220 YNd11 IBERDROLA RENOVABLES MALPARTIDA DE CÁCERES SPAIN PHOTOVOLTAIC under execution 2020
102 1 01171-11 55 MVA 220 YNd11 IBERDROLA RENOVABLES MALAGA SPAIN PHOTOVOLTAIC under execution 2020

103 1 01172-20 55MVA 132 YNd11 IBERDROLA RENOVABLES ASTURIAS SPAIN PHOTOVOLTAIC 2020

104 1 01173-11 30 MVA 66 YNd11 PRODIEL SAN ANTONIO SPAIN PHOTOVOLTAIC 2020

105 1 01174-10 25 MVA 66 YNd11 PRODIEL TORREPALMA SPAIN PHOTOVOLTAIC 2020

106 1 01176-11 65MVA 132 YNd11 COBRA ICTIO TOLEDO SPAIN PHOTOVOLTAIC 2020

107 1 01177-10 50 MVA 132 YNd11 COBRA ICTIO SOLAR SPAIN PHOTOVOLTAIC 2020

108 1 01178-10 140 MVA 220 YNd11 COBRA ICTIO ALCÁZAR SPAIN PHOTOVOLTAIC 2020

109 1 01179-10 80 MVA 132 YNd11 COBRA ICTIO EL VEGON PEREA SPAIN PHOTOVOLTAIC 2020

110 1 01180-10 50 MVA 66 YNd11 PRODIEL - UCP - LANTANIA CASAQUEMADA SPAIN PHOTOVOLTAIC 2020

May 2020 Production facilities 27


FARAMAX
CERTIFIED QUALITY SYSTEM TRAFO

May 2020 Production facilities 28

You might also like