Coarse aggregate
(m3) 0.363A-0.76
(i) 20 mm & 0.176A-0.21
0.178A-0.21
down
(ii) 40 mm & 0.0027A+0.0001A2
down 0.145A+1.5 +0.45
0.075A+0.78
Timber (m3)
(i) Frames & 0.019A+0.23 0.019A+0.23 0.02A+0.11
shutters
(ii) Shuttering 0.0042A 0.0042A 0.0097A-0.03
Lime (quintal) 0.145A-0.35 0.083A-0.17 0.063A-0.08
Surkhi (m3) 0.052A-0.37 0.026A-0.18 0.01A
Bitumen (Kg) 1.836A-9 0.918A -4 0.357A+0.14
Glass Panes(m2) 0.047A 0.047A 0.047A
Primer for oil paint 0.048A 0.048A 0.045A+0.56
(litre)
Oil Paint (litre) 0.08A+0.27 0.08A+0.27 0.075A+0.93
Note:-
1. The above expression is applicable for plinth area ranges from 30 to 300m2(one floor)
2. In case of single and double storeyed framed buildings, and up to 100m2 (one floor) for four
storeyed framed building.
3. The above table gives material for one floor / storey. Multiply the No. of Storeys to get total
Quantity.
Rough Estimate (m3 / m2) (Based on plinth area basis)
1. Earth work:
4.DPC :
Framed structure = 0.1 m2 / m2
Load bearing = 0.23 m2 / m2
5.Centering: m2/ m2
Grade beam= 0.35 < 0.40 < 0.45 m2 / m2
Slab, beam etc
Span Single bay Two bay
4.0 m 1.57 1.49
5.0 m 1.51 1.45
6.0 m 1.47 1.42
6. RCC for isolated footing
RCC / m2 = X for LL
Total quantity = X A0 where A0 = Cumulative ultimate floor area in m2
2 2
3.0 KN/m 5.0 KN/m
SBC in
KN/m2 Single bay Two bay Single bay Two bay
50 0.216 0.188 0.245 0.215
75 0.137 0.119 0.155 0.137
100 0.089 0.077 0.100 0.088
120 0.071 0.062 0.080 0.071
150 0.055 0.048 0.062 0.055
200 0.041 0.036 0.046 0.041
220 0.035 0.0305 0.040 0.0354
250 0.030 0.026 0.0335 0.030
300 0.026 0.023 0.029 0.026
400 0.016 0.014 0.0185 0.0165
Quantity = z for LL
2 2
Description 3.0 KN/m 5.0 KN/m
Single bay Two bay Single bay Two bay
RCC floor 0.21 m3 / m2 0.19 m3 / m2 0.22 m3 per m2 0.20 m3 per m2
Note:
1. This is inclusive of staircase and discontinuous sunshade but exclusive
of items (2) below.
2. Include the following, if present:
a. For slab thickness > 100 mm add extra quantity per m2 over 0.1m3
b. For floor systems with primary and secondary beams add + 0.02 m3 / m2
c. For canopy in G.F, add 0.01 m3 / m2
d. For drops up to 1.20 m, add 0.01 m3 / m2
e. For Continuous sunshade of 0.60 to 0.75 m alround the building, add 0.15 m3 / m2
f. For sun- breakers up to 0.6 m, add 0.01 m3 / m2
Steel for slab, beam & column (item wise)
4.7 to 5.0 m2 / m2
Office Building
2
(a) Load Bearing 4 Kg / m2
(b) Framed 6..5 Kg / m2
70 to 100
3 Plinth Beam
100 to 130
4 Lintel
100 to 200
5 Column
150 to 200
6 Beam
60 to 75
7 Slab
90 to 120
8 Stairs
Estimation of Quantity of Reinforcement
For rough calculation of reinforcement steel in construction Projects following thumb rule
may be adopted:
(i) Slab 80 Kg / m3
(ii) Beam 110 Kg / m3
(iii) Column 160 Kg / m3
(iv) Footing slab 80 Kg / m3
Note:-
As per IS 456 – 2000 Maximum cement content should not exceed 450 Kg / m3
for the cement mortar to ensure that heat of hydration and shrinkage cracking
are prevented.
COST OF BUILDING (GENERAL)
5. Cost of Flooring 6%
6. Cost of Doors & Windows 20%
7. Cost of Plastering & finishing 7%
Materials % Labour %
Brick 16 Mason 8
Sand 4 Carpenter 3.5
C.A. 4.5 Mazdoor 12
Cement 19
Timber in scantling 9.5
Steel 23.5
Total 76.5 23.5
Overall 100%
Component %
Plinth 18
Superstructure 27
Flooring 8
Roofing (Flat) 20
Wood work 17
Miscellaneous 10
Total 100
ORDINARY BUILDINGS
Materials % Labour %
Cement 13 Excavation 1
Steel 10 Masons 25
Timber 12 Carpenter 12
Other Materials 25 Black smith 2
Total 60 Total 40