Professional Documents
Culture Documents
Subcont Individual Improvement Program (Gen)
Subcont Individual Improvement Program (Gen)
2012
Content :
Normal Project: Regular Rollout Activity (Colo, New Site, Upgrade, Rehoming, Reparenting, New BSC/RNC)
Gap Analysis Special: Drive Test engineer required to have additional 25% with skill level-3 out of total drive tester PLO engineer required to have additional 40% with skill level-3 and 10% with skill level-4 out of total PLO engineer RNPO engineer required to have 10% with skill level-4 out of total RNPO engineer TNP engineer required to have 30% with skill level-4 out of total TNP engineer PM needed to increased skill level from level-2 to level-3
Quality Management
Those check list is to ensure the deliverable are well checked before submitted to NSN end customer (Tsel, ISAT, & HCPT).