Professional Documents
Culture Documents
Length (km)
Area
Blue
Mountains
Campbelltown
East Hills
Granville
Oatley
Rockdale
Smithfield
40
40.5
22.3
8
18.5
8.5
50
Current Toll
$
$
$
$
$
$
$
4.40
4.40
8.26
Based on M7
Toll
Based on
Lambert
Report
$0.500 per km
$
$
$
$
$
$
$
15.36
15.55
8.56
3.07
7.10
3.26
19.20
$
$
$
$
$
$
$
20.00
20.25
11.15
4.00
9.25
4.25
25.00
M2
M4
M5
M5 East
M7
CCT
LCT
ED
SHT
SHB
Southern Cross Dr
General Holmes Dr
Gore Hill Freeway
Warringah Freeway
Cahill Expressway
Length
(km)
Current Toll
21
40
22
10
40
2.1
3.6
6
2.3
1.149
8.5
$
$
$
$
$
$
$
$
$
$
$
4.95
4.40
7.16
4.65
2.93
5.50
4.00
4.00
-
2.3
4
2
$
$
$
Based on M7
Toll
Based on
Lambert
Report
$0.500 per km
$
10.50
$
20.00
$
11.00
$
5.00
$
20.00
$
1.05
$
1.80
$
3.00
$
1.15
$
0.57
$
4.25
$
$
$
$
$
$
0.88
1.54
0.77
1.15
2.00
1.00
* This is the per kilometre rate that will apply by the next election when the new toll system is expected to be enforced.
**Currently the M7 is capped at $7.16. This figure represents the full cost based on the per kilometre rate.