BAHAN BANGUNAN
Pasir pasang
Kerikil
Semen PC ( isi 40 Kg ) Gresik
Kayu Ulin
10/10 cm - 4 M
5/10 cm - 4 M
8/8 cm - 4 M
5/7 cm - 4 M
5/5 cm - 4 M
3/20 cm - 4 M
2/20 cm - 4 M
Kayu Meranti
10/10 cm - 4 M
5/10 cm - 4 M
8/8 cm - 4 M
5/7 cm - 4 M
5/5 cm - 4 M
3/5 cm - 4 M
2/20 cm - 4 M
Paku Kayu
Paku Ulin
Paku Triplek
Paku anti karat
Besi Beugel / Baut ( Kuda-kuda )
Genteng metal Prima colour tebal 0,35 mm
Bubungan Genteng metal
Seng plat 3" x 6" BJLS 28
Plywood 3 mm
Bak Mandi Fibreglass ukuran sedang
Closed jongkok porselen
Pipa PVC diameter 2" AW (Maspion)
Pipa PVC diameter 4" AW (Maspion)
Cat Kayu Mengkilat merk Platon
Cat Menie
Cat Dasar
Kran Air
Baut 10 cm s/d 24 cm
Minyak Cat ( Thiner A )
Hitachi
Sambungan, L, T, PVC
Engsel jendela ( kualitas standart )
Engsel pintu ( kualitas standart )
Kunci tanam 2 slag
Kaca bening ukuran 3 mm
Septicktank

M
Zak
Bh

Rp.
Rp.
Rp.

200,000.200,000.150,000.-

Btg
Btg
Btg
Btg
Btg
Kpg
Kpg

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

90,000.60,000.75,000.40,000.30,000.125,000.60,000.-

Btg
Btg
Btg
Btg
Btg
Kpg
Kpg
Kg
Kg
Kg
Kg
Kg
M
M'
Lbr
Lbr
Bh
Bh
Btg
Btg
Kg
Kg
Kg
Kg
Kg
Ltr
Bh
Lbr
Bh
Bh
Bh
M
Unit

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

60,000.30,000.40,000.25,000.15,000.10,000.25,000.30,000.50,000.30,000.50,000.45,000.95,000.30,000.60,000.65,000.200,000.150,000.70,000.180,000.60,000.30,000.25,000.25,000.20,000.25,000.600,000.10,000.15,000.20,000.150,000.150,000.3,000,000.-

NO.

URAIAN TENAGA

SATUAN

UPAH
HARIAN

KET

1
2
3
4
5

Tukang Batu
Tukang Kayu
Tukang Pancang
Tukang Cat
Pekerja

HOK
HOK
HOK
HOK
HOK

Rp.
Rp.
Rp.
Rp.
Rp.

90,000.90,000.90,000.90,000.70,000.-

6 jam/hari
6 jam/hari
6 jam/hari
6 jam/hari
6 jam/hari

NO.

HARGA BAHAN JADI

SATUAN

HARGA (Rp)

KET

1
2
3
4
5
6
7

Pintu Panel Kayu Meranti


Bingkai Jendela
Papan sudah dimoulding
Almari Buku
Meja 1/2 biro
Meja belajar
Satu Kursi TK + Meja

Unit
Unit
Kpg
Unit
Unit
Unit
Set

700,000
180,000
50,000
1,200,000
500,000
250,000
350,000

DAFTAR ANALISA PEKERJAAN


DINAS PEKERJAAN UMUM KABUPATEN KOTAWARINGIN TIMUR
TRIWULAN
TAHUN : 2009
ANALISA
( SNI )

URAIAN PEKERJAAN

HARGA
SATUAN

UPAH

BAHAH

JUMLAH

PEKERJAAN PERSIAPAN
01.6.4
1 M' Pengukuran dan pasang bouwplank
0.0120 M Kasau 5/7 cm
Rp.
0.0070 M Kayu papan 3/20 cm
Rp.
0.0200 Kg Paku kayu 2" - 5"
Rp.
0.1000 Pekerja
Rp.
0.1000 Tukang kayu
Rp.
PEKERJAAN TANAH
02.6.1
1 M Galian tanah biasa sedalam 1 meter.
0.4000 Pekerja
Rp.
02.6.9

06.6.8

06.6.9

06.6.28

06.6.31

06.6.39

1 M Urugan kembali
0.1920 Pekerja
PEKERJAAN KAYU
1 M Pasang pintu panel kayu lanan
0.0400 M Papan kayu lanan
1.0000 Pekerja
2.5000 Tukang kayu

Rp.

Rp.
Rp.
Rp.

1 M Pasang pintu dan jendela kaca kayu ulin


0.0350 M Papan kayu ulin
Rp.
0.8000 Pekerja
Rp.
2.0000 Tukang kayu
Rp.

60,000.25,000.30,000.70,000.- Rp.
90,000.- Rp.
Rp.

Rp.
Rp.
Rp.
7,000.9,000.16,000.- Rp.

1,495.- Rp.

17,495.-

70,000.- Rp.
Rp.

28,000.28,000.- Rp

- Rp.

28,000.-

70,000.- Rp.
Rp.

13,440.13,440.- Rp

- Rp.

13,440.-

25,000.70,000.- Rp.
90,000.- Rp.
Rp.

Rp.
70,000.225,000.295,000.- Rp.

1,000.-

60,000.70,000.- Rp.
90,000.- Rp.
Rp.

Rp.
56,000.180,000.236,000.- Rp.

2,100.-

1 M Pasang konstruksi kuda-kuda kayu lanan


1.100 M Balok kayu lanan
Rp. 125,000.15.000 Kg Besi strip
Rp.
45,000.0.800 Kg Paku biasa 2" - 5"
Rp.
30,000.4.000 Pekerja
Rp.
70,000.- Rp.
280,000.12.000 Tukang kayu
Rp.
90,000.- Rp. 1,080,000.Rp. 1,360,000.1 M Pasang kasau + reng genteng metal kayu lanan
0.0120 M Balok kayu lanan
Rp. 125,000.0.1500 Kg Paku biasa 2" - 5"
Rp.
30,000.0.1000 Pekerja
Rp.
70,000.- Rp.
7,000.0.1000 Tukang kayu
Rp.
90,000.- Rp.
9,000.Rp.
16,000.1 M Pasang rangka langit-langit (60 x 120) cm kayu lanan
0.0120 M Balok kayu lanan
Rp. 125,000.-

720.175.600.-

1,000.- Rp.

2,100.- Rp.

Rp.
Rp.
Rp.

137,500.675,000.24,000.-

Rp.

836,500.- Rp.

Rp.
Rp.

1,500.4,500.-

Rp.

6,000.- Rp.

Rp.

1,500.-

296,000.-

238,100.-

2,196,500.-

22,000.-

2
0.1000 Kg Paku biasa 2" - 5"
0.1500 Pekerja
0.2500 Tukang kayu

3
Rp.
Rp.
Rp.

30,000.70,000.- Rp.
90,000.- Rp.
Rp.

5
Rp.

10,500.22,500.33,000.- Rp.

6
3,000.-

4,500.- Rp.

37,500.-

1
06.6.53a

06.6.60

F.22

F.38a

F.38e

F.38f

08.6.32

08.6.33
08.6.36

1 M' Pasang lisplang ukuran (2 x 20 dan 2 x 10 ) cm, kayu Ulin


0.0090 M3 Papan kayu ulin
Rp.
60,000.Rp.
0.0500 Kg Paku ulin
Rp.
50,000.Rp.
0.1100 Pekerja
Rp.
70,000.- Rp.
7,700.0.2200 Tukang kayu
Rp.
90,000.- Rp.
19,800.Rp.
27,500.- Rp.
1 M' Pasang list plafond kayu profil
1.0500 M' Kayu profil
Rp.
15,000.Rp.
0.0100 Kg Paku biasa
Rp.
30,000.Rp.
0.0210 Pekerja
Rp.
70,000.- Rp.
1,470.0.0210 Tukang kayu
Rp.
90,000.- Rp.
1,890.Rp.
3,360.- Rp.
1 M Pekerjaan rangka badan bahan kayu ulin
1.1000 M Balok kayu ulin
Rp
Rp
6.0000 Kg Paku ulin
Rp.
50,000.Rp.
8.0000 Pekerja
Rp.
70,000.- Rp.
560,000.24.000 Tukang kayu
Rp.
90,000.- Rp. 2,160,000.Rp. 2,720,000.- Rp.
1 M Lantai kayu ulin tebal 2 cm diserut rapi
0.0233 M Papan kayu ulin
Rp.
60,000.Rp.
0.2000 Kg Paku ulin
Rp.
50,000.Rp.
0.6000 Pekerja
Rp.
70,000.- Rp.
42,000.1.8000 Tukang kayu
Rp.
90,000.- Rp.
162,000.Upah 1/2 x F38 Rp.
102,000.- Rp.
1 M Dinding kayu ulin tebal 2 cm diserut rapi
dengan sambungan lidah alur
0.0230 M Papan kayu ulin
Rp.
60,000.Rp.
0.2000 Kg Paku ulin
Rp.
50,000.Rp.
0.6000 Pekerja
Rp.
70,000.- Rp.
42,000.1.8000 Tukang kayu
Rp.
90,000.- Rp.
162,000.Upah 3/4 x F38e Rp.
153,000.- Rp.
1 M Dinding kayu lanan tebal 2 cm diserut rapi
dengan sambungan lidah alur
0.0230 M Papan kayu lanan
Rp.
25,000.Rp.
0.2000 Kg Paku kayu
Rp.
30,000.Rp.
0.6000 Pekerja
Rp.
70,000.- Rp.
42,000.1.8000 Tukang kayu
Rp.
90,000.- Rp.
162,000.Upah 3/4 x F38f Rp.
153,000.- Rp.
PEKERJAAN PENUTUP ATAP
1 M Pasang atap genteng metal
1.0200 M Gtg Prima colour tbl 0,35 mm Rp.
95,000.Rp.
0.0750 Kg Paku anti karat
Rp.
50,000.Rp.
0.2000 Pekerja
Rp.
70,000.- Rp.
14,000.0.1000 Tukang kayu
Rp.
90,000.- Rp.
9,000.Genteng Prima colour tbl 0,35 mm .
Rp.
23,000.- Rp.
160.0000
M
Pasang
atap
sirap
Lb
Sirap
900.-- Rp.
0.2000
Kg
Paku
sirap
Rp.
13,800.0.1660
Pekerja
70,000.11,620.-- Rp.
0.2500
Tukang
kayu
90,000.Rp.
22,500.0.0250
Kepala
tukang
0.0080
Mandor
Rp
Rp
34,120.Rp.
1 M' Pasang nok genteng metal
1.0000 M' Bubungan metal
Rp.
30,000.Rp.
0.0075 Kg Paku anti karat
Rp.
50,000.Rp.
0.2500 Pekerja
Rp.
70,000.- Rp.
17,500.0.1500 Tukang kayu
Rp.
90,000.- Rp.
13,500.Rp.
31,000.- Rp.

6
540.2,500.-

3,040.- Rp.

30,540.-

15,750.300.-

16,050.- Rp.

19,410.-

300,000.-

300,000.- Rp.

3,020,000.-

1,398.10,000.-

11,398.- Rp.

113,398.-

1,380.10,000.-

11,380.- Rp.

164,380.-

575.6,000.-

6,575.- Rp.

159,575.-

96,900.3,750.-

100,650.- Rp.
54,000.2,760.- Rp.
56,760.-

123,650.90,880.-

30,000.375.-

30,375.- Rp.

61,375.-

1
09.6.10a

10.6.3

10.6.6

11.6.19

12.6.2

12.6.5

12.6.6

12.6.17

PEKERJAAN LANGIT - LANGIT.


1 M Langit-langit Plyawood (60 x 120) cm, tebal 3 mm.
0.3750 Lb Plyawood 3mm
Rp.
65,000.0.0300 Kg Paku plywood
Rp.
30,000.0.0700 Pekerja
Rp.
70,000.- Rp.
0.1000 Tukang kayu
Rp.
90,000.- Rp.
Rp.
PEKERJAAN SANITASI.
Memasang 1 buah closed jongkok teraso
1.0000 Bh Closed jongkok teraso
Rp. 150,000.7.0000 Bh Bata merah 5 x 11 x 22 cm Rp. 150,000.6.0000 Kg Semen PC
Rp. 200,000.0.0100 M Pasir pasang
Rp. 200,000.1.0000 Pekerja
Rp.
70,000.- Rp.
1.5000 Tukang batu
Rp.
90,000.- Rp.
Rp.
Memasang 1 buah bak mandi teraso volume 0,30 m
1.0000 Bh Bak teraso
Rp. 200,000.6.0000 Kg Semen PC
Rp. 200,000.0.0100 M Pasir pasang
Rp. 200,000.2.1000 Pekerja
Rp.
70,000.- Rp.
0.7500 Tukang batu
Rp.
90,000.- Rp.
Rp.
1 M' Pasang talang miring, seng BJLS 28
0.5000 Lbr Seng plat 3' x 6' BJLS 28
Rp.
60,000.0.0150 Kg Paku biasa " - 1"
Rp.
30,000.0.0190 M Kayu borneo papan
#REF!
0.0400 Pekerja
Rp.
70,000.- Rp.
0.4000 Tukang kayu
Rp.
90,000.- Rp.
Rp.
PEKERJAAN KUNCI DAN KACA
1 Buah pasang kunci tanam biasa
1.0000 Bh Kunci tanam biasa
Rp. 150,000.0.0100 Pekerja
Rp.
70,000.- Rp.
0.5000 Tukang kayu
Rp.
90,000.- Rp.
Rp.
1 Buah pasang engsel pintu
1.0000 Bh Engsel pintu
Rp.
20,000.0.0150 Pekerja
Rp.
70,000.- Rp.
0.1500 Tukang kayu
Rp.
90,000.- Rp.
Rp.
1 Buah pasang engsel jendela kupu-kupu
1.0000 Bh Engsel jendela
Rp.
15,000.0.0100 Pekerja
Rp.
70,000.- Rp.
0.1000 Tukang kayu
Rp.
90,000.- Rp.
Rp.
1 M pasang kaca, tebal 5 mm
1.1000 M Kaca tebal 5 mm
Rp. 150,000.0.0150 Pekerja
Rp.
70,000.- Rp.
0.1500 Tukang kayu
Rp.
90,000.- Rp.
Rp.

Rp.
Rp.
4,900.9,000.13,900.- Rp.

24,375.900.-

25,275.- Rp.

39,175.-

Rp.
150,000.Rp. 1,050,000.Rp. 1,200,000.Rp.
2,000.70,000.135,000.205,000.- Rp. 2,402,000.- Rp.

2,607,000.-

Rp.
200,000.Rp. 1,200,000.Rp.
2,000.147,000.67,500.214,500.- Rp. 1,402,000.- Rp.
Rp.
Rp.
2,800.36,000.38,800.-

1,616,500.-

30,000.450.#REF!

#REF!

Rp.
700.45,000.45,700.- Rp.

150,000.-

Rp.
1,050.13,500.14,550.- Rp.

20,000.-

Rp.
700.9,000.9,700.- Rp.

15,000.-

Rp.
1,050.13,500.14,550.- Rp.

165,000.-

150,000.- Rp.

20,000.- Rp.

15,000.- Rp.

165,000.- Rp.

#REF!

195,700.-

34,550.-

24,700.-

179,550.-

PEKERJAAN PENGECATAN
14.6.6

1 M Mendempul dan menggosok kayu


0.0800 Kg Dempul jadi

Rp.

20,000.-

Rp.

1,600.-

0.0200 Kg Minyak cat

Rp.

25,000.-

Rp.

500.-

0.0100 Kg Batu apung

Rp.

10,000.-

Rp.

100.-

0.0400 Pekerja

Rp.

70,000.- Rp.

2,800.-

0.0400 Tukang cat

Rp.

90,000.- Rp.

3,600.-

Rp.
14.6.8

6,400.- Rp.

2,200.- Rp.

8,600.-

1 M Pengecatan bidang kayu baru (1 lapis plamir,


1 lapis cat dasar, 2 lapis cat penutup)
0.2000 Kg Cat meni

Rp.

30,000.-

Rp.

6,000.-

0.1500 Kg Plamir

Rp.

25,000.-

Rp.

3,750.-

0.1700 Kg Cat dasar

Rp.

25,000.-

Rp.

4,250.-

0.2600 Kg Cat penutup

Rp.

60,000.-

Rp.

15,600.-

0.0700 Pekerja

Rp.

70,000.- Rp.

0.0090 Tukang cat

Rp.

90,000.- Rp.
Rp.

14.6.12

14.6.14

E.4

E.13

11.2.6

11.2.4

1 M Pelaburan bidang kayu dengan cat residu dan ter


0.3500 Ltr Ter atau residu
Rp. 600,000.0.1000 Pekerja
Rp.
70,000.- Rp.
Rp.
1 M Pengecatan bidang tembok baru (1 lapis plamir,
1 lapis cat dasar, 2 lapis cat penutup).
0.1000 Kg Plamir
Rp.
25,000.0.1000 Kg Cat dasar
Rp.
25,000.0.2600 Kg Cat penutup 2 x
Rp.
60,000.0.0200 Pekerja
Rp.
70,000.- Rp.
0.0630 Tukang cat
Rp.
90,000.- Rp.
Rp.
Membuat 1 Pasang Pen dan Lobang
0.6000 Tukang Kayu
Rp.
90,000.- Rp.
Rp.
Upah x 1/4
Rp.
1 M' Tiang Dipancang kedalam Tanah
(Dihitung Bagian Yang Masuk )
0.6000 Pekerja
Rp.
70,000.- Rp.
0.0400 Tukang Kayu
Rp.
90,000.- Rp.
Rp.
Upah x 1/4
Rp.
1 M3 Pasang Gording Bahan Kayu Lanan
(Kayu Kls Kuat II) :
5.8000 Tukang Kayu
Rp.
90,000.- Rp.
1.9400 Pekerja
Rp.
70,000.- Rp.
1.1000 M3 Balok Lanan
Rp. 125,000.- Rp.
2.2000 Kg Paku Biasa (Paku Kayu)
Rp.
30,000.- Rp.
Rp
1 M3 Kuda-Kuda Bentang 6 s/d 9 m
Kayu Lanan (Kayu Kls Kuat II) :
20.0000 Tukang Kayu
6.7000 Pekerja

Rp.
Rp.

4,900.810.5,710.- Rp.

29,600.- Rp.

Rp.
7,000.7,000.- Rp.

210,000.-

Rp.
Rp.
Rp.

2,500.2,500.15,600.-

1,400.5,670.7,070.- Rp.

210,000.- Rp.

35,310.-

217,000.-

20,600.- Rp.

27,670.-

54,000.54,000.13,500.-

Rp.
Rp.

54,000.13,500.-

42,000.3,600.45,600.11,400.-

Rp.
Rp.

45,600.11,400.-

137,500.66,000.203,500.- Rp.

203,500.-

522,000.135,800.137,500.- Rp.
66,000.- Rp.
- Rp.

90,000.- Rp. 1,800,000.70,000.- Rp.


469,000.-

2
1.1000 M3 Balok Lanan
3.0000 Kg Paku Biasa
15.0000 Kg Besi Strip/Mur Baut

Rp.
Rp.
Rp.

125,000.- Rp.
30,000.- Rp.
45,000.- Rp.
Rp

137,500.90,000.675,000.-

Rp.
Rp.
Rp.
Rp.

137,500.90,000.675,000.902,500.- Rp.

902,500.-

Kabupaten
Kecamatan
Desa

: Katingan
: Bukit Raya
: Rangan Bahekang
a

2. PEKERJAAN TANAH
2.a. Pekerjaan Penggalian Tanah Pondasi
Volume
Bahan :
Upah :
- Pekerja

Take Of Sheet
b

(((0.60+0.80)/2)x0.50) x ((8.40x7)+(3.40x2))
-

0.4000

0.1920

22.96

9.18

17.22
17.22

3. PEKERJAAN PONDASI
Pondasi dari Bahan Tiang Pancang Kayu Ulin 10/10 cm
Volume
: Bangunan Utama
8
x
7
=
56
: Bangunan Teras
4
x
2
=
8
- Total Tiang Pondasi
Total Bahan
=
64
Bahan :
- Balok Kayu Ulin 10/10 cm - 4.00 m
6
- Balok Kayu Ulin 10/10 cm - 2.00 m
64
6
dalam kubikan
0.1
x
0.1
x
4
x
6
0.1
x
0.1
x
2
x
58
Total Kubikan Kayu Ulin 10/10 cm
0.24
+
1.16
dlm Batang Kayu Ulin 10/10cm-4.00m
1.4
/ ( 0.10 x 0.10 x 4.00 )
3.a. Pekerjaan Membuat Pen dan Lubang Sunduk
Volume
Jumlah Tiang Pondasi
Bahan :
- Balok Kayu Ulin 5/7 cm - 50 cm
0.50
x
dalam batang Ulin 5/7 cm -4.00 m
32
/

22.96
-

2.b. Pekerjaan Pengurugan Kembali Tanah Galian


Volume
3/4
xVolume Galian
0.75
x 22.96
Bahan :
Upah :
- Pekerja

Jenis Prasarana : Posyandu


Tipe Konstruksi : Bgn Kayu
Ukuran/Dimensi : 6.00 x 8.00 m
c

3.31

64
6
58
0.24
1.16
1.40
35
64

64
4.00

32
8

3.c. Pekerjaan Kacapuri/Kalang Balok Kayu Ulin 2 x 5/10 cm


Volume
- Bangunan Utama
8.00
x
7.00
- Teras Depan
4.00
x
2.00
Total panjang
Bahan :
- Balok Kayu Ulin 5/10 cm - 4.00 m
128.00
0.05 x
0.10
dalam kubikan

x
x

2.00
2.00

=
=

112
16
128

/
x

4.00
32.00

x
x

4.00
4.00

0.10

1.100
0.05
6.0000

x
x
x

0.88
0.10
0.88

8.0000

0.88

0.10
0.10

x
x

0.10
0.10

x
x

7
2

1.1000
0.10
6.0000

x
x
x

0.62
0.10
0.62

4.00

24.0000 x
8.0000 x

0.62
0.62

128.00
32.00
0.16

Upah :
4. PEKERJAAN RANGKA BADAN BAWAH
4.a. Pekerjaan Suai Kayu Ulin 5/10 cm
Volume
- Arah Memanjang
- Arah Melintang
dalam kubik :
Bahan :
- Balok Kayu Ulin 5/10 cm - 4.00 m
dalam batang
- Paku Ulin/Baut-Mur

13
x
2
9
x
2
Total Panjang
176.00 x
0.05
0.97

Upah :
- Pekerja
4.b. Pekerjaan Memasang Sloof Balok Ulin 10/10 cm
Volume
: Bangunan Utama
8.00
x
: Bangunan Teras
3.00
x
Bahan :
- Balok Kayu Ulin 10/10 cm - 4.00 m
dalam batang
- Paku Ulin
Upah :
- Tukang Kayu
- Pekerja

0.68

= 104.00
= 72.00
= 176.00
=
0.88
x

4.00

0.88
0.97
49
5.28
7.04
0.56
0.06
0.62
0.68
17.05
3.72
14.88
4.96

4.c. Pekerjaan Memasang Gelagar Balok Kayu Ulin 5/10 cm


Volume
: Bangunan Utama
8.00 /
0.50
: Bangunan Teras
3.00 /
0.50
Total panjang bahan
dalam kubik :
24.00 x
0.05
Bahan :
- Balok Kayu Ulin 5/10 cm - 4.00 m
1.1000
dalam batang
0.13
/
0.05
- Paku Ulin
6.0000
Upah :
- Tukang Kayu
- Pekerja
5. PEKERJAAN RANGKA BADAN ATAS
5.a. Pekerjaan Tiang Kolom Balok Kayu Ulin 10/10 cm
Volume
0.10
x
Bahan :
- Balok Kayu Ulin 10/10 cm - 4.00 m
dalam batang
0.44
/
- Paku Ulin
Upah :
- Tukang Kayu
5.b. Pekerjaan Tiang Kolom Balok Kayu Ulin 5/10 cm
Volume
0.05
x
Bahan :
- Balok Kayu Ulin 5/10 cm - 4.00 m
dalam batang
0.40
/
- Paku Ulin
Upah :
- Tukang Kayu

+
+

1
1

0.10

x
x
x

0.12
0.10
0.12

24.0000 x
8.0000 x

0.12
0.12

0.10

17
7
24
0.12

4.00

0.12
0.13
6.60
0.72
2.88
0.96

4.00

10

0.40

1.1000 x
0.10
x
6.0000 x

0.40
0.10
0.40

4.00

0.44
11.00
2.40

24.0000 x

0.40

9.60

0.10

4.00

18

0.36

1.1000
0.05
6.0000

x
x
x

0.36
0.10
0.36

4.00

0.40
19.80
2.16

24.000

0.36

5.c. Pekerjaan Tiang Kuzen Pintu/Jendela Balok Kayu Ulin 5/10 cm


Volume
0.05
x
0.10
x
Bahan :
- Balok Kayu Ulin 5/10 cm - 4.00 m
1.1000 x
dalam batang
0.53
/
0.05
x
- Paku Ulin
6.0000 x
Upah :
- Tukang Kayu

=
=
=
=

24.0000 x

8.64

4.00

24

0.48

0.48
0.10
0.48

4.00

0.53
26.40
2.88

0.48

11.52

5.d. Pekerjaan Malangan Kuzen Pintu/jendela Balok Kayu Ulin 5/10 cm


Volume
Pintu P1
: 1 buah
0.05
x
0.10
x
Pintu P2
: 3 Buah
0.05
x
0.10
x
Pintu P3
: 1 Buah
0.05
x
0.10
x
Jendela J1
: 4 Buah
0.05
x
0.10
x
Ventilasi V1
: 1 Buah
0.05
x
0.10
x
Bahan :
- Balok Kayu Ulin 5/10 cm - 4.00 m
dalam batang
- Paku Ulin

0.16

Upah :
- Tukang Kayu

1.82
0.92
0.62
0.72
0.62

x
x
x
x
x

2
6
2
24
2

x
x
x

0.14
0.10
0.14

4.00

24.0000 x

0.14

1.1000
0.05
6.0000

5.e. Pekerjaan Memasang Ringbalk Balok Kayu Ulin 5/10 cm


Volume
- Arah Memanjang
0.05
x
0.10
- Arah Melintang
0.05
x
0.10
Bahan :
- Balok Kayu Ulin 5/10 cm - 4.00 m
dalam batang
- Paku Ulin
Upah :
- Tukang Kayu

0.33

1.1000
0.05
6.0000

x
x

31.50
29.00

x
x
x

0.30
0.10
0.30

24.0000 x

0.30

6. PEKERJAAN RANGKA ATAP


6.a. Pekerjaan Kuda-kuda Balok Kayu Lanan 6/12 cm
Volume untuk Bangunan Utama bentang 6.00 m :
- Balok Tarik 6/12 cm
0.06
x
0.12
- Kaki Kuda2 I 6/12 cm
0.06
x
0.12
- Kaki Kuda2 II 6/12 cm
0.06
x
0.12
- Balok penyukung 6/12 cm
0.06
x
0.12
- Tiang Kuda2 6/12 cm
0.06
x
0.12
- Balok Penjepit 5/10 cm
0.06
x
0.12
- Balok Penyambung 6/12 cm
0.06
x
0.12
Untuk 1 buah kuda-kuda
Untuk 2 Buah Kuda-kuda :
0.280

x
x
x
x
x
x
x

6.10
1.82
3.52
1.57
2.51
2.32
1.20

0.02
0.03
0.01
0.09
0.01
0.14
0.16
7.95
0.87
3.47

=
=
=

0.16
0.15
0.30

4.00

0.30
0.33
16.64
1.82
7.26

x
x
x
x
x
x
x

1
2
5
2
1
2
1

0.044
0.026
0.127
0.023
0.018
0.033
0.009
0.280
0.56

Volume untuk Teras bentang 3.00 m :


- Balok Tarik 6/12 cm
0.06
x
0.12
- Kaki Kuda2 I 6/12 cm
0.06
x
0.12
- Kaki Kuda2 II 6/12 cm
0.06
x
0.12
- Balok penyukung 6/12 cm
0.06
x
0.12
- Tiang Kuda2 6/12 cm
0.06
x
0.12
- Balok Penjepit 5/10 cm
0.06
x
0.12
Untuk 1 buah kuda-kuda
Sambungan kuda-kuda
Untuk 2 Buah Kuda-kuda :
0.113
Total Volume Kuda2
0.56
Balok Ikatan Angin 5/10cm -4.00 m
0.05
x
0.10
0.05
x
0.10
Total bahan
0.79
+
0.04

x
x
x
x
x
x

3.10
1.26
1.78
0.97
1.55
1.52

x
+
x
x
+

2.00
0.23
4.00
2.00
0.02

Bahan :
- Balok Kayu Lanan 6/12 cm - 4.00 m
dalam batang
- Paku Biasa
- Besi Strip/Baut-Mur

x
x
x
x

0.85
0.12
0.85
0.85

20.0000 x
6.7000 x

0.85
0.85

0.93

Upah :
- Tukang Kayu
- Pekerja

1.1000
0.06
3.0000
15.0000

6.b. Pekerjaan Memasang gording Kayu Lanan 6/12 cm


Volume Bangunan Utama
- Arah Memanjang
0.06
x
0.12
- Arah Melintang
0.06
x
0.12
Volume Teras
Total Volume Gording
Bahan :
- Balok Kayu Lanan 6/12 cm - 4.00 m
dalam batang
- Paku Biasa
Upah :
- Tukang Kayu
- Pekerja

0.06

0.80

x
x

55.20
26.12

0.12
0.59

x
+

19.50
0.14

1.1000
0.06
2.2000

x
x
x

0.73
0.12
0.73

5.8000
1.9400

x
x

0.73
0.73

x
x
x
x
x
x

1
2
2
2
1
2

x
x

2
2

4.00

0.022
0.018
0.026
0.014
0.011
0.022
0.113
0.23
0.79
0.04
0.02
0.85
0.93
32.29
2.54
12.68
16.91
5.66

=
=
=
=

0.40
0.19
0.59
0.14

4.00

0.59
0.14
0.73
0.80
27.73
1.60
4.21
1.41

6.c. Pekerjaan Memasang Kasau & Reng Kayu Lanan


Luas Rangka Atap Bangunan Utama
- Arah Memanjang
- Arah Melintang
Luas Atap Anak Bangunan Utama
Total Luas atap bangunan utama
Luas Rangka Atap Teras

(( 4.45 + 10 ) / 2 ) x 3.55 x 2
(( 2 + 8 ) / 2 ) x 3.67 x 2
(( 4.45 + 5.85) / 2 ) x 1.85 x 2
19.06
8.99

51.30
36.70
19.06
10.07

1.8
x
1
x
2
0.85
x
1.5
x
2
Total Bagian I
1/2 x ( 2.30 x 1.80 ) x 2
(( 3.40 + 2.30 ) / 2 ) x 0.85 x 2
Total Bagian II

Total Luas Rangka Atap Seluruhnya

3.6
2.55
6.15
4.14
4.85
8.99

10.07

6.15

8.99

Bahan :
- Balok Kayu Lanan
- Paku Biasa

0.0120
0.1500

x
x

25.21
25.21

0.30
3.78

Upah :
- Tukang Kayu
- Pekerja

0.1000
0.1000

x
x

25.21
25.21

2.52
2.52

6.d. Pekerjaan Memasang Lisplank Kayu Ulin 2/20 cm


Volume : Lisplank 2/20 cm
( 8.00 + 10.00 + 8.00 + 2.50 + 3.00 + 2.50 )
1.8
+
1.9 x
2
Volume : Lisplank 2/20 cm
1.8
+
1.9
x
2
Volume : Lisplank 2/10 cm
Total Panjang Lispank
34
+ 7.4000 +
7.40
Bahan :
- Papan Ulin
dalam batang
- Paku Ulin
Upah :
- Tukang Kayu
- Pekerja

0.44

0.0090
0.02
0.0500

x
x
x

48.80
0.20
48.80

0.2200
0.1100

x
x

48.80
48.80

25.21

34
7.40
7.40
48.80

4.00

0.44
27.45
2.44
10.74
5.37

6.e. Pekerjaan Memasang Penutup Atap Genteng Metal


Luas Atap
= Luas Rangka Atap
Bahan :
- Genteng Metal 0.35 mm
1.0200 x 25.21
- Paku anti karat
0.0750 x 25.21
Upah :
- Tukang Kayu
- Pekerja
6.f. Pekerjaan Memasang Nok Atap Genteng Metal
Volume
6.80
+
Bahan :
- Bubungan Metal
- Paku anti karat

25.21
25.71
1.89

0.1500
0.2500

x
x

25.21
25.21

3.78
6.30

5.90

14.4

27.10

1.0000
0.0075

x
x

27.10
8.00

27.10
0.06

3.60

3.60

7.20

0.5000
0.0150
0.019

x
x
x

7.20
7.20
7.20

3.60
0.11
0.14

0.4000

7.20

2.88

6.00
1.50

x
x

8.00
3.00

Upah :
6.g. Pekerjaan Pasang Talang Miring Seng BJLS 28
Volume
Bahan :
- Seng Plat 3" x 6" BJLS 28
- Paku anti karat
- Papan Lanan
Upah :
- Tukang Kayu
7. PEKERJAAN LANTAI dan DINDING
7.a. Pekerjaan Memasang Lantai Kayu Ulin
Volume
- Luas Lantai Bangunan Utama
- Luas Lantai Teras
Total Luas Lantai
Bahan :
- Papan Kayu Ulin 2/18 cm-4.00m
dalam batang
1.22
- Paku Ulin
Upah :
- Tukang Kayu

0.0233
0.02
0.2000

x
x
x

52.50
0.18
52.50

1.8000

52.50

=
=

48
4.5
52.5
4.00

52.50
1.22
84.95
10.50
94.50

7.b. Pekerjaan Memasang Dinding Kayu Ulin


Volume
Luas Dinding Kayu Ulin
Bahan :
- Papan Kayu Ulin 2/18 cm-4.00m
dalam batang
0.52
- Paku Ulin
Upah :
- Tukang Kayu

0.90

25.30

0.0230
0.02
0.2000

x
x
x

22.77
0.18
22.77

1.8000

22.77

7.c. Pekerjaan Memasang Dinding Kayu Lanan


Volume
Luas Dinding Kayu Lanan
3.50
x 41.50
1
Luas : P1
2.55
x
1.8
x
3
P2
2.55
x
0.9
x
1
P3
2.25
x
0.6
x
4
J1
1.65
x
1.45
x
1
V1
0.40
x
0.60
x
Total Luas Pintu/Jendela & Ventilasi
Total Luas dinding Kayu Lanan
145.25 - 22.77 - 22.64
Bahan :
- Papan Kayu Lanan 2/18 cm-4.00m
0.0230 x 99.85
dalam batang
2.30
/
0.02
x
0.18
- Paku Kayu
0.2000 x 99.85
Upah :
- Tukang Kayu

1.8000

1.8000
0.6000

x
x

4.00

3.13
3.13

0.52
36.37
4.55
40.99

=
=
=
=
=
=
=

145.25
4.59
6.89
1.35
9.57
0.24
22.64

145.25

99.85
x

4.00

99.85

7.d. Memasang Dinding Tawing Layar Kayu Lanan


Volume
Luas Dinding Tawing Layar
(( 1.60 + 3.10 ) / 2 ) x 0.76
(1/2 x 1.60 x 0.84 ) x 2
Total Luas Dinding Tawing Layar
Bahan :
- Papan Kayu Lanan 2/18 cm-4.00m
0.0230 x
3.13
dalam batang
0.07
/
0.02
x
0.18
- Paku Kayu
0.2000 x
3.13
Upah :
- Tukang Kayu
- Pekerja

22.77

2.30
159.47
19.97
179.72

=
=

1.79
1.34
3.13
4.00

3.13
0.07
5.00
0.63
5.63
1.88

PEKERJAAN DAUN PINTU/JENDELA dan VENTILASI


8.a. Pekerjaan Memasang Daun Pintu Kaca Kayu Ulin
Volume
- Daun pintu P1 & P2
0.90
x
Bahan :
- Papan Kayu Uin
dalam batang
0.20
/
Upah :
- Tukang Kayu
- Pekerja

2.10

0.0350
0.02

x
x

5.67
0.18

2.0000
0.0500

x
x

5.67
5.67

x
x

2
1

8. 8.b. Pekerjaan Memasang Daun Pintu Panil Kayu Lanan


Volume
- Daun pintu P2
0.90
x
2.10
- Daun pintu P3
0.60
x
1.80
Total Daun Pintu
Bahan :
- Papan Kayu Lanan
0.0400
dalam batang
0.19
/
0.02
Upah :
- Tukang Kayu
- Pekerja

2.5000
1.0000

x
x

4.86
0.18

x
x

4.86
4.86

8.c. Pekerjaan Memasang Daun Jendela Kaca Kayu Ulin & Ventilasi
Volume
- Daun Jendela J1
0.70
x
1.20
x
8
- Ventilasi P1
0.40
x
1.80
x
1
- Ventilasi P2
0.40
x
0.90
x
3
- Ventilasi P3
0.40
x
0.60
x
1
- Ventilasi J1
0.40
x
0.70
x
8
- Ventilasi V1
0.40
x
0.60
x
1
Total Daun Jendela & Ventilasi
Bahan :
- Papan Kayu Uin
dalam batang
Upah :
- Tukang Kayu
- Pekerja

0.39

0.0350
0.02

x
x

11.24
0.18

2.0000
0.8000

x
x

11.24
11.24

5.67
x

4.00

0.20
13.78
11.34
0.28

=
=
=

3.78
1.08
4.86

4.86

4.00

0.19
13.50
12.15
4.86

=
=
=
=
=
=
=

6.72
0.72
1.08
0.24
2.24
0.24
11.24

11.24

4.00

0.39
27.32
22.48
8.99

8.d. Pekerjaan Memasang Kaca tebal 5 mm


Volume
- Luas bidang Kaca P1 :
0.90
x
2.10
x
P2 :
0.90
x
2.10
x
J1 :
0.70
x
1.20
x
- Ventilasi P1
0.40
x
1.80
x
- Ventilasi P2
0.40
x
0.90
x
- Ventilasi P3
0.40
x
0.60
x
- Ventilasi J1
0.40
x
0.70
x
- Ventilasi V1
0.40
x
0.60
x
Total Luas Bidang Kaca
Bahan :
- Kaca tebal 5 mm
1.1000 x
Upah :
- Tukang Kayu
- Pekerja

2
1
8
1
3
1
8
1

=
=
=
=
=
=
=
=
=

3.78
1.89
6.72
0.72
1.08
0.24
2.24
0.24
16.91

16.91

16.91

18.60
2.54
0.25

0.1500
0.0150

x
x

16.91
16.91

6.00
0.80

+
x

1.50
35.00

Bahan :
- Balok Kayu Lanan
- Paku Biasa 2"-5"

0.0120
0.1000

x
x

80.50
80.50

0.97
8.05

Upah :
- Tukang Kayu
- Pekerja

0.2500
0.1500

x
x

80.50
80.50

20.13
12.08

9. PEKERJAAN PLAFOND
9.a. Pekerjaan Memasang Rangka Plafond
Volume
- Luas bangunan
8.00
- Luar Tepi Bangunan/Surau

9.b. Pekerjaan Memasang Penutup Plafond Flaywood 60 x 120 cm tebal : 3 mm


Volume
- Luas bidang Rangka plafond
80.50
Bahan :
- Playwood tebal 3 mm
0.3750 x 80.50
- Paku Playwood
0.0300 x 80.50
Upah :
- Tukang Kayu
- Pekerja

0.1000
0.0700

x
x

80.50
80.50

3.00

52.5
28.00
80.50

80.50
30.19
2.42
8.05
5.64

9.c. Pekerjaan Memasang List Frofil Plafond


Volume
Panjang List profil 4 cm
10+(8x4)+(6X4)+(2.50x14)+5+(3x4)+(1.50x8)+(2x2)
Bahan :
- Kayu Profil
1.0500 x 134.00
- Paku
0.0100 x 134.00
Upah :
- Pekerja

0.0210

10. PEKERJAAN PENGECATAN


10a. Pekerjaan Mengecat Dinding Kayu Luar/dalam & Tawing Layar
Volume :
- Luas Dinding
22.77 + 99.85 +
bagian luar dalam termasuk kamar :
125.75 x
Bahan :
- Plamir
0.1000 x
- Cat Dasar
0.1000 x
- Cat Penutup
0.2600 x
Upah :
- Pekerja

0.0200

10.b. Pekerjaan Mendempul dan Menggosok bidang kayu


Volume
- Luas
P1 :
Malangan
:
0.25
x
1.80
Tiang Pintu
:
0.25
x
2.60
- Luas
Malangan
Tiang Pintu

:
:

- Luas
Malangan
Tiang Pintu

:
:

- Luas
Malangan
Tiang Jendela

:
:

- Luas
Malangan
Tiang Ventilasi

:
:

134.00

3.13
2

134
140.70
1.34
2.81

125.75
127.75

127.75
127.75
127.75

12.77
12.77
33.21

127.75

2.55

x
x

2
2

=
=
=

0.90
1.30
2.20

P2 :
0.25
0.25

x
x

0.90
2.60

x
x

6
6

=
=
=

1.35
3.90
5.25

0.25
0.25

x
x

0.60
2.30

x
x

2
2

=
=
=

0.30
1.15
1.45

0.25
0.25

x
x

0.70
1.70

x
x

24
12

=
=
=

4.20
5.10
9.30

0.25
0.25

x
x

0.60
0.55

x
x

2
2

=
=
=

0.30
0.28
0.58

P3 :

J1 :

V1 :

- Luas daun Pintu P2 :


- Luas daun Pintu P3 :
- Luas Profil plafond :
Total Luas Bidang yang didempul

0.90
x
2.10
x
4
=
7.56
0.60
x
1.80
x
2
=
2.16
0.04
x 140.70
=
5.63
(2.20+5.25+1.45+9.30+0.58+7.56+2.16+5.63)

23.27

Bahan :
- Dempul Jadi
- Minyak Cat
- Batu Apung/Ampelas

0.0800
0.0200
0.0100

x
x
x

23.27
23.27
23.27

1.86
0.47
0.23

Upah :
- Pekerja

0.0400

23.27

0.93

10.c. Pekerjaan Mengecat bidang kuzen/malangan, daun Pintu/Jendela & Ventilasi


Volume
- Luas bidang :
23.27
Bahan :
- Cat Menie
0.2000 x 23.27
- Plamir
0.1500 x 23.27
- Cat Dasar
0.1700 x 23.27
- Cat Penutup
0.2600 x 23.27
Upah :
- Pekerja
10.d. Pekerjaan Mengecat Penutup Plafond
Volume
- Luas plafond
Bahan :
- Plamir
- Cat Dasar
- Cat Penutup
Upah :
- Pekerja
10.e. Pekerjaan Mengecat Lisplank 2/10 cm dan 2/20 cm
Volume
- Luas
0.02
+
Bahan :
- Cat Menie
- Plamir
- Cat Dasar
- Cat Penutup
Upah :
- Pekerja

0.0700

23.27
4.65
3.49
3.96
6.05

23.27

1.63

80.50

80.50

0.1000
0.1000
0.2600

x
x
x

80.50
80.50
80.50

8.05
8.05
20.93

0.0200

80.50

1.61

0.2

0.2

0.2000
0.1500
0.1700
0.2600

x
x
x
x

20.50
20.50
20.50
20.50

4.10
3.07
3.48
5.33

0.0700

20.50

1.43

48.80

20.50

10.f. Pekerjaan Mengeter Kuda-kuda, Gording dan Kasau/Reng Kayu Lanan


Volume
- Luas
( 0.36 x ( 129.15 + 110.90 )) +
Bahan :
- Ter atau Residu
0.3500 x 111.62
Upah :
- Pekerja
11. PEKERJAAN SANITASI
11.a. Pekerjaan Memasang Closet Jongkok
Volume
- Jumlah
Bahan :
- Closet Jongkok Merk TERASSO
- Batu Bata 5 x 11 x 22 cm
- Semen PC
- Pasir Pasang
Upah :
- Tukang Batu
11.b. Memasang Bak Mandi dengan Volume 0.30 m
Volume
- Jumlah
Bahan :
- Bak Mandi Merk TERASO
- Semen PC
- Pasir Pasang
Upah :
- Tukang Batu

0.1000

111.62

25.21

111.62
39.07
11.16

1.00

1
1.0000
7.0000
6.0000
0.0100

x
x
x
x

1
1
1
1

1.00
7.00
6.00
0.01

1.5000

1.50

1.00

1
1.0000
6.0000
0.0100

x
x
x

1
1
1

1.00
6.00
0.01

0.7500

0.75

Catatn Bahan lain yang dibutuhkan :

- Pipa PVC 4"


- Pipa PVC 2"

12. PEKERJAAN KUNCI


12.a. Pekerjaan Memasang Kunci Tanam Biasa
Volume
- Jumlah Pintu P1, P2 & P3
Bahan :
- Kunci Tanam Biasa
Upah :
- Tukang Kayu

1
1

1.00
1.00

5.00

1.0000

5.00

0.5000

2.50

12.b. Pekerjaan Memasang Engsel Pintu


Volume
- Jumlah Pintu P1, P2 & P3
Bahan :
- Engsel Pintu
Upah :
- Tukang Kayu
12.c. Pekerjaan Memasang Engsel Jendela
Volume
Jumlah Daun Jendela J1
Bahan :
- Engsel kupu-kupu
Upah :
- Tukang Kayu

Tanggal Survey :

Halaman :

5.00

3.00

15.00

1.0000

15

15.00

0.1500

15

2.25

16.00

1.0000

16

16.00

0.1000

16

1.60

13

Dibuat Oleh :

Jenis Prasarana : Posyandu


Tipe Konstruksi : Bgn Kayu
Ukuran/Dimensi : 6.00 x 8.00 m
c

meter kubik

HOK

meter kubik

HOK

Buah
Buah
Buah
meter kubik
batang
Buah
meter panjang
Buah

meter panjang
Buah
meter kubik

meter kubik
meter kubik
Batang
Kilogram
HOK

meter kubik
meter kubik
Batang
Kilogram
HOK
HOK

meter kubik
meter kubik
Batang
Kilogram
HOK
HOK

meter kubik
meter kubik
Batang
Kilogram
HOK
meter kubik
meter kubik
Batang
Kilogram
HOK
meter kubik
meter kubik
Batang
Kilogram
HOK

meter kubik
meter kubik
Batang
Kilogram
HOK

meter kubik
meter kubik
Batang
Kilogram
HOK

meter kubik
meter kubik

meter kubik
meter kubik
meter kubik
meter kubik
meter kubik
Batang
Kilogram
Kilogram
HOK
HOK

meter kubik
meter kubik
meter kubik
meter kubik
Batang
Kilogram
HOK
HOK

meter kuadrat

meter kuadrat
meter kuadrat
meter kuadrat
meter kubik
Kilogram
HOK
HOK

meter panjang
meter kubik
Keping
Kilogram
HOK
HOK

meter kuadrat
meter kuadrat
Kilogram
HOK
HOK
meter panjang
meter panjang
Kilogram

meter panjang
Lembar
Kilogram
meter kubik
HOK

meter kuadrat
meter kubik
Keping
Kilogram
HOK

meter kuadrat
meter kubik
Keping
Kilogram
HOK

meter kuadrat

meter kuadrat
meter kubik
Keping
Kilogram
HOK

meter kuadrat
meter kubik
Keping
Kilogram
HOK
HOK

meter kuadrat
meter kubik
Keping
HOK
HOK

meter kuadrat
meter kubik
Keping
HOK
HOK

meter kuadrat
meter kubik
Keping
HOK
HOK

meter kuadrat
meter kuadrat
HOK
HOK

meter kuadrat
meter kubik
Kilogram
HOK
HOK

meter kuadrat
Lembar
Kilogram
HOK
HOK

meter panjang
meter panjang
Kilogram
HOK

meter kuadrat
Kilogram
Kilogram
Kilogram
HOK

meter kuadrat
Kilogram
Kilogram
Kilogram
HOK

meter kuadrat
Kilogram
Kilogram
Kilogram
Kilogram
HOK

meter kuadrat
Kilogram
Kilogram
Kilogram
HOK

meter kuadrat
Kilogram
Kilogram
Kilogram
Kilogram
HOK

meter kuadrat
Liter
HOK

Buah
Buah
Buah
Kilogram
meter kubik
HOK

Buah
Buah
Kilogram
meter kubik
HOK
Buah
Buah

Buah
Buah
HOK

Buah
Buah
HOK

Buah
Buah
HOK

RENCANA ANGGARAN BIAYA PRASARANA


Provinsi
Kabupaten
Kecamatan
Kelurahan

: Kalimantan Tengah
: Katingan
: Bukit Raya
: Rangan Bahekang

No. Rab
Kegiatan
Jenis Kegiatan
Tipe Konstruksi
Ukuran/Dimensi
Volume

URAIAN
1 BAHAN
1. Balok Kayu Ulin 10/10 cm - 4.00 m
2. Balok Kayu Ulin 5/10 cm - 4.00 m
3. Balok Kayu Ulin 5/7 cm - 4.00 m
4. Papan Kayu Ulin 2/20 cm - 4.00 m
5. Balok Kayu Lanan 6/12 cm - 4.00 m
6. Balok Kayu Lanan 5/7 cm - 4.00 m
7. Balok Kayu Lanan 5/5 cm - 4.00 m
8. Balok 5/7 cm - 4.00 m Ky Lanan Klas III - 4.00 m
9. Papan 2/20 cm - 4.00 m Ky Lanan Klas III - 4.00 m
10. Reng Kayu Lanan 3/5 cm - 4.00 m
11. Papan Kayu Lanan 2/20 cm - 4.00 m
12. Atap Multiroof
13. Bubungan Metal
14. Seng Plat BJLS 28
15. Playwood 3 mm
16. List Profil Plafond
17. Besi Strip/Baut-Mur
18. Paku Biasa 2"-5"
19. Paku Ulin 2"-5"
20. Paku Anti Karat
21. Paku Playwood
22. Kaca Bening 5 mm
23. Plamir
24. Cat Menie
25. Cat Dasar
26. Cat Penutup merk PLATON
27. Minyak Cat
28. Dempul
29. Batu Arang/Ampelas
30. Ter/Residu
31. Closet Jongkok merk TERASSO
32. Bak Mandi merk TERASSO
33. Pipa PVC 4"
34. Pipa PVC 2"
35. Batu Bata Merah 5 x 11 x 22 cm
36. Pasir Pasang
37. Semen PC
38. Kunci Tanam Biasa
39. Engsel Pintu
40. Engsel Jendela Kupu-kupu
41. SeptickTank

Total

Satuan
Dari
Dari
Swadaya PNPM-MP

63.00
134.00
8.00
174.00
60.00
22.00
97.00
34.00
17.00
51.00
169.00
210.00
27.00
4.00
30.00
141.00
17.00
39.00
32.00
2.00
2.50
19.00
19.50
9.00
28.00
66.00
0.50
2.00
0.50
39.00
1.00
1
1
1
7
0.02
12
5
15
16
1

63
134.00
8.00
174.00
60.00
22.00
97.00
34.00
17.00
51.00
169.00
210.00
27.00
4.00
30.00
141.00
17.00
39.00
32.00
2.00
2.50
19.00
19.50
9.00
28.00
66.00
0.50
2.00
0.50
39.00
1.00
1.00
1.00
1.00
7.00
0.02
12.00
5.00
15.00
16.00
1.00

Btg
Btg
Btg
Kpg
Btg
Btg
Btg
Btg
Kpg
Btg
Kpg
m
m'
Lbr
Lbr
m'
kg
kg
kg
kg
kg
m
kg
kg
kg
kg
kg
kg
kg
kg
bh
bh
bh
bh
bh
m
kg
set
set
set
unit

Kategori
Biaya
I.a
I.a
I.a
I.a
I.a
I.a
I.a
I.a
I.a
I.a
I.a
I.b
I.b
I.b
I.b
I.a
I.b
I.b
I.b
I.b
I.b
I.b
I.b
I.b
I.b
I.b
I.b
I.b
I.b
I.b
I.b
I.b
I.b
I.b
I.a
I.a
I.b
I.b
I.b
I.b
I.a

:
: Prasarana Kesehatan
: Posyandu
: Bangunan Kayu
: 6.00 x 8.00 meter
Harga Satuan
( Rp )
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

90,000.60,000.40,000.60,000.30,000.25,000.15,000.15,000.25,000.10,000.25,000.95,000.30,000.60,000.65,000.20,100.45,000.30,000.50,000.50,000.65,000.150,000.25,000.30,000.25,000.60,000.25,000.15,000.2,500.10,000.150,000.200,000.180,000.70,000.2,000.200,000.150,000.150,000.20,000.15,000.3,000,000.-

Jumlah Swadaya
( Rp )
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

Sub Total 1) Rp
2 ALAT
1. Cangkul
2. Sekop
3. Linggis
4. gergaji
5. Pahat
6. Ketam
7. Bor
8. Waterpass
9. Selang Waterpass
10. Meteran
11. Benang
12. Genset
13. Palu
14. Batu Asah
15. Kikir
16. Cetok
17. Papan Proyek

4
2
2
4
4
1
1
1
30
2
4
1
4
1
1
1
1

4
2
2
4
4
1
1
1
30
2
4
1
4
1
1
1
1

bh
bh
bh
bh
bh
Set
Set
bh
m'
bh
roll
unit
bh
set
set
set
Buah

II.a
II.a
II.a
II.a
II.a
II.b
II.b
II.b
II.b
II.b
II.b
II.b
II.b
II.b
II.b
II.b
II.c

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

45,000.46,000.50,000.50,000.25,000.350,000.250,000.45,000.6,000.20,000.5,000.400,000.45,000.95,000.67,250.80,000.200,000.-

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Sub Total 2) Rp.

Jumlah PNPM
( Rp )
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

5,670,000.8,040,000.320,000.10,440,000.1,800,000.550,000.1,455,000.510,000.425,000.510,000.4,225,000.19,950,000.810,000.240,000.1,950,000.2,834,100.765,000.1,170,000.1,600,000.100,000.162,500.2,850,000.487,500.270,000.700,000.3,960,000.7,700.30,000.1,250.390,000.150,000.200,000.180,000.70,000.14,000.4,000.1,800,000.750,000.300,000.240,000.3,000,000.-

- Rp.

78,931,050.-

180,000.92,000.100,000.200,000.100,000.350,000.250,000.45,000.180,000.40,000.20,000.400,000.180,000.95,000.67,250.80,000.200,000.-

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

2,579,250.- Rp

3 UPAH
1.
3.

0
0

60
150

60
150

HOK
HOK

Sumber Dana

III.a
III.a

Rp.
Rp.

90,000.- Rp
70,000.- Rp

- Rp.
- Rp.

5,400,000.10,500,000.-

Sub Total 3) Rp

- Rp.

15,900,000.-

Total Biaya (PNPM MP + Swadaya)

Rp.

97,410,300.-

Total Biaya PNPM MP

Rp.

94,831,050.-

Total Biaya Swadaya

Rp.

2,579,250.-

Catatan :
Sumbangan lahan tidak dimasukkan RAB tetapi dilaporkan dengan form. 6a, 6b dan 6c
Sumbangan dalam bentuk bahan upah dan alat, ditulis dalam kolom Volume dari Swadaya
Operasional TPK dilaporkan pada form Rekapitulasi
Kategori Biaya
I-a Pembelian bahan hasil tenaga manusia
I-b Pembelian bahan hasil industri
II-a Pembelian alat tangan
II-b Pembelian / penyewaan alat mesin
III-a Pembayaran tenaga kerja untuk konstruksi
III-b Pembayaran tenaga untuk pengumpulan bahan

Diketahui Oleh :
PjOK Kec. Bukit Raya

EBIT THEOPILUS, SH.

Diperiksa Oleh :
FT Kec. Bukit Raya

YUPARNADI, Amd.

Dibuat Oleh :
Ketua TPK Penda Nange

..

RENCANA ANGGARAN BIAYA SUMBER DANA DARI SWADAYA MASYARAKAT


Propinsi
Kabupaten
Kecamatan
Desa

: Kalimantan Tengah
: Kotawaringin Timur
: Mentaya Hulu
: Rangan Bahekang

URAIAN

A. BAHAN
1. Balok Kayu Ulin 10/10 cm - 4.00 m
2. Balok Kayu Ulin 5/10 cm - 4.00 m
3. Balok Kayu Ulin 5/7 cm - 4.00 m
4. Papan Kayu Ulin 2/20 cm - 4.00 m
5. Balok Kayu Lanan 6/12 cm - 4.00 m
6. Balok Kayu Lanan 5/7 cm - 4.00 m
7. Balok Kayu Lanan 5/5 cm - 4.00 m
8. Balok 5/7 cm - 4.00 m Ky Lanan Klas III - 4.00 m
9. Papan 2/20 cm - 4.00 m Ky Lanan Klas III - 4.00 m
10. Reng Kayu Lanan 3/5 cm - 4.00 m
11. Papan Kayu Lanan 2/20 cm - 4.00 m
12. Atap Multiroof
13. Bubungan Metal
14. Seng Plat BJLS 28
15. Playwood 3 mm
16. List Profil Plafond
17. Besi Strip/Baut-Mur
18. Paku Biasa 2"-5"
19. Paku Ulin 2"-5"
20. Paku Anti Karat
21. Paku Playwood
22. Kaca Bening 5 mm
23. Plamir
24. Cat Menie
25. Cat Dasar
26. Cat Penutup merk PLATON
27. Minyak Cat
28. Dempul
29. Batu Arang/Ampelas
30. Ter/Residu
31. Closet Jongkok merk TERASSO
32. Bak Mandi merk TERASSO
33. Pipa PVC 4"
34. Pipa PVC 2"
35. Batu Bata Merah 5 x 11 x 22 cm
36. Pasir Pasang
37. Semen PC
38. Kunci Tanam Biasa
39. Engsel Pintu
40. Engsel Jendela Kupu-kupu
41. SeptickTank

No. Rab
Kegiatan
Jenis Kegiatan
Tipe Konstruksi
Ukuran/Dimensi
Nilai Swadaya
Selain
Uang RP.
h=dxg

:
: Prasarana Kesehatan
: Posyandu
: Bangunan Kayu
: 6.00 x 8.00 meter
Nilai Swadaya
Jumlah
Uang
Total
RP
( RP )
I=exg
j=h+i
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

Total
Volume
a

Volume
PNPM-MP
b=a-c

VOLUME
Volume
Swadaya
c=d+e

Swadaya
Selain Uang
d

Swadaya
Uang
e

Satuan
f

Harga
Satuan
( RP )
g

63.00
134.00
8.00
174.00
60.00
22.00
97.00
34.00
17.00
51.00
169.00
210.00
27.00
4.00
30.00
141.00
17.00
39.00
32.00
2.00
2.50
19.00
19.50
9.00
28.00
66.00
0.50
2.00
0.50
39.00
1.00
1.00
1.00
1.00
7.00
0.02
12.00
5.00
15.00
16.00
1.00

63.00
134.00
8.00
174.00
60.00
22.00
97.00
34.00
17.00
51.00
169.00
210.00
27.00
4.00
30.00
141.00
17.00
39.00
32.00
2.00
2.50
19.00
19.50
9.00
28.00
66.00
0.50
2.00
0.50
39.00
1.00
1.00
1.00
1.00
7.00
0.02
12.00
5.00
15.00
16.00
1.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Btg
Btg
Btg
Kpg
Btg
Btg
Btg
Btg
Kpg
Btg
Kpg
m
m'
Lbr
Lbr
m'
kg
kg
kg
kg
kg
m
kg
kg
kg
kg
kg
kg
kg
kg
bh
bh
bh
bh
bh
m
kg
set
set
set
unit

Rp.
90,000.Rp.
60,000.Rp.
40,000.Rp.
60,000.Rp.
30,000.Rp.
25,000.Rp.
15,000.Rp.
15,000.Rp.
25,000.Rp.
10,000.Rp.
25,000.Rp.
95,000.Rp.
30,000.Rp.
60,000.Rp.
65,000.Rp.
20,100.Rp.
45,000.Rp.
30,000.Rp.
50,000.Rp.
50,000.Rp.
65,000.Rp. 150,000.Rp.
25,000.Rp.
30,000.Rp.
25,000.Rp.
60,000.Rp.
25,000.Rp.
15,000.Rp.
2,500.Rp.
10,000.Rp. 150,000.Rp. 200,000.Rp. 180,000.Rp.
70,000.Rp.
2,000.Rp. 200,000.Rp. 150,000.Rp. 150,000.Rp.
20,000.Rp.
15,000.Rp. 3,000,000.-

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

Sub Total 1 )

Rp

- Rp

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

- Rp

B. ALAT
1. Cangkul
2. Sekop
3. Linggis
4. gergaji
5. Pahat
6. Ketam
7. Bor
8. Waterpass
9. Selang Waterpass
10. Meteran
11. Benang
12. Genset
13. Palu
14. Batu Asah
15. Kikir
16. Cetok
17. Papan Proyek

4
2
2
4
4
1
1
1
30
2
4
1
4
1
1
1
1

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

4
2
2
4
4
1
1
1
30
2
4
1
4
1
1
1
1

4
2
2
4
4
1
1
1
30
2
4
1
4
1
1
1
1

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

bh
bh
bh
bh
bh
Set
Set
bh
m'
bh
roll
unit
bh
set
set
set
Buah

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

45,000.46,000.50,000.50,000.25,000.350,000.250,000.45,000.6,000.20,000.5,000.400,000.45,000.95,000.67,250.80,000.200,000.-

Sub Total 2 )
C. UPAH
1.
2.
3.
4.
5.

0
0
#REF!
0
0

0.00
60.00
#REF!
0.00
150.00

0.00
60.00
#REF!
0.00
150.00

0
0
#REF!
0
0

0
0
#REF!
0
0

0
0
0
0
0

HOK
HOK
#REF!
HOK
HOK

Rp.
Rp.

Diketahui Oleh :
PjOK Kec. Bukit Raya

EBIT THEOPILUS, SH.


0

YUPARNADI, Amd.

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

Rp. 1,222,000.- Rp

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

180,000.92,000.100,000.200,000.100,000.350,000.250,000.45,000.180,000.40,000.20,000.400,000.180,000.95,000.67,250.80,000.200,000.-

- Rp. 2,579,250.-

- Rp
- Rp

- Rp
- Rp
#REF!
#REF!

- Rp

..

#REF!
#REF!

- Rp

#REF!
#REF!
TOTAL BIAYA SWADAYA
Swadaya Selain Uang
Swadaya Uang

Kuala Kuayan, .. Oktuber 2009


Dibuat Oleh :
Ketua TPK Penda Nange

Diperiksa Oleh :
FT Kec. Bukit Raya

180,000.92,000.100,000.200,000.100,000.350,000.250,000.45,000.180,000.40,000.20,000.400,000.180,000.95,000.67,250.80,000.200,000.-

90,000.- Rp
90,000.- Rp
#REF!
#REF!
#REF!
#REF!
Rp.
70,000.- Rp
Sub Total 3 )

Sumber Dana

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

#REF!
#REF!
#REF!
#REF!

REKAPITULASI ANGGARAN BIAYA PRASARANA


Propinsi
Kabupaten
Kecamatan
Desa

NO

I
II
III
IV
V

No.
program
Kegiatan
Jenis Kegiatan

: Kalteng
: Kotim
: Mentaya Hulu
: Rangan Bahekang

URAIAN

BAHAN
(Tidak perlu dirinci)
PERALATAN
(Tidak perlu dirinci)
UPAH
(Tidak perlu dirinci)
Jumlah
Operasional UPK 2%
Operasional TPK 3%
Jumlah Total
Jumlah Biaya Upah
Jumlah HOK Konstruksi

Tipe Kostruksi
Ukuran
Jumlah
No. RAB
PNPM

Tipe Kostruksi
Ukuran
Bobot%
Jumlah
:
No. RAB
PNPM
Swadaya

: Bangunan Kayu
: 6.00 x 8.00 meter
: 1 Unit
:

Swadaya

Bobot%

JUMLAH TOTAL

Swadaya

PNPM

Rp.

78,931,050.- Rp

80

Rp.

Rp

- Rp.

2,579,250.-

Rp

Swadaya

78,931,050.- Rp

- Rp. 2,579,250.-

Rp.

15,900,000.-

#REF!

16

Rp.

15,900,000.-

#REF!

Rp.
Rp.
Rp.
Rp.
Rp.

94,831,050.1,432,600.2,149,000.98,412,650.15,900,000.#REF!

#REF!

96
1
2
100

Rp.
Rp.
Rp.
Rp.
Rp.

94,831,050.1,432,600.2,149,000.98,412,650.15,900,000.#REF!

#REF!

#REF!
#REF!
0

HOK

Diketahui Oleh :
PjOK Kec. Bukit Raya

Kegiatan
Ukuran
Bobot%
Jumlah
No. RAB
PNPM

:
: PNPM-MP TA. 2008
: Prasarana Kesehatan
: Posyandu

EBIT THEOPILUS, SH.


0

HOK

Kuala Kuayan, .. Oktuber 2009


Dibuat Oleh :
Ketua TPK Penda Nange

Diperiksa Oleh :
FT Kec. Bukit Raya

Catatan : kolom swadaya diisi nilai swadaya dalam bentuk uang

YUPARNADI, Amd.

#REF!
#REF!
0

..

Form.8.b

NGGARAN BIAYA PRASARANA

Bobot%

80
0
16
96
1
2
100
HOK
Kuala Kuayan, .. Oktuber 2009
Dibuat Oleh :
Ketua TPK Penda Nange

..