You are on page 1of 20

DISCOVERY ENERGY SERVICES S.A.

DRILLING & WORKOVER RIGS


Premio nacional de Seguridad CRUZ BLANCA Categora Avanzada (2010-2011)

OUR RIG FLEET

RIG Discovery-6
SPECIFICATIONS
Brand: Loadcraft LCI 550

Mast: 104 ft, 250.000 lbs


Nom. Capacity SHL: 250.000 lbs

Double Drum.
Engine: CAT C-15 - 550 HP. Mud pump: SENTRY 530 HP 14ft Substructure & Rotary Included. System

Disponible en Noviembre 2012

RIG Discovery-6

RIG Discovery-5
SPECIFICATIONS
-Brand: Loadcraft LCI 550

-Mast: 104 ft, 250.000 lbs


-Nom. Capacity SHL: 250.000 lbs

Double Drum.
Engine: CAT C-15 - 550 HP. -Mud pump: Gardner Denver 450 HP 14ft Substructure & Rotary Included. System

Empresa Actual:

RIG Discovery-5

RIG Discovery-4

SPECIFICATIONS
Ref: Taylor 500 HP Mast: 96 ft, 205.000 lbs

Nom. Capacity SHL: 205.000 lbs


Double Drum. Engine: CAT C-15 - 500 HP. Mud pump: DOWELL PD-08 500HP 14ft Substructure System Included. & Rotary

Empresa Actual:

RIG Discovery-4

RIG Discovery-4

RIG Discovery-3
SPECIFICATIONS
Brand: Loadcraft LCI 550C Mast: 104 ft, 250.000 lbs

Nom. Capacity SHL: 250.000 lbs


Double Drum. Engine: CAT C-15 - 550 HP. Mud pump: SENTRY 500 HP 14ft Substructure System Included. & Rotary
Asignado a:

RIG Discovery-3
RIG In operations with Ramshorn International Limited, C&C Energy & VETRA, 2011

RIG Discovery-3

RIG Discovery-2 SPECIFICATIONS


Brand: Wilson Mogul 42B D/D550 Mast: 96 ft, 250.000 lbs. Nom. Capacity SHL: 250.000 lbs. Double Drum. Engine: CAT 3406 - 550 HP. Mud pump: Gardner Denver 450 HP 14ft Substructure System Included. & Rotary
Empresa Actual: Desde el ao 2010 hasta Enero 2013

RIG Discovery-2

RIG Discovery-2

RIG Discovery-1

SPECIFICATIONS
-Brand: Cardwell K200C400 HP -Mast: 96 ft, 250.000 lbs -Nom. Capac. SHL: 180.000 lbs Double Drum. -Engine: CAT 3406 - 450 HP. -Mud pump:Gardner Denver 450 HP

-12 ft Substructure System Included

&

Rotary

Contrato por el el 2012 con:

RIG Discovery-1
RIG Discovery -1 In operations - Petrleos del Norte S.A. & PERENCO y CEDCO

OUR MAIN CLIENTS & CONTRACTS


COMPLETION CAMPAIGNS WITH RIGS DISCOVERY 2 ,3 AND 4, 2010, 2011 & 2012 CASANARE
WELL SERVICE AND WORKOVER CONTRACT WITH RIGS DISCOVERY 1 AND 4, 2010 2012 CASANARE/CESAR

Parex Resources Ltd.

Emerald Energy Plc.

Petrobras Colombia Ltd.

WORKOVER CONTRACT WITH RIG DISCOVERY 5, 2012 CASANARE

Occidental de Colombia Inc.


WORKOVER CAMPAIGN BALLENAS LAND WELLS, WITH RIG DISCOVERY-3, 2012 LA GUAJIRA

WELL ABANDONMENT TURNKEY CONTRACT WITH RIG DISCOVERY-1, 2011, CASANARE

Pacific Rubiales Corp.


Chevron Petroleum Company

WORKOVER WITH RIG DISCOVERY 2 2009, ANTIOQUIA

OUR MAIN CLIENTS & CONTRACTS


WORKOVER CONTRACT WITH RIG DISCOVERY 3 and 5 2011-2012, CASANARE COMPLETIONS CAMPAIGN WITH RIG DISCOVERY 3, 2012, CASANARE

Quetzal Energy

P1 Energy Corp.

Hupecol Operating Co. LLC.

WORKOVER AND WELL SERVICE CAMPAIGN WITH RIG DISCOVERY 1, 2009, CASANARE

NGECNew Granada Energy Corp.

WORKOVER AND WELL SERVICE CAMPAIGNS WITH RIGS DISCOVERY 1 and 4, 2011-2012, CASANARE

CEDCO

WORKOVER AND WELL SERVICE CAMPAIGN WITH RIGS DISCOVERY 1 AND 4, 2010, 2011 and 2012 CASANARE

Perenco Colombia Limited

WORKOVER AND WELL SERVICE CAMPAIGN WITH RIGS DISCOVERY 1 and 4 , 2010 and 2012 CASANARE

Ramshorn Intenational Limited

COMPLETION CAMPAIGNS WITH RIGS DISCOVERY 2, 3 and 5, 2010, 2011 2012, CASANARE

C&C Energy

COMPLETIONS AND WORKOVER CAMPAIGN WITH RIG DISCOVERY 3 and DISCOVERY 4, 2011, CASANARE

Petrleos del Norte S.A.

WORKOVER AND WELL SERVICE CAMPAIGN WITH RIG DISCOVERY 1, 2010 2011, CESAR DRILLING/COMPLETION CAMPAIGN ARJONA and Suroriente WELLS, WITH RIG DISCOVERY-3, 2011 2012 CESAR and PUTUMAYO

Schlumberger IPM

DRILLING CAMPAIGN STRATIGRAPHIC WELLS, 2010 2011, VICHADA. (Cancelled).

VETRA EXPLORACION Y PRODUCCION

DISCOVERY ENERGY SERVICES S.A. Premio nacional de seguridad CRUZ BLANCA

You might also like