Professional Documents
Culture Documents
Bit Hydraulic e CD Calculator
Bit Hydraulic e CD Calculator
HOUSTON, TEXAS
WELL GEOMETRY
SEC 1
Length, ft? = Hole Size, in? = Pipe OD, in? = Pipe ID, in? =
CONDITIONS
3 Number of Jets in 1st Set? = 14 Size 1st Set of Jets, 32nds? = Number of Jets in 2nd Set? = Size 2nd Set of Jets, 32nds? = Reynolds Number 4,000 PSI Drop MWD, Mud Motor? = 90 Bit TVD, ft? = 12,401 Mud Weight, ppg? = 11.6 Plastic Viscosity? = 37.0 Yield Point? = 23
CALCULATIONS SEC 1
Liner Size, in? = Stroke Length, in? = Pump Rate, spm? = % Efficiency of Pump, (0 - 100)? = Rod Diameter, in? =
TRIPLEX, gpm
USER NOTES . . . .
5 10 91 95
220
5 12 91 95
265
A. Enter Well Geometry starting from top of hole in SEC 1 and continue to bit. B. Pump defaults to a TRIPLEX if Rod Size equals zero. SEC 2 SEC 3 SEC 4 SEC 5 SEC 6 SEC 7
Annular Velocity, fpm Critical Velocity, fpm Flow Type Annular Lag Times, minutes Drill Pipe Bore PSI Losses Annular PSI Losses
453 590
LAM
28 2509 1717
RESULTS - BIT HYDRAULICS and ECD
Total Pressure Losses for Sections Lag or Bottoms-Up Time Measured Depth Drill Bit ECD @ Bit Nozzle Area Surface Equipment Loss Bit Nozzle Pressure Drop
UPDATED MARCH 1995
Pump Pressure Nozzle Velocity Pump Hydraulic Horsepower Bit Hydraulic Horsepower Percent Horsepower @ Bit Bit HSI Impact Force
APPLICATION CREATED 1993