SYNOPSIS/ABSTRACT 4rd Review on 24/03/2012

We successfully completed all the five tasks given to us and we got the printout of all our templates for each and every machine and component separately then we were asked to display the templates in the machine at the appropriate places and study the rejection level of each machine after the operator started following our process parameters, operation standards and final inspection charts atlast we studied the rejection level and found it was reduced and operator side errors were reduced and we even got a good response from the operators and we were apppriciated by our project guide thus we concluded our project after getting the desired results.