Tcnicas Reunidas Gulf Co.

Ltd
Ju'aymah Gas Plant Expansion Project

Subcontractor : Mohammad Al Mojil Group


Subcontract No: 8396-ZA-M01-K BI-10-03193, Contract No.6600012800 (IK) Tcnicas Reunidas Gulf

WELDING PROCEDURE SPECIFICATION (WPS) REGISTRATION


Sl.No WPS No Welding Base Thickness Diameter Service Impact Hardness Electrode Code PWHT Process Material Range Range Temp Test Test
0

Piping Class
1CS2P,3CS2P, 1CS9P,3CS9P, 6CS9P 12LCOU 1CS2P,3CS2P, 1CS9P,3CS9P, 6CS9P 12CGOU 12LCOU 1CS2P,3CS2P, 1CS9P,3CS9P, 6CS9P 12LCOU

Fluid Service
Wet sour gas,HydrocorbonW/ H2S, Condensate W/H2S,Sour Flare Hydrocarbon, Boiled feed water, Steam condensate air Fire water, RAW & utilitywater Wet sour gas,HydrocorbonW/H2S, condensate W/H2S,Sour Flare Hydrocarbon, Boiled feed water, Steam condensate air Instrument Air, Nitrogen,Plant Air,Cooling Water Fire water, RAW & utilitywater Wet sour gas,HydrocorbonW/H2S, condensate W/H2S,Sour Flare Hydrocarbon, Boiled feed water, Steam condensate air Fire water, RAW & utilitywater

STATUS Date Approved

N ASME B31.3 N N N N

Y N N Y N N N Y N N Y Y Y Y Y N N Y N N Y

P01-001 Rev.M.0

GTAW

P1-P1

0.0625" 0.436"

All

ER-70S-2

-20 F 7500F

19-Jun-2006

P01-002 Rev.M.0

GTAW & SMAW

P1-P1

0.187" 0.750"

over 1" OD

ER-70S-2 & E7018

-200F 7500F

ASME B31.3

N N N N

19-Jun-2006

P01-009 Rev.M.1

GTAW & SMAW

P1-P1

0.187" 0.750"

over 1" OD

ER-70S-2 & E7018

-200F 7500F

N ASME B31.3 N N N N

19-Jun-2006

1CC9C4,3CC9C4 Caustic 1CS1P3,3CS1P3 3CS2P1 Hydrocarbon (Treated Propane) Lean-Amine(cool) Rich Amine 19-Jun-2006

P01-022 Rev.M.0

SMAW

P1-P1

0.188" 1.438"

over 2" OD

E6010 & E7018

-200F 6500F

ASME B31.3

N Y N N

P01-031 Rev.M.0

SMAW

P1-P1

0.187" 0.750" 0.422" 0.750" 0.190" 0.436"

Over 2" OD

E6010 & E7018 ER80SNi1 & E8018C3

-200F 750oF -50 F 6500F -500F 6500F


0

N ASME B31.3 N N N ASME B31.3 Y N Y Y N Y

1CS9P1,3CS9P1 Hydrocarbon Wet sour gas,HydrocorbonW/ H2S, 1CS2P,3CS2P, Condensate W/H2S,Sour Flare 1CS9P,3CS9P, Hydrocarbon, Boiled feed water, 6CS9P Steam condensate air 12LCOU Fire water, RAW & utilitywater 1CA2P 1CA9P,3CA2P, 3CA9P 1CA9P,3CA2P, 3CA9P 1CA2P Wet sour gas,HydrocorbonW/H2S, condensate W/H2S Low temp. Low Temp. Hydrocarbon, NGL, LPG Low Temp. Hydrocarbon, NGL, LPG Wet sour gas,HydrocorbonW/H2S, condensate W/H2S Low temp.

19-Jun-2006

P01-036 Rev.M.0

GTAW & SMAW

P1-P1

over 1" OD

15-Jun-2006

P01-037 Rev.M0

GTAW

P1-P1

All

ER80SNi1

ASME B31.3

15-Jun-2006

Page 1 of 14

Tcnicas Reunidas Gulf Co. Ltd


Ju'aymah Gas Plant Expansion Project

Subcontractor : Mohammad Al Mojil Group


Subcontract No: 8396-ZA-M01-K BI-10-03193, Contract No.6600012800 (IK) Tcnicas Reunidas Gulf

WELDING PROCEDURE SPECIFICATION (WPS) REGISTRATION


Sl.No WPS No Welding Base Thickness Diameter Service Impact Hardness Electrode Code PWHT Process Material Range Range Temp Test Test
N 8 P01-044 Rev.M0 GTAW & SAW P1-P1 0.187" 0.750" over 1" OD ER70S-2 & EM12K -20 F 750oF
0

Piping Class

Fluid Service
Wet sour gas,HydrocorbonW/ H2S, Condensate W/H2S,Sour Flare Hydrocarbon, Boiled feed water, Steam condensate air Fire water, RAW & utilitywater

STATUS Date Approved

Y N N Y Y Y Y Y Y Y N Y N N Y N N Y N

1CS2P,3CS2P, 1CS9P,3CS9P, 6CS9P 12LCOU

ASME B31.3

N N N N

15-Jun-2006

1CC9C4,3CC9C4 Caustic 1CS1P3,3CS1P3 1CS2P1 Hydrocarbon (Treated Propane) Lean-Amine(cool) Sour Hydrocarbon 15-Jun-2006

P01-045 Rev.M0

GTAW & SMAW

P1-P1

0.188" 2.212"

over 1" OD

ER70S-2 & E7018

-200F 6500F

N ASME B31.3 Y N N N N

3CS2P1,1CS2P2 Rich Amine 1CS4P,3CS2P2 NACE

1CS9P1,3CS9P1 Hydrocarbon 6CS9P 1CS9P,3CS9P, 6CS9P 1CS2P,3CS2P, 12LCOU 1CS9P,3CS9P, 6CS9P 1CS2P,3CS2P, 12LCOU 1CS9P,3CS9P, 6CS9P 1CS2P,3CS2P, 12LCOU Hydrocarbon, Boiled feed water, Steam condensate air Hydrocarbon, Boiled feed water, Steam condensate air Wet sour gas,HydrocorbonW/ H2S, Condensate W/H2S,Sour Flare Fire water, RAW & utilitywater Hydrocarbon, Boiled feed water, Steam condensate air Wet sour gas,HydrocorbonW/ H2S, Condensate W/H2S,Sour Flare Fire water, RAW & utilitywater Hydrocarbon, Boiled feed water, Steam condensate air Wet sour gas,HydrocorbonW/ H2S, Condensate W/H2S,Sour Flare Fire water, RAW & utilitywater 15-Jun-2006 15-Jun-2006

10

P01-046 Rev.M0

SMAW & SAW

P1-P1

0.187" 0.750"

Over 2" OD

E6010 & EM12K

-20 F 750oF

N ASME B31.3 N N N

11

P01-048 Rev.M0

GMAW & SAW

P1-P1

0.187" 0.750"

Over 2" OD

ER70S-3 & EM12K

-200F 750oF

N ASME B31.3 N N N N

15-Jun-2006

12

P01-061 Rev.M0

GTAW & FCAW

P1-P1

0.187" 0.750"

over 1" OD

ER70S-2 & E71T-1

-20 F 750oF

ASME B31.3

N Page 2 of 14

Tcnicas Reunidas Gulf Co. Ltd


Ju'aymah Gas Plant Expansion Project

Subcontractor : Mohammad Al Mojil Group


Subcontract No: 8396-ZA-M01-K BI-10-03193, Contract No.6600012800 (IK) Tcnicas Reunidas Gulf

WELDING PROCEDURE SPECIFICATION (WPS) REGISTRATION


Sl.No WPS No Welding Base Thickness Diameter Service Impact Hardness Electrode Code PWHT Process Material Range Range Temp Test Test
N N P01-065 Rev.M0 GTAW & SMAW & SAW 0.187" 1.876" over 1" OD ER70S-2 & E7018 & EM12K -200F 6500F N ASME B31.3 Y N N N N SMAW & FCAW 0.187" 0.750" E6010 & E71T-1 -200F 750oF N ASME B31.3 N N N -200F 750oF N ASME B31.3 N N N N N P01-069 Rev.M0 0.0625" 0.436" -200F 6500F ASME B31.3 N Y N N N 17 P01-078 Rev.M0 GTAW P1-P1 0.109" 0.436" All -500F ER80S-Ni1 6500F ASME B31.3 Y Y Y Y 1CA9C4,3CA9C4 Low Temp. caustic Y Y Y Y 1CS2P1 3CS2P1 1CS4P Y Y Y Y Y Y Y Y Y N Y N N Y N

Piping Class
1CC9C4,3CC9C4 Caustic 1CS1P3,3CS1P3 1CS2P1 3CS2P1 1CS2P2 3CS4P

Fluid Service

STATUS Date Approved

Hydrocarbon (Treated Propane) Lean-Amine(cool) Sour Hydrocarbon Rich Amine Amina, Rich&Hot Lean Rich DUA 15-Jun-2006

13

P1-P1

1CS9P1,3CS9P1 Hydrocarbons 1CS9P,3CS9P, 6CS9P 1CS2P,3CS2P, 12LCOU 1CS9P,3CS9P, 6CS9P 1CS2P,3CS2P, 12LCOU Hydrocarbon, Boiled feed water, Steam condensate air Wet sour gas,HydrocorbonW/ H2S, Condensate W/H2S,Sour Flare Fire water, RAW & utilitywater Hydrocarbon, Boiled feed water, Steam condensate air Wet sour gas,HydrocorbonW/ H2S, Condensate W/H2S,Sour Flare Fire water, RAW & utilitywater 15-Jun-2006 15-Jun-2006

14

P01-066 Rev.M0

P1-P1

Over 2" OD

15

P01-067 Rev.M0

SMAW & FCAW

P1-P1

0.187" 0.750"

Over 2" OD

E6010 & E71T-11

1CS9P1,3CS9P1 Hydrocarbon 1CC9C4,3CC9C4 Caustic 1CS1P3,3CS1P3 Hydrocarbon (Treated Propane) Lean-Amine(cool) Sour Hydrocarbon Rich Amine NACE 19-Jun-2006

16

GTAW

P1-P1

All

ER70S-2

15-Jun-2006

1CA2P1,3CA2P1 Sour water

Page 3 of 14

Tcnicas Reunidas Gulf Co. Ltd


Ju'aymah Gas Plant Expansion Project

Subcontractor : Mohammad Al Mojil Group


Subcontract No: 8396-ZA-M01-K BI-10-03193, Contract No.6600012800 (IK) Tcnicas Reunidas Gulf

WELDING PROCEDURE SPECIFICATION (WPS) REGISTRATION


Sl.No WPS No
P01-080 Rev.M0

Welding Base Thickness Diameter Service Impact Hardness Electrode Code PWHT Process Material Range Range Temp Test Test
GTAW & SMAW GTAW & FCAW P1-P1 0.280" 0.560" 0.187" 0.750" over 1" OD ER80SNi1 & E8018C3 ER70S-2 & E71T-11 -500F 6500F -200F 750oF ASME B31.3 Y Y Y N ASME B31.3 N N N GMAW (STT) & SMAW -200F 750oF N ASME B31.3 N N N -200F 750oF N ASME B31.3 N N N GMAW (STT) & SAW -200F 750oF N ASME B31.3 N N N
0

Piping Class
1CA2P1,3CA2P1 Sour water

Fluid Service

STATUS Date Approved


19-Jun-2006

Y Y N Y N N Y N N Y N N Y N N Y N N N

18

1CA9C4,3CA9C4 Low Temp. caustic 1CS9P,3CS9P, 6CS9P 1CS2P,3CS2P, 12LCOU 1CS9P,3CS9P, 6CS9P 1CS2P,3CS2P, 12LCOU 1CS9P,3CS9P, 6CS9P 1CS2P,3CS2P, 12LCOU 1CS9P,3CS9P, 6CS9P 1CS2P,3CS2P, 12LCOU 1CS9P,3CS9P, 6CS9P 1CS2P,3CS2P, 12LCOU 1CS9P,3CS9P, 6CS9P 12LCOU Hydrocarbon, Boiled feed water, Steam condensate air Wet sour gas,HydrocorbonW/ H2S, Condensate W/H2S,Sour Flare Fire water, RAW & utilitywater Hydrocarbon, Boiled feed water, Steam condensate air Wet sour gas,HydrocorbonW/ H2S, Condensate W/H2S,Sour Flare Fire water, RAW & utilitywater Hydrocarbon, Boiled feed water, Steam condensate air Wet sour gas,HydrocorbonW/ H2S, Condensate W/H2S,Sour Flare Fire water, RAW & utilitywater Hydrocarbon, Boiled feed water, Steam condensate air Wet sour gas,HydrocorbonW/ H2S, Condensate W/H2S,Sour Flare Fire water, RAW & utilitywater Hydrocarbon, Boiled feed water, Steam condensate air Wet sour gas,HydrocorbonW/ H2S, Condensate W/H2S,Sour Flare Fire water, RAW & utilitywater Hydrocarbon, Boiled feed water, Steam condensate air Fire water, RAW & utilitywater 15-Jun-2006 15-Jun-2006 15-Jun-2006 19-Jun-2006 15-Jun-2006

19

P01-081 Rev.M0

P1-P1

Over 1" OD

20

P01-088 Rev.M0

P1-P1

0.187" 0.864"

Over 1" OD

ER70S-6 & E7018

21

P01-089 Rev.M0

STT & FCAW

P1-P1

0.187" 0.750"

Over 1" OD

ER70S-6 & E71T-1

22

P01-091 Rev.M0

P1-P1

0.187" 0.750"

Over 2" OD

ER70S-6 & EM12K

N ASME B31.3 N N N

23

P01-092 Rev.M0

GTAW & SAW

P1-P1

0.187" 0.750"

Over 1" OD

ER70S-2 & EM12K

-20 F 750oF

24

P01-093 Rev.M0

GTAW & FCAW

P1-P1

0.187" 0.750"

Over 1" OD

ER70S-2 & E71T-1

-00F 750oF

ASME B31.3

N N N

15-Jun-2006

Page 4 of 14

Tcnicas Reunidas Gulf Co. Ltd


Ju'aymah Gas Plant Expansion Project

Subcontractor : Mohammad Al Mojil Group


Subcontract No: 8396-ZA-M01-K BI-10-03193, Contract No.6600012800 (IK) Tcnicas Reunidas Gulf

WELDING PROCEDURE SPECIFICATION (WPS) REGISTRATION


Sl.No WPS No Welding Base Thickness Diameter Service Impact Hardness Electrode Code PWHT Process Material Range Range Temp Test Test
GMAW (STT) & SAW GMAW (STT) & SAW GMAW (STT) & SMAW GTAW & SMAW -200F 6500F N ASME B31.3 Y N N 0.187" 0.729" Over 2" OD ER70S-6 & EM12K -200F 7500F ASME B31.3 N N N Y Y Y Y N

Piping Class
1CC9C4,3CC9C4 Caustic

Fluid Service

STATUS Date Approved

25

P01-095 Rev.M0

P1-P1

0.187" 2.000"

Over 2" OD

ER70S-6 & EM12K

1CS9P1,3CS9P1 Hydrocarbon 6CS9P 1CS9P,3CS9P, 6CS9P 1CS2P,3CS2P, Hydrocarbon, Boiled feed water, Steam condensate air Hydrocarbon, Boiled feed water, Steam condensate air Wet sour gas,HydrocorbonW/ H2S, Condensate W/H2S,Sour Flare

15-Jun-2006

26

P01-103 Rev.M3

P1-P1

15-Jun-2006

27

P01-116 Rev.2

P1-P1

0.187" 1.78"

Over 3" OD

ER70S-6 & E7018

-00F 6500F

ASME B31.3

1CS9P1,3CS9P1 Hydrocarbon Y N Y 6CS9P Hydrocarbon, Boiled feed water, Steam condensate air Low Temp.Hydrocarbon, NGL, LPG Sour water Low Temp.Caustic General process,Corrosive processs, Rich DUA, D.M water, Lube oil, Seal oil General process,Corrosive processs, Rich DUA, D.M water, Lube oil, Seal oil Waste Air,sea water, Misc.piping&drain,caustic, disulfide oil. Waste Air,sea water, Misc.piping&drain,caustic, disulfide oil. 27-Jul-06 27-Jul-06

28

P01-121 Rev.0

P1-P1

0.187" 2.06" 0.0625" 0.500"

Over 1" OD

ER80SNi1 & E8018C3 ER308L OR ER316L ER308L& E308L OR ER316L& E316L


ERNiCrMo-3

-500F 6500F -200F 7500F -200F 7500F -200F 3000F -200F 3000F

Y ASME B31.3 Y Y Y ASME B31.3 N N

Y Y Y Y

3CA2P,3CA9P 3CA2P1 3CA9C4 1SDOP

29

P08-001 Rev.M0

GTAW

P8-P8

All

12-Jul-06

30

P08-020 Rev.M0

GTAW & SMAW

P8-P8

0.118" - Over 1" 1.000" OD 0.062" 0.308" 0.062" 0.362"

ASME B31.3

1SDOP

12-Jul-06

31

P08-030 Rev.M0

GTAW

P8-P8

All

ASME B31.3

1SVOP

12-Jul-06

32

P08-031 Rev.M0

GTAW & SMAW

P8-P8

Over 1" OD

ERNiCr Mo-3 & ENiCrMo-3

ASME B31.3

1SVOP

13-Jul-06

Page 5 of 14

Tcnicas Reunidas Gulf Co. Ltd


Ju'aymah Gas Plant Expansion Project

Subcontractor : Mohammad Al Mojil Group


Subcontract No: 8396-ZA-M01-K BI-10-03193, Contract No.6600012800 (IK) Tcnicas Reunidas Gulf

WELDING PROCEDURE SPECIFICATION (WPS) REGISTRATION


Sl.No WPS No
P08-032 Rev.M0 P34-002 Rev.M1

Welding Base Thickness Diameter Service Impact Hardness Electrode Code PWHT Process Material Range Range Temp Test Test
GMAW (STT) GTAW P8-P8 0.0625" 0.500" 0.0625" 0.500" Over 1" OD 3" OD ER308L OR ER316L ERCuNi -200F 7500F 330F 1800F ASME B31.3 ASME B31.3 N N N

Piping Class

Fluid Service
General process,Corrosive processs, Rich DUA, D.M water, Lube oil, Seal oil Fire water, Storm Drain, Raw Water, OWS, utilitywater 4"below

STATUS Date Approved

33

1SDOP

13-Jul-06
16-Jul-06

34

P34-P34

12LCOU

Page 6 of 14

Reunidas Gulf

STATUS Report No

Rev.1 on 9/10/06

Page 7 of 14

Reunidas Gulf

STATUS Report No

Rev.1 on 9/5/06

Page 8 of 14

Reunidas Gulf

STATUS Report No

Rev.1 on 9/10/06

Page 9 of 14

Reunidas Gulf

STATUS Report No

Page 10 of 14

Reunidas Gulf

STATUS Report No
Rev.1 on 9/5/06

Rev.1 on 9/5/06

Page 11 of 14

Reunidas Gulf

STATUS Report No

Page 12 of 14

Tcnicas Reunidas Gulf Co. Ltd


Ju'aymah Gas Plant Expansion Project

Subcontractor : Mohammad Al Mojil Group


Subcontract No: 8396-ZA-M01-K BI-10-03193, Contract No.6600012800 (IK) Tcnicas Reunidas Gulf

WELDING PROCEDURE SPECIFICATION (WPS) REGISTRATION


Sl.No WPS No
P08-001 Rev.M0

Welding Base Thickness Diameter Service Impact Hardness Electrode Code PWHT Process Material Range Range Temp Test Test
GTAW P8-P8 0.0625" 0.500" All ER308L OR ER316L ER308L& E308L OR ER316L& E316L
ERNiCrMo-3

Piping Class

Fluid Service
General process,Corrosive processs, Rich DUA, D.M water, Lube oil, Seal oil General process,Corrosive processs, Rich DUA, D.M water, Lube oil, Seal oil Waste Air,sea water, Misc.piping&drain,caustic, disulfide oil. Waste Air,sea water, Misc.piping&drain,caustic, disulfide oil. General process,Corrosive processs, Rich DUA, D.M water, Lube oil, Seal oil

STATUS Date Approved

-200F 7500F -200F 7500F -200F 3000F -200F 3000F -200F 7500F 330F 1800F

ASME B31.3

1SDOP

12-Jul-06

P08-020 Rev.M0

GTAW & SMAW

P8-P8

0.118" - Over 1" 1.000" OD 0.062" 0.308" 0.062" 0.362" 0.0625" 0.500" 0.0625" 0.500"

ASME B31.3

1SDOP

12-Jul-06

P08-030 Rev.M0

GTAW

P8-P8

All

ASME B31.3

1SVOP

12-Jul-06

P08-031 Rev.M0

GTAW & SMAW GMAW (STT)

P8-P8

Over 1" OD

ERNiCr Mo-3 & ENiCrMo-3 ER308L OR ER316L

ASME B31.3

1SVOP

13-Jul-06

P08-032 Rev.M0

P8-P8

Over 1" OD

ASME B31.3

1SDOP

13-Jul-06

P34-002 Rev.M1

GTAW

P34-P34

3" OD

ERCuNi

ASME B31.3

12LCOU

Fire water, Storm Drain, Raw Water, OWS, utilitywater 4"below

16-Jul-06

Page 13 of 14

Reunidas Gulf

STATUS Report No

SS

SS

SS

SS

SS

CuNi

Page 14 of 14