1. Purpose/objective
Process description for the manufacture of transformer core within the tolerances which are laid down
4. Process sequence
Subprocess 1: Setting up the construction devices and limit stops
2. Scope/application
applies to all the core forms of the power transformers does not apply to the cores of compensating reactors Adjusting the construction supports
3. Process overview/description
Stack of core laminations dimensions checked by the supplier to ensure that they agree with the drawing Frame parts dimensions checked by the supplier to ensure that they agree with the drawing Insulating parts dimensions checked by the supplier (internal ore external )to ensure that they agree with the drawing washers, small accessories Job related core drawings Process report TPD 2.01.01
INPUT INPUT
Tools Assembly area with special support beams for xing the core laminations which have been put on into position Integrated slewing mechanism for mounting the nished core
MeasureMeasure ment
> Setting the middle distance of the support beams to one another in accordance with the drawing guideline > Tolerance +/5 mm to the desired size
> Setting the clearance of the support trestles (on the support beams) for the core-limb laminations Adjusting the support trestles > The position of support trestles are to be placed in the middle between the single bandages > The position and clearance of the bandages are dened in the core drawing
Completed core with clamping frame also completely mounted OUTPUT Process report TPD 2.01.02
Clearance support trestles The following clearances apply to cores without single bandages (e.g. wound bandage cylinders):
< 650 650 to 800 800 to 1,000 1,000 to 1,200 1,200 to 1,500
References/guidelines, recommendations Stack height tolerances as in drawing N00 08 792 Arrangement of the cooling duct shims as in drawing N10 11 100 Locking the screwed connections in accordance with TPD 3.036.01 Measurement of insulation resistance with TUQ 1634
Checked/approved:
Dr. Knorr
As of date:
2004-02
Drawn up by:
Matthes
Checked/approved:
Dr. Knorr
As of date:
2004-02
The passing on as well as the duplication of this document. use and communication of its contents is not permitted. nor may the contents be expressed. Offenders are liable to pay damages. All rights reserved. in particular for the case of patent granting or GM-entry
The passing on as well as the duplication of this document. use and communication of its contents is not permitted. nor may the contents be expressed. Offenders are liable to pay damages. All rights reserved. in particular for the case of patent granting or GM-entry
Plant 7*
Plant 13*
* Plant 7 & 13: new plants; ** Plant 14: 9 years 2001 2009 N = No. of units in service SY = No. of service years nF = No. of units failed FRe (%) = Failure rate = nF 100/SY MTBF (yrs) = Mean time between failures = 100/FRe FRe 0.5 % < 1.0 % < 1.5 % < FRe > 0.5 % FRe 1.0 % FRe 1.5 % FRe 2.0 % 2.0 % excellent good satisfactory acceptable not acceptable
237