B1 : 3.5x3.5M
Load from slab:
i.e. Shorter length lx= 3.5m
Triangular Load = wlx = 6.125x3.5 = 7.145 kn/m
3
3
Beam Load:
Load from slab
=
7.145 kn/m
Self wt of beam = 0.23x0.35x25 =
2.02kn/m
Self wt of wall = 0.23x2.75x20 =
12.65kn/m
21.815kn/m
B2 : 2x3.5M
Load from slab:
i.e. Shorter length lx= 2m
Triangular Load = wlx = 6.125x2 = 4.08 kn/m
3
3
Beam Load:
Load from slab
=
4.08kn/m
Self wt of beam = 0.23x0.35x25 =
2.02kn/m
Self wt of wall = 0.23x2.75x20 =
12.65kn/m
18.75kn/m
B3 : 3.5x3.5M
i.e. B3 = B1
B4 :
Load from slab S1: 3.5x3.5M
i.e. Shorter length lx= 3.5m
Triangular load
= wlx = 6.125
3
Load from slab S3: 3.5x2M
i.e. Shorter length lx= 2m
Trapezoidal Load = wlx 3 - lx
5.45kn/m
6
ly
Beam Load:
Load from slabs =7.145 + 5.45 =
Self wt of beam = 0.23x0.35x25 =
Self wt of wall = 0.23x2.75x20 =
x 3.5 = 7.145kn/m
3
= 6.125 x 2 3 6
3.5
12.6 kn/m
2.02kn/m
12.65kn/m
27.27kn/m
B5 :
Load from slab S2: 2x3.5M
i.e. Shorter length lx= 2m
Triangular load
= wlx = 6.125 x 2 = 4.08kn/m
3
3
Load from slab S4: 2x2M
i.e. Shorter length lx= 2m
Triangular load
= wlx = 6.125 x 2 = 4.08kn/m
3
3
Beam Load:
Load from slabs =2x4.08
= 8.16 kn/m
Self wt of beam = 0.23x0.35x25 =
2.02kn/m
Self wt of wall = 0.23x2.75x20 = 12.65kn/m
22.83kn/m
B6 = B4
B7 :
Load from slab S3: 3.5x2M
i.e. Shorter length lx= 2m
Trapezoidal Load = wlx 3 - lx = 6.125 x 2 3 2
5.45kn/m
6
ly
6
3.5
Load from slab S5: 3.5x4M
i.e. Shorter length lx= 3.5m
Triangular load
= wlx = 6.125 x 3.5 = 7.145kn/m
3
3
Beam Load:
Load from slabs = 5.45 + 7.145 = 12.6 kn/m
Self wt of beam = 0.23x0.35x25 =
2.02kn/m
Self wt of wall = 0.23x2.75x20 = 12.65kn/m
27.27kn/m
B8 :
Load from slab S4: 2x2M
i.e. Shorter length lx= 2m
Triangular load
= wlx = 6.125
3
Load from slab S5: 2x4M
i.e. Shorter length lx= 2m
Triangular load
= wlx = 6.125
3
Beam Load:
Load from slabs =2x4.08
=
Self wt of beam = 0.23x0.35x25 =
Self wt of wall = 0.23x2.75x20 =
x 2 = 4.08kn/m
3
8.16 kn/m
2.02kn/m
12.65kn/m
22.83kn/m
B9 = B7
B10 : 3.5x4M
Load from slab:
i.e. Shorter length lx= 3.5m
Triangular Load = wlx = 6.125x3.5 = 7.145 kn/m
3
3
Beam Load:
Load from slab
=
Self wt of beam = 0.23x0.35x25 =
Self wt of wall = 0.23x2.75x20 =
x 2 = 4.08kn/m
3
7.145 kn/m
2.02kn/m
12.65kn/m
21.815kn/m
B11 : 2x4M
Load from slab:
i.e. Shorter length lx= 2m
Triangular load
= wlx = 6.125 x 2 = 4.08kn/m
3
3
Beam Load:
4.08 kn/m
2.02kn/m
12.65kn/m
18.75kn/m
B12 = B10
B13 = B1
B14 :
Load from slab S1: 3.5x3.5M
i.e. Shorter length lx= 3.5m
Triangular load
= wlx = 6.125
3
Load from slab S2: 2x3.5M
i.e. Shorter length lx= 2m
Trapezoidal Load = wlx 3 - lx
5.45kn/m
6
ly
Beam Load:
Load from slabs =7.145 + 5.45 =
Self wt of beam = 0.23x0.35x25 =
Self wt of wall = 0.23x2.75x20 =
= 6.125 x 2 3 6
12.6 kn/m
2.02kn/m
12.65kn/m
27.27kn/m
B15 = B14
B16 = B1
B17 : 3.5x2M
Load from slab:
i.e. Shorter length lx= 2m
Triangular load
= wlx = 6.125 x 2 = 4.08kn/m
3
3
Beam Load:
Load from slabs
=
Self wt of beam = 0.23x0.35x25 =
Self wt of wall = 0.23x2.75x20 =
x 3.5 = 7.145kn/m
3
4.08 kn/m
2.02kn/m
12.65kn/m
18.75kn/m
B18 :
Load from slab S4: 2x2M
i.e. Shorter length lx= 2m
Triangular load
= wlx = 6.125 x 2 = 4.08kn/m
3.5
B21 : 3.5x4M
Load from slab:
i.e. Shorter length lx= 3.5m
Trapezoidal Load = wlx 3 - lx
7.98kn/m
6
ly
Beam Load:
Load from slabs
=
Self wt of beam = 0.23x0.35x25 =
Self wt of wall = 0.23x2.75x20 =
= 6.125 x 3.5 3 6
3.5
7.98 kn/m
2.02kn/m
12.65kn/m
22.65kn/m
B22 :
Load from slab S5: 3.5x4M
i.e. Shorter length lx= 3.5m
Trapezoidal Load = wlx 3 - lx = 6.125 x 3.5 3 - 3.5 =
7.98kn/m
6
ly
6
4
Load from slab S2: 2x4M
i.e. Shorter length lx= 2m
Trapezoidal Load = wlx 3 - lx = 6.125 x 2 3 2
=
5.45kn/m
6
ly
6
3.5
Beam Load:
Load from slabs = 7.98 + 5.45 = 13.43 kn/m
Self wt of beam = 0.23x0.35x25 =
2.02kn/m
Self wt of wall = 0.23x2.75x20 = 12.65kn/m
28.1 kn/m
B23 = B22
B24 = B21
column
beam
JOINT
MEMBER
B1A1
STIFFNESS
K = 4E(1.8I)
l
SUM
4E(1.8I) = 2.05EI
3.5
B1
DISTRIBUTION
FACTOR
0.363
5.65EI
B1C1
C1B1
4E(1.8I) = 3.6EI
2
0.637
4E(1.8I) = 3.6EI
2
0.637
C1
5.65EI
C1D1
4E(1.8I) = 2.05EI
3.5
0.363
K B1A1
= 2.05EI = 0.363
KB1A1 + KB1C1
5.65EI
12
12
M B1 A1 = + WL = +32.72(3.5) = +33.4
12
12
M B1 C1 = - WL = -28.125(2) = -9.38
12
12
M C1 B1 = + WL = +28.125(2) = +9.38
12
12
M C1 D1 = - WL = -32.72(3.5) = -33.4
12
12
M D1 C1 = + WL = +32.72(3.5) = +33.4
12
12
JOINT
Member
Distributio
n
Factor
Fixed End
Moment
Balance
Carry
Over
Balance
Carry
Over
Balance
A1
B1
C1
D1
A1B1
B1A1
B1C1
C1A1
C1D1
D1C1
0.363
0.637
0.637
0.363
-33.4
+33.4
-9.38
+9.38
-33.4
+33.4
-8.72
-15.3
+15.3
+8.72
-4.36
7.65
-7.65
4.36
-2.78
-4.87
+4.87
+2.78
-1.39
2.44
-2.44
1.39
-0.89
-1.55
1.55
+0.89
JOINT A1 :------ A1 B1
A1 B1 = -33.4-4.36-1.39 = -39.15
39.15
DESIGN OF FOUNDATION:
Depth Of Footing:
The critical section for B.M. is taken:
B.M = 1 x P0 x B (B - b)
8
= 1 X 398.89 X 1.5 X (1.5 0.23)
8
= 120.63 kn.m
B.M = 0.138 x fck x b x d
120.63 x 106 = 0.138 x 20 x 1500 x d
d = 170.25 mm
Increase depth by more than its double to take both one way and
two way shear.
Hence d=400 mm
Steel received parallel to longer direction:
B.M. = 0.87 x fy x Ast
d - fy x Asty
fck
b
Spacing:
Assume 12mm dia bars
Provide 12mm dia bars @ a spacing = 1500x /4 x < 300mm
Ast
= 1500x /4 x 12
861.23
= 196.98 mm~ 197 mm <
300mm
2
Vu = 398.89 x 1.5 1.5 0.23 0.4
2
Vu = 140.65 KN
Tv = Vu = 140.65 x 103 = 0.234 N/mm2
b.d
1500 x 400
From IS 456:2000
Tc = 0.28 N/mm2
K=1
Since Tv < K x Tc , It is Safe.
DESIGN OF COLUMNS:
Size of the column = 230 x 450mm
Concrete used is M20 and steel used is Fe415
The column is subjected to a factored load of:
Pv = 897.52 KN (CB3 - Greater load over column)
Assume Asc = 1%Ag = 0.01 Ag
i.e. Ac = 0.99 Ag
Pv
= 0.4 x fck x Ac + 0.67x fy x Asc
3
897.58 x 10 = 0.4x 20 x 0.99 Ag + 0.67 x 415 x 0.01 Ag
Ag = 83.88 x 103 mm2
Asc = 0.01 Ag = 0.01 x 83.88 x 103 =838.8 mm2
Longitudinal Reinforcement:
Assume 16mm bars
No: of bars = Asc
=
838.8
/4
( )
/4
(16)
= 6nos
Greater of the
DESIGN OF SLABS:
i.
Design Of Reinforcement:
Reinforcement for middle strip along with shorter direction.
Mx = 0.87 x fy x Ast
d fy x Astx
fck
b
Spacing:
Assume 8mm bars.
Spacing = 1000 x /4 x () < 450mm
Ast
= 1000 x /4 x (8) = 324.29 < 450mm
155
Hence provide 8mm bars 325mm c/c as torsion reinforcement.
SLAB (S5) :
Slab Size = 3.5m x 4m.
Effective Span lx = 3.5+ d = 3.5 + 0.105 = 3.605m
= 3.5+ bw = 3.5 + 0.23 = 3.73m
i.e. lx = 3.605m
Effective Span ly = 4+ d = 4 + 0.105 = 4.105m
= 4+ bw = 4 + 0.23 = 4.23m
i.e. ly = 4.105m
Since ly = 4.105 = 1.13 < 2
lx 3.605
say 1.2
Hence Design Two way slab
From Code Book 456 : 2000 pg no 91 calculate x & y
i.e. x = 0.060
y = 0.047
Load on the slab:
Self wt of slab = 0.125 x 1 x 25 = 3.125kn/m
Live load =
2 x 1 = 2kn/m
Floor Finish =
1 x 1 = 1kn/m
Total Load = 6.125kn/m
Factored Load = w x 1.5
= 6.125 x 1.5 = 9.187kn/m.
Calculation Of Moments:
Mx =x .w. lx = 0.060 x 9.187 x 3.6 = 7.14knm.
My = y .w. lx = 0.047 x 9.187 x 3.6 = 5.6knm.
i.
Design Of Reinforcement:
Reinforcement for middle strip along with shorter direction.
Mx = 0.87 x fy x Astx
d fy x Astx
fck
b
d fy x Asty
fck
b
150
Hence provide 6mm bars 190mm c/c along edge strip.
iv. Torsion Reinforcement:
DESIGN OF BEAM:
For frame A1 B1 C1 D1
Design of beam at mid span :
Mid span = 39.15 + 21.01 = 30.08 Kn.m
2
Equate Mu = Mu lim
30.08x106 = 0.138 fck bd2
30.08x106 = 0.138 x 20 x 230 x d2
d2 = 47385
d = 217.68 < 450
Hence Safe
Reinforcement:
Mu = 0.87fy Ast d-fy x Ast
fck
b
30.08x106 = 0.87x415 Ast 310 - 415 x Ast
20
230
83.31 x 103 = 310Ast 0.09 Ast2
Ast = 293.8 mm2
Bars using 12mm bars
No: of bars at middle span = 293.8
x(12)2
4
= 293.8 = 2.5 i.e. 3 bars
113.09
Design of beam at support :
Mu = 21.01 Kn.m
Equate Mu = Mu lim
21.01x106 = 0.138 fck bd2
21.01x106 = 0.138 x 20 x 230 x d2
d2 = 33097.03
d = 181.92 < 450
Hence Safe
Reinforcement:
Mu = 0.87fy Ast d-fy - Ast
fck
b
6
21.01x10 = 0.87x415 Ast 310 - 415 x Ast
20
230
3
2
58.191 x 10 = 310Ast 0.09 Ast
Ast = 199.23 mm2
Bars using 12mm bars
No: of bars at middle span = 199.23
x(12)2
4
= 199.23 = 1.76 i.e. 2 bars
113.09
DESIGN OF STAIRCASE:
Length of stairs = 4.5m
Width of the stairs = 3.5m
Height = 3.4m
Live Load = 3 KN/m2
Use M20 grade of concrete and HYSD steel bars
cbc= 7 N/mm2
st= 230 N/mm2
280
280
3 7
= 13.33
Neutral Axis Constant : -
mcbc
k = m +
cbc
st
13.337
= (13.337)+230
= 0.28
Lever Arm Constant : k
3
0.28
1
3
j = 1
=
= 0.9
Q=
= 0.88
Since the total height to be reached it 3m, provide 2 flights
Height of each flight = 3.4
2
= 1.7 m
Assume depth of the riser as 150 mm
No. of risers in each flight =1.7
0.15
= 11
No. of thread
=11-1=10
Assume thread size=300mm
Effective span, l = width of thread+mid landing+0.15
2
= (10x0.3) + 1.5 +0.15 = 4.575 m
2
LOAD :
Self weight of the staircase =
10.1525
2
= 1.875 KN/m
Self weight of the waist slab=10.1725=4.25 KN/m
Self weight of the waist slab on slopped area
=
=
=
Live Load
Floor Finish
Total Load
M
Qb
21.65 x 10
0.88 x 1000
= 156.85 mm
say 160 mm
Area of main steel
M
Ast= jd
st
= 21.65 x 106
T
2
2
4.25 150 +300
300
4.75 KN/m
=3X1
= 3 KN/m
= 0.5 KN/m
= 8.25 KN/m
Effective depth d =
2
2
4.25 R +T
W l2
8
= 8.275 x (4.575)2
8
= 21.65 KN-m
0.1
2
1
0
0
0 1
5
0
1
0
0
= 180mm2
= 1000 x /4 x ()
Area
= 1000 x /4 x (8)2
180
= 279 mm
say 270 mm