You are on page 1of 2

AMR CONSTRUCTIONS LIMITED

BUILDING COST INDEX SHEET CALUCULATION BASED ON CPWD- DSR 2007

Sl.No

Description

Unit
1000 QTL QTL 50% 50% CUM CUM SQM 40% 40% 10% 10% LIT 33.33% 33.33% 33.33% SQM 33.33% 33.33% 33.33% Meter 33.33% 33.33% 33.33% EACH

Rate as on 1/10/07
2000 457 3280 700 650 381.1

1 Bricks 2 CEMENT (OPC) 3 STEEL A)8&10MM DIA 50% B)12 &16MM DIA 50% 4 AGGREGATE 20MM SIZE 5 SAND (COARSE SAND) 6 FLOORING ITEMS I) MOSAIC TILES II) CERAMIC TILES III) KOTA STONE IV) GRANITE STONE 7 PAINTS I) SYNTHETIC ENAMEL II) OBD III) PE 8 PLY & COMMERCIAL WOOD I) 2MM THK PARTICLE BOARD II) STEL WINDOWS STANDARD Z SECTION III) ALUMINIUM WINDOW 9 PIPES I) 15MM GI PIPE ii) 100mm SCI Pipes iii) 20mm Black conduits 10 LAMPS & FANS I) CEILING FANS II) 1.20M FLOURESCENT TUBE WITH TUBE WITH FITTINGS 11 ELECTRICAL MACHINERY MOTOR 7.5 BHP(PUMPSET) 1500 RPM(KIRLOSKAR) 12 WIRES & CABLES COPPER WIRES I)1.5 SQMM II) 4.0 SQMM 13 LABOUR I)SKILLED II) UNSKILLED

100

1281.3

144.5

655

EACH 100 MTR 70% 30% EACH 50% 50%

35000 825

143.38

ON BASED ON CPWD- DSR 2007

INSERT PRESENT RATE

Weightage
8 14.5 19.5 6.5 3 3

Rate as on
2550 466 4794 800 700 493

Cost Index
10.2 14.79 28.5 7.43 3.23 3.88

118.33

3.55

1314.33

5.13

2.5

221

3.82

3.5

865

4.62

2.5 4

35000 1041.5

2.5 5.05

25

150

26.15

100

118.85