ABSTRACT
In this paper a generalized algorithm has been developed to find the shortest path in a transmission line network. The selected network or graph for the proposed algorithm has the ability to traverse a network or graph with any complex structures, with any number of nodes and with any number of paths this algorithm has been developed by considering the source node as the starting node and designation node as the end node. Dijikstrass algorithm is used to find the closest node from the source node. The proposed software is developed, tested and verified with an example. The problem of finding efficient routing algorithm has been a fundamental area, in the field of a transmission line network. Routing is the act of transform the power from source to destination.
INTRODUCTION
Routing in network involves two basic activities Determining optimal routing paths and Transporting power from through an inter network.
An ideal routing algorithm should strive to find the optimal path for power transmission within a least transmission cost so as to satisfy the customers demand for a fast service.
The optimality attributes which usually implies an efficient use of the network resources so as to optimize a selected performance measures such as network through put. This paper focuses on the minimum short path routing where the goal is to minimize the weight of the traveling path and reduces the investment cost on transmission line.
CONSTRUCTION ACTIVITIES
Survey Design manufactures Laying of foundation Erecting of superstructures
TOWER This is the most important items to support the power conductor and ground wires at the required distance above ground level maintaining an appropriate inter conductor spacing in all operating condition. This constitutes about 30 to 40% of the cost of the line.
TYPES OF TOWERS Broad Based Narrow Based Square Base Rectangular Base Y or V shaped supported by external and internal guys. Mild steel Mild steel + High tensile steel Vertical Horizontal Delta River crossing Railway crossing Road crossing Power line crossing Communication line crossing
STRUCTERS
SHAPES
CROSSINGS
LINE PLANNING
The basic parameters for selection of material and standards, once decided will help adopting sound construction practices estimation of material labour and transports facilities should have been assessed. The material should be made available at site, required working equipped with tools and tackles should be available as when required.
MINIMUM
LAND
WIDTH
REQUIRED
FOR
POWER
LINE
CONSTRUCTION.
PROBLEM STATEMENT
The main objective of the proposed algorithm is to find the minimum path in a transmission line network. Starting from the source node to the destination node, there may be several paths in a net work. The lengths of a each path are taken in to consideration and they are compared with each other respectively. Now the path having the minimum length among all the paths from source to destination will be regarded as the minimum path of the network. This is the normal procedure for finding the shortest path or minimum path of a transmission network or graph. Several algorithms have been discovered so far to compute the short path in a graph. For instance Dijikstras algorithm computes the shortest path from the source node to every other node in the network. Similarly Wars Hals algorithm computes the shortest path from the source node to destination node of a given network. All this algorithms described so far, find the minimum path of a communication network or a graph, where the network or graph, where network or the graph has exactly only one minimum path here question arises. What will be the minimum path if a network or graph has more than two paths having the same length (eight), that too the minimum lengths? The solution for the above question has not been answered yet. But the proposed algorithm gives a precise solution for the question discussed above.
What will be the minimum path if two or more paths have the same length of a given graph? (all those paths having the minimum length).This procedure is a precise one which exact shortest path of a given graph and also gives the solution for the question discussed above and is completely different from Dijikstras and Wars halls algorithm. Dijikstras has analyzed the various paths from source to destination and has given the minimum path among the N given paths as the shortest path of the graph.Warshall has traversed the entire graph from the beginning to end and has given the minimum path from the Oth vertices to the Nth vertices. But this paper gives a perfect solution for the above query. Let us consider a graph or a network G with N vertices (nodes)and P paths. irst the various paths from the source node to the destination node are taken not consideration.the second step is to find the length path has been found out . If two or more paths have the minimum length then the paths having the minimum lengths ate taken into consideration separately. The number of edges of these paths is noted. the path having the minimum lengths will be the shortest path of the given graph .even now if two paths has the sane number of edges and same weight then both the paths are the shortest paths from the source node to the destination node of the given graph.
11. The first element in the array will have the path with the minimum number of edges. 12. Finally the corresponding path of the first element is considered to be the shortest path of the given graph G with N vertices.
1 3 B D
4 8 6
2 8 5 7
Swap the lengths & store the minimum length path in a variable
False
If two paths have the same length True Find the path with minimum edges &store in an array
Stop
OUT PUT
THE PATHS ARE AS FOLLOWD 1. THE 1 PATH IS (ABDFG) AND ITS 2. LENGTHIS 16 3. THE 2 PATH IS (ABB1DFG) AND ITS LENGTH IS 17 4. THE 3 PATH IS (ABG) AND ITS LENGTH IS 10 5. THE 4 PATH IS (ABB1 G) AND ITS LENGTH IS 11 6. THE 5 PATH IS (AEG) AND ITS LENGTH IS 8 7. THE 6 PATH IS (AG) AND ITS LENGTH IS 8 8. THE 7 PATH IS (ACG) AND ITS LENGTH IS 9 9. THE NUMBER OF EDGESOF PATH AEG:2 10. THE NUMBER OF EDGES OF PATH AG:1 11. THE SHORTEST PATH IS (AG) WITH LENGTH 8 AND 1 EDGE.
APPLICATIONS
Industrial automation Telecommunication Civil road construction Electrical transmission lines Local area net works (LAN).
CONCLUSION
Hence the proposed algorithm is used to find the minimum path of a graph or a network with any complex structure. The generalized software is highly interactive and user friendly. The algorithm is coded in C and the results are verified with different net work configuration for various numbers of nodes. It can address any real world problem. 1. find the cheapest way to travel between two locations. 2. Finding the minimum path even if there are two paths with the same length that too the minimum length. The major advantages of the system are fast and accurate information retrieval, ease of use and time saving. REFERENCES 1. Data structures and algorithms by Schams series 2. Construction of Transmission Lines at power training centre at PSTI manual 3. Programming in ANSI C by BalaGuruswamy