You are on page 1of 2

ECOTECH SERVICES

Total Aqua Engineering Solutions

No:30 kaliamman kovil 1 street porur,Chennai-116.E-mail :ecotechtotal @gmail.com Date 02/03/2013 To MANDO INDIA LIMITED F64, Sipcot Industrial Park Irrungattukottai Sriperumbudur Taluk Tamil Nadu 602 117 Kind Attn Mr. Ratnagiri Manager Maintenance Mr. R Senthil Sub:- Offer for CETP revamping rev-2 We thank you for your referred enquiry and we are pleased to submit our offer Sl No Description Qty 1 Aeration tank re-work Lumsum Fine diffuser retrievable type 6 set Attached growth media 3 m3 MS gird with PVC sleeve mesh PVC piping 2 ETP revamping Coagulation & Flocculation system 1 set (M S Tank with agitator) Oil Skimmer 1 no (size 1000x500x.2mm) Dosing system 1 set Pump 5LPH Tank 100 liters sintex 3 FRB coolant storage tank capacity 2 m3 1 set Size 1.5 x 1.5 x 1 mtr height M S Base frame for coolant tank Size 1.8 x 1.8 x 1.5 mtr Over flow coolant collection at bottom of the frame. 4 5 6 PSF & ACF media change Air blower services Erection charge 2 no 2 no Lumsum Rate 1,50,000 Amount `1,50,000

st

1,30,000 80,000 10,000 85,000 60,000

1,30,000 80,000 10,000 85,000 60,000

45,000 30,000 35,000 TOTAL 6,25,000 (Six Lakhs twenty five Thousand Rupees Only)

45,000 30,000 35,000

Civil work (option) Sl, no Description Qty Rate Amount 1 RCC settling tank above the ground 1 no 5,40,000 5,40,000 Capacity 27 KLD Size 3m x 3m x3m (2.3mtr LD) Bottom .7 mtr taper Inside - Water proofing with plasting Outside plasting As per required standard Above price is approximately TOTAL 5,40,000 (Five Lakhs Forty Thousand Rupees Only) Scope of work Above work completion as per site conditional Erection completion based on materials reached at site All required equipment for erection is our scope Scope of client Required power and water for erection All Civil work Sewage trucking out at the time of aeration tank work TERMS AND CONDITIONS Work start Tax Payment Validity -- One week from date of PO with advance -- Extra as applicable -- 50 % along with PO for mobilizing 40 % after supply of materials 10% after erection completion -- One month

We trust above would your meet requirements and we now look forward to receive your valuable order Thanking you Yours faithfully For ECO TECH SERVICES ILAYARAJA P Head Sales and Services Mobil-09445792625 E-mail ecotechtotal@gmail.com

You might also like