KROFTA
SUPERCELL SPC 8
(Type of Effluent - Dairy effluent)
INLET PARAMETERS
OUTLET PARAMETERS
Dimensions:
Diameter : 2400 mm
The unit is designed for continuous flow and consists of the following elements which are suspended
and fixed to the central shaft (pipe).
i. Revolving carriage with traction wheel driven by a variable speed geared motor.
ii. Two (2) inbuilt rings for clarified water and floated stock.
vi. Bottom scraper for sediment collection into inbuilt sediment trough.
The unit will be delivered pre - fabricated and in unassembled condition for assembly at site.
Two (2) gear motors for carriage and spiral scoop drive.
Capacity : 0.25 kw
Voltage : 415 + 6% V.
Frequency : 50 Hz
Protection : IP 55
The electrical current supply is facilitated by a rotary contact with eight (8) poles for feeding electrical
power to the drive.
All inbuilt moving parts (carriage, spiral scoop, inlet pipe and distribution grid etc.) as well as tank itself
will be constructed in stainless steel 304. Tank support welded to the tub and carriage support will be
constructed in mild steel and painted.
Page 2 of 4
2. Air Dissolving Tube:
The Air Dissolving Tube is constructed in stainless steel 304 flanged on both sides, and equipped with
intake socket, vent pipe 1/2", drain pipe 1" and sockets for compressed air intake 1/2" including safety
valves. Inbuilt to the tube is one (1) Krofta Vyon Plate reinforced.
Dimensions:
Diameter : ND 150
Length : 620 mm
Intake : ND 40
Outlet : ND 40
5. Guarantees:
All parts except those subject to wear and tear are guaranteed for a period of 12 months from the date
of dispatch for faulty material and workmanship provided the equipments have been operated as per
their respective operating and maintenance instructions.
Page 3 of 4
5.2 Performance Guarantee:
We guarantee the Krofta Supercell to achieve TSS less than 100 ppm and Oil less than 20 ppm in the
outlet., if operated as per our operating and maintenance instructions. This however, is subject to a
sufficient dosage of recommended chemicals (flocculation and / or flotation aids).
6. Price;
Supervision per erection and commissioning of our equipment has been included in our offer,
local conveyance to our engineer is to be provided free of cost at site. Post 15 days, The
supervision charges will be extra @ INR 7500/- per day per person excluding To & fro fare , local
conveyance, boarding & lodging .
9. Terms of payment
4-5 months from receipt of order along with advance payment. Extra time may be required for any
approval of drawings prior to fabrication.
11. Validity:
Page 4 of 4