in Erode Disrtict under Rain Water Harvesting Scheme for the year 2008-09
Estimate Amount Rs:- 80000.00 1) Name of the Revenue Village :-Ayyampalayam 2) Location (S.F.No.& Location):- The site is located at a distance of 20KM From Sathyamangalam and 12 km from Pulliyampatti. 3) Particulars of land use :Village Name of the land owner S.F.No. Total Extent Sub Division Ha. Extent Proposed Ha. Remarks
Panayampalli
4) RAIN FALL Average annual rain fall :-775.46mm 5) SOIL CONDITION Depth of soil :- 0 to 0.30 m Depth of sub soil :-0.30 to 0.65 Texture :- Earth mixed with small sized boulders & hard gravelly soil Infiltration capacity :- Fair / Moderate 6) Crops Main crops :- Ground nut Rotation of crops :- Ragi, Cholam Pattern of cultivation :-Sown in July,Aug & Harvested in October, November Whether composed manure used :- Yes 7) Erosion Hazards of Erosion Type of Erosion
NO
LENGTH in metre
BREADTH in metre
DEPTH in metre
QUANTITY in cum
FORM POND 1
15.00
11.80 35.00
2 33.75 23.75
= =
716.096
x 35.32 x 10-6
0.025 mcft
LEAD STATEMENT
NAME OF WORK : FARM POND under RWHS DISTRICT:ERODE/ TALUK:SATHYAMANGALAM / BLOCK:BHAVANISAGAR VILLAGE:AYYAMPALAYAM ; SF.NO: 59/2 Work site Destination
Quantity Lead Distance in K.m. Ordinary 11 Hill Lead charges Ordinary 60.65 Hill Cost of Materials Total Cost Rs.
Sl.No.
Description of Materials
Source of supply
Nalroad
200.00
260.65
1. The distance furnished are correct and minimum to the best of my Knowledge. 2. The rates adopted are as per the current P.W.D. Schedule of rates for the year 2008-09
Counter signed Assistant Exeutive Engineer, Agricultural Engg, Department, Gobichettipalayam. Junior Engineer, Agricultural Engg, Department, Gobichettipalayam.
DATA SHEET
Name of scheme: Artificial recharge to ground water Name of work : Major Check dam District: Erode : Taluk: Gobichettipalayam Block: Nambiyur ; Panchayat:Nambiyur Village : Nambiyur-"A" SF.No: 411 & 728 Sl. No. Details 1 Mason (for stone work) Iclass 2 Mason (for stone work) IIclass 3 Mazdoor Category-I 4 Mazdoor Category-II 5 Stone cutter I Class
SI (D) 49
26.75 /cum
SI (D) 50
24.35 /cum
SI (D) 61
38.80 /cum
36.40 /cum 54.20 /cum 95.50 /cum 132.30 /cum 4.60 /cum 3.70 /cum
e f g 5 6 7
Sl (D) 79 A
7.65 /cum
DATA SHEET
NAME OF WORK : FARM POND under RWHS DISTRICT:ERODE/ TALUK:SATHYAMANGALAM / BLOCK:BHAVANISAGAR VILLAGE:AYYAMPALAYAM ; SF.NO: 59/2 Sl.No. Quantity 1 1 2 2
M
2
Description of item 3 Clearing light jungle as per SI.No:2 H.G.S.SS.20.B.Earthwork excovating and depositing on bank within initial lead of 10 M.& initial lift of 2M. In hard stiff clay,stiff black cotton, hard red earth, shales, murram, gravel, stoneyearth, and earth mixed with small size boulders as per S.S.20.B.and S.I.62. H.G.S. S.S.20.A. Earth work excovating and depositing on bank within initial lead of 10 M.& initial lift of 2M. In hard stiff clay,stiff black cotton, hard red earth, shales, murram, gravel, stoneyearth, and earth mixed with small size boulders as per S.S.20.A.and S.I.61.
M3
28.75
M3
28.75
M3
30.60
M3
30.60
M3
SDR (Not requiring blasting).Earthwork excovating and depositing on bank within initial lead of 10 M.& initial lift of 2M. 42.90 soft disintegrated rock,laterite,softrock or kunkar not requirig blasting as per SI67 For Pond Add to relevent T.N.D.S.S No. 20.A rates for new tank bunds and closing breaches for extra watering and consolidation. (A) By hand rollars as per Sl.No.79.A.
M3
42.90
M3
6.05
M3
6.05
Extra for every additional 10M. Lead or part thereof over the initial lead as per Sl.No 76 I Lead 3.65 II Lead 2x3.65 III Lead 3x3.65 IV Lead 4x3.65 V Lead 5x3.65 M3 Extra for every additional 1Meter. Lift or part thereof over the initial lift as per Sl.No 77 I Lift 2.95 II Lift 2 x 2.95 Certified that the above rates are adopted as per the current P.W.D standard shedule of rates for the year 2008-09
M3
M3 M
3
M3 M3 M3
M3 M3
2.95 5.90
Total 250.13 2 SDR-(Not Requiring Blasting) Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Soft disintegrated rock, laterite, soft rock or kankar, not requiring blasting. For DEEPENING OF POND 1 x 1 14.00 + 12.80 34.00 + 32.80 0.60 268.54
2 2
Total
268.54
MR-&-DMR (Not Requiring Blasting) Earth work excavating and depositing on bank with a initial lead of 10 m & 3 initial lift of 2m in medium rock and dense medium rock not requiring blasting. For DEEPENING OF POND 1 x 1 12.80 + 11.80 32.80 + 31.80 0.50 198.65
2 2
Total 198.65 4 H.G.S.SS.20.A.Earthwork excovating and depositing on bank within initial lead of 10 M.& initial lift of 2M. In hard stiff clay,stiff black cotton, hard red earth, shales, murram, gravel, stoneyearth, and earth mixed with small size boulders as per S.S.20.A.and S.I.61. For Bund For Bund qty 1 x 1 30 3.00 + 1.00 1.00 60.00 2 Deduct inlet&outlet vent 1 x 2 4.5 3.00 + 1.00 1.00 18.00 2 Total 42.00 5 Extra for every additional 10M. Lead or part thereof over the initial lead as per Sl.No 76 I Lead 190.00 6 Add to relevent T.N.D.S.S No. 20.A rates for new tank bunds and closing breaches for extra watering and consolidation. (A) By hand rollars as per Sl.No.79.A. 42.00 7 Provision for TNCLW Fund 0.3% 8 Provision for photography charges 9 Provisoion for Unforseen items LS LS LS
M3 M3
M3 M3
M3 M3
M3 M3
M3
M3
Rs
HGS SS.20.B. Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, 250.13 M3 stiff black cotton, hard red earth, shales,murram, gravel, stoney earth and earth mixed with small size boulders SS.20B SDR-(Not Requiring Blasting) Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m 268.54 M3 in Soft disintegrated rock, laterite, soft rock or kankar, not requiring blasting. MR-&-DMR (Not Requiring Blasting) Earth work excavating and depositing on bank with a initial lead of 10 m 198.65 M3 & initial lift of 2m in medium rock and dense medium rock not requiring blasting. HGS SS.20.A. Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, 42.00 M3 stiff black cotton, hard red earth, shales,murram, gravel, stoney earth and earth mixed with small size boulders SS.20.A.(New buund formation) Extra for every additional 10M. Lead or part thereof over the initial lead as per Sl.No 76 3 190.00 M I Lead 3 42.00 M Add to relevant T.N.D.S.S. No.20.A, rates for new tank bunds and closing breaches for extra watering and consolidation, By hand roller Provision for TNCLW Fund 0.3% LS LS Provision for photography charges Provisoion for Unforseen items
36.40
M3
54.20
M3
95.50
M3
38.80
M3
4.60
M3
7.65
M3
7 8 9
LS LS Total
weir
M POND
Amount Rs Ps
9104.55
14554.65
18970.60
1630.00
874.00
DETAILED ESTIMATE
NAME OF WORK : FARM POND under RWHS VILLAGE:AYYAMPALAYAM ; SF.NO: 59/2 DISTRICT:ERODE/ TALUK:SATHYAMANGALAM / BLOCK:BHAVANISAGAR Sl.no. 1 1 Description of work 2 Nos. 3 Length M. 4 H.G.S.SS.20.B.Earthwork excovating and depositing on bank within initial lead of 10 M.& initial lift of 2M. In hard stiff clay,stiff black cotton, hard red earth, shales, murram, gravel, stoneyearth, and earth mixed with small size boulders as per S.S.20.B.and S.I.62. For foundation of weir. Bell mouth toe Cutt off wall - I Cutt off wall - II Side wall Apron 1x1 1x1 1x1 1x1 1x1 5.50 7.00 7.50 2.50 7.00 + 7.50 2 Total 2 Rough stone dry Packing for Bell Mouth BGL Bell mouth toe Cutt off wall - I Cutt off wall - II Side wall Apron AGL Slopping portion 1x1 1x1 1x1 1x1 1x1 1x1 5.50 7.00 7.50 2.50 7.00 + 7.50 2 5.50 + 2 2.50 1.00 0.23 Total 0.92 7.73 0.45 0.45 0.45 0.45 1.35 0.45 0.45 0.45 0.45 0.23 1.11 1.42 1.52 0.51 2.25 6.81 0.45 0.45 0.45 0.45 1.35 0.45 0.45 0.45 0.45 0.23 1.11 1.42 1.52 0.51 2.25 Breadth M. 5 Depth M. 6 Quantity Cu.M 7
Counter signed.
ABSTRACT ESTIMATE
NAME OF WORK : FARM POND under RWHS VILLAGE:AYYAMPALAYAM ; SF.NO: 59/2 DISTRICT:ERODE/ TALUK:SATHYAMANGALAM / BLOCK:BHAVANISAGAR Sl.No. Quantity Description of item Rate Rs 1 6.81 H.G.S.SS.20.B.Earthwork excovating and depositing Cu.M. on bank within initial lead of 10 M.& initial lift of 2M. In hard stiff clay,stiff black cotton, hard red earth, shales, murram, gravel, stoneyearth, and earth mixed with small size boulders as per S.S.20.B.and S.I.62. 2 7.73 Rough stone dry packing for bund bell mouth Cu.M. 890.00 Cu.M. 6879.70 28.75 Cu.M. 195.80 Ps Unit Amount Rs. Ps
TOTAL
7075.50
Counter signed.
LONGITUDINAL SECTION
15.00 CS
3.00
11.80
1.60
MDR
HGS
SDR
31.80
35.00
31.80
35.00
CS
15.00
35.00
LS
LS
PLAN
GL
3.00
CROSS SECTION
31.80
1.00
0.50
0.60
0.50
SCALE:NOT TO SCALE
GOBI KAVANDAPADI
PERIYAKALLIPATTI PIRIUV
PANAYAMPALLI
AYYAMPALAYAM
PULIYAMPATTI
ERODE
SANAPIRATAI
Checked by me:-
Prepared by me:-
REFERENCE CEMENT
SAND(SANAPIRATAI)
STONE(BHAVANISAGAR NALLROAD)
PROPOSED SITE
TONE(BHAVANISAGAR ALLROAD)
GENERAL ABSTRACT
NAME OF WORK : FARM POND under RWHS VILLAGE:AYYAMPALAYAM ; SF.NO: 59/2
####
Sl.No 1 2 3 4
Description Cost of Formation of Bund Cost of Construction of Surplus Arrengement Provision for Photographic Charges Provisoion for Unforseen items
Total
87856.80
Counder singined Asst.Executive Engineer Agrl Engineering Dept Gobichettipalayam Junior Engineer, Agrl. Engineering Dept. Gobichettipalayam.