1 Introducing the TransData ..........................................................................................................6 2 Introducing the Main Interface ..................................................................................................7
2.1 Logging in to Server......................................................................................................................................... 8 2.2 Introducing the Entrance to the Task................................................................................................................ 9 2.3 Introducing the Shortcut Menu....................................................................................................................... 12 2.4 Introducing the Menu Bar .............................................................................................................................. 15 2.4.1 Project Menu......................................................................................................................................... 15 2.4.2 Task Menu............................................................................................................................................. 16 2.4.3 View Menu............................................................................................................................................ 17 2.4.4 Help Menu ............................................................................................................................................ 18 2.5 Introducing the Toolbar .................................................................................................................................. 20
Issue 01 (2007-01-19)
Contents
GENEX Nastar WCDMA TransData User Manual 4.2.2 Deleting a Configuration Parameter Data ............................................................................................. 42 4.2.3 Importing a Performance Data .............................................................................................................. 44 4.2.4 Deleting a Performance Data ................................................................................................................ 47 4.2.5 Importing a CHR Data .......................................................................................................................... 49 4.2.6 Deleting a CHR Data ............................................................................................................................ 52 4.2.7 Importing an ISO Data.......................................................................................................................... 53 4.2.8 Deleting an IOS Data ............................................................................................................................ 55 4.2.9 Importing a RTWP Data........................................................................................................................ 57 4.2.10 Deleting a RTWP Data........................................................................................................................ 61
ii
Issue 01 (2007-01-19)
Figures
Figures
Figure 2-1 Login Server dialog box ...................................................................................................................... 8 Figure 2-2 Main interface of the Genex Nastar TransData.................................................................................... 9 Figure 2-3 All tasks displayed in the task pane ................................................................................................... 10 Figure 2-4 Tasks of the selected project .............................................................................................................. 11 Figure 2-5 Display tasks of a data ....................................................................................................................... 12 Figure 2-6 Shortcut menu of the WCDMA node................................................................................................ 12 Figure 2-7 Shortcut menu of the project node ..................................................................................................... 13 Figure 2-8 Right-click shortcut menu of a data ................................................................................................... 14 Figure 2-9 Query Result dialog box .................................................................................................................... 14 Figure 2-10 Shortcut menu of a task ................................................................................................................... 15 Figure 2-11 System menu.................................................................................................................................... 15 Figure 2-12 Project menu .................................................................................................................................... 16 Figure 2-13 Task menu........................................................................................................................................ 16 Figure 2-14 View menu ....................................................................................................................................... 17 Figure 2-15 Output Bar ....................................................................................................................................... 18 Figure 2-16 Help menu........................................................................................................................................ 18 Figure 2-17 About TransData dialog box ............................................................................................................ 18 Figure 2-18 Get ESN Code dialog box................................................................................................................ 19 Figure 2-19 License Info dialog box ................................................................................................................... 19 Figure 2-20 Open dialog box............................................................................................................................... 20 Figure 2-21 Toolbar............................................................................................................................................. 20 Figure 3-1 Project menu ...................................................................................................................................... 24 Figure 3-2 New Project on the right-click shortcut menu ................................................................................... 24 Figure 3-3 Create WCDMA Project dialog box .................................................................................................. 25 Figure 3-4 New project listed in the Project View pane ...................................................................................... 26 Figure 3-5 Project menu ...................................................................................................................................... 26
Issue 01 (2007-01-19)
iii
Figures
Figure 3-6 Management on the right-click shortcut menu .................................................................................. 26 Figure 3-7 Manage WCDMA Projects ................................................................................................................ 27 Figure 3-8 Browse for Folder dialog box ............................................................................................................ 28 Figure 3-9 Please select backup project file dialog box ...................................................................................... 29 Figure 3-10 Restore Project dialog box............................................................................................................... 30 Figure 3-11 Edit Task on the shortcut menu ........................................................................................................ 31 Figure 3-12 Data Import Task Setting dialog box ............................................................................................... 32 Figure 3-13 Data Import Task Setting dialog boxConfiguration Data............................................................. 32 Figure 3-14 Edit Task on the shortcut menu........................................................................................................ 33 Figure 3-15 Data Delete Task Setting dialog box................................................................................................ 34 Figure 3-16 Custom Time Setting dialog box...................................................................................................... 35 Figure 4-1 Import Engineering Parameter on the Project menu .......................................................................... 38 Figure 4-2 Import Project Parameter on the shortcut menu................................................................................. 38 Figure 4-3 Open dialog box................................................................................................................................. 39 Figure 4-4 Select Excel Sheet dialog box............................................................................................................ 39 Figure 4-5 Project Parameter Import Setting dialog box..................................................................................... 40 Figure 4-6 Data Import Task Setting dialog boxConfiguration Data............................................................... 41 Figure 4-7 Data Delete Task SettingConfiguration Data ................................................................................. 43 Figure 4-8 Data Import Task Setting dialog boxPerformance Data................................................................. 45 Figure 4-9 Query Result dialog box .................................................................................................................... 47 Figure 4-10 Data Delete Task Setting dialog box................................................................................................ 48 Figure 4-11 Data Import Task Setting dialog boxCHR Data Import ............................................................... 50 Figure 4-12 Set CHR Import Condition dialog box ............................................................................................ 52 Figure 4-13 Data Delete Task Setting dialog box................................................................................................ 53 Figure 4-14 Data Import Task Setting dialog boxIOS Data............................................................................. 54 Figure 4-15 Data Delete Task Setting dialog box................................................................................................ 56 Figure 4-16 Data Import Task Setting dialog boxRTWP Data ........................................................................ 58 Figure 4-17 RTWP TXT File Information dialog box......................................................................................... 60 Figure 4-18 Data Delete Task Setting dialog box................................................................................................ 61
iv
Issue 01 (2007-01-19)
Tables
Tables
Table 2-1 Login Server dialog box ........................................................................................................................ 8 Table 2-2 Main interface of the Genex Nastar TransData...................................................................................... 9 Table 2-3 Shortcut menu of the WCDMA node .................................................................................................. 13 Table 2-4 Shortcut menu of the project node....................................................................................................... 13 Table 2-5 Shortcut menu of a task ....................................................................................................................... 15 Table 2-6 Descriptions of the Project menu......................................................................................................... 16 Table 2-7 Descriptions of the Task menu............................................................................................................. 16 Table 2-8 Descriptions of the View menu............................................................................................................ 17 Table 2-9 Description of the button icons on the Toolbar.................................................................................... 21 Table 3-1 Create WCDMA Project dialog box .................................................................................................... 25 Table 3-2 Manage WCDMA Projects dialog box ................................................................................................ 27 Table 3-3 Task states............................................................................................................................................ 30 Table 3-4 Descriptions of the data Import Task Setting dialog box..................................................................... 32 Table 3-5 Custom Time Setting dialog box ......................................................................................................... 35 Table 4-1 Descriptions of the Data Import Task Setting dialog box .................................................................... 41 Table 4-2 Descriptions of the Data Delete Task Setting dialog box. ................................................................... 43 Table 4-3 Descriptions of the Data Import Task Setting dialog box .................................................................... 45 Table 4-4 Descriptions of the Data Delete Task Setting dialog box .................................................................... 48 Table 4-5 Descriptions of the Data Import Task Setting dialog box .................................................................... 50 Table 4-6 Descriptions of the Data Import Task Setting dialog box .................................................................... 54 Table 4-7 Descriptions of the Data Delete Task Setting dialog box .................................................................... 56 Table 4-8 Descriptions of the Data Import Task Setting dialog box .................................................................... 58 Table 4-9 RTWP TXT File Information dialog box............................................................................................. 60 Table 4-10 Descriptions of the Data Delete Task Setting dialog box .................................................................. 61
Issue 01 (2007-01-19)
1
z
The TransData is the assistant software for Genex Nastar WCDMA. The TransData can automatically import or delete project data of the Genex Nastar WCDMA projects to save time for maintaining multiple projects, especially in the server mode when there are many projects. This tool provides the following functions: Managing projects For details, refer to section 3.1 "Managing a Project."
z
Managing tasks For details, refer to section 3.2 "Managing a Task." Managing data
For details, refer to chapter4 "Managing the Data." Currently, the TransData provides to import the following six data:
z z z z z z
RNC traffic statistic data Configuration parameter data Project parameter data CHR data IOS data RTWP dat
Issue 01 (2007-01-19)
2
About This Chapter
Section
The following table lists the contents of this chapter. Describes Describes the procedure for logging in to the Server. Introduces the entrance to the task. Introduces the menu items on the shortcut menu. Introduces the menu items on the menu bar. Introduces the icons on the toolbar.
2.1 Logging in to Server 2.2 Introducing the Entrance to the Task 2.3 Introducing the Shortcut Menu 2.4 Introducing the Menu Bar 2.5 Introducing the Toolbar
Issue 01 (2007-01-19)
Table 2-1 describes the elements in the Login Server dialog box. Table 2-1 Login Server dialog box Element SQL server User name Password Description Select a database server. Type the user name. Type the password.
Step 2 Select the database server in the SQL server drop-down list. Step 3 Type the user name and password in the User name and Password fields. Step 4 Click Login. After you succeed in logging in to the server, the main interface of the TransData is displayed, as shown in Figure 2-2.
Issue 01 (2007-01-19)
Table 2-2 describes the elements in the main interface of the Genex Nastar TransData. Table 2-2 Main interface of the Genex Nastar TransData Element Project View pane Task pane Output pane Description Lists the projects of the WCDMA node on the left part. Shows tasks for each project in detail on the top-right part. Shows the process status of each task on the bottom-right part.
----End
Issue 01 (2007-01-19)
Step 2 Click a sub-node (project) of the WCDMA node. The tasks of the selected project are displayed in the task pane, as show in Figure 2-4.
10
Issue 01 (2007-01-19)
Step 3 Click a data such as Config Data of a project in the Project View pane. The tasks of the selected data are displayed, as shown in Figure 2-5.
Issue 01 (2007-01-19)
11
----End
12
Issue 01 (2007-01-19)
Table 2-3 Shortcut menu of the WCDMA node Menu Item New Project Management Refresh Description Creates a project Manages the projects Refreshes the WCDMA node.
Table 2-4 describes the shortcut menu of the project node. Table 2-4 Shortcut menu of the project node Menu Item New BSC New MSC Import Engineering Parameter Refresh Description Creates a BSC. Creates a MSC. Imports the project parameter. Refreshes the project node.
NOTE The sub-menu New BSC and New MSC are unavailable in the WCDMA network.
Issue 01 (2007-01-19)
13
Select Query on the shortcut menu, the import information of the data is displayed, as shown in Figure 2-9. Figure 2-9 Query Result dialog box
NOTE Currently, the Query function only supports RNC data and CHR data.
14
Issue 01 (2007-01-19)
Table 2-5 describes the shortcut menu of a task. Table 2-5 Shortcut menu of a task Menu Item Start Task Stop Task Edit Task Description Starts a task. Stops a task. Edits a task.
Issue 01 (2007-01-19)
15
Table 2-6 describes the Project menu. Table 2-6 Descriptions of the Project menu Menu Item New Project New BSC Management Import Engineering Parameter Refresh Exit Description Creates a project. Creates a BSC. Manages projects. Imports project parameters. Refreshes the Project View pane. Exits from the TransData program.
Table 2-7 lists the descriptions of the Task menu. Table 2-7 Descriptions of the Task menu. Menu Item Start Task Description Starts a task.
16
Issue 01 (2007-01-19)
Table 2-8 describes the View menu. Table 2-8 Descriptions of the View menu. Menu Item Toolbar Status Bar Work Space Output Bar Description Click to show or hide the toolbar. Click to Show or hide the status bar. Click to show or hide the workspace. Click to show or hide the output bar. If Output Bar is selected, you can see the details of the task execution in the Output pane. The normal output shows in black font, and the error or warning shows in red font, as shown in Figure 2-15. Detail Log If Detail Log is selected, the details of task execution will be recorded in the log file.
Issue 01 (2007-01-19)
17
The About TransData dialog box shows the version information and copyright information.
18
Issue 01 (2007-01-19)
Get ESN Code dialog box provides relevant ESN code of the software.
Issue 01 (2007-01-19)
19
In the License Info dialog box, you can view the license information.
Step 2 Select the license file, and click Open. Step 3 Click Continue on the displayed dialog to confirm the operation. ----End
20
Issue 01 (2007-01-19)
Table 2-9 lists the description of the button icons on the Toolbar. Table 2-9 Description of the button icons on the Toolbar Icon Hint New Project New BSC Project Management Import Start Stop Edit Custom Description Creates a project. Creates a BSC. Manages projects. Imports project parameters. Starts a task. Stops a task. Edits a task. Customizes the time setting.
Issue 01 (2007-01-19)
21
3
Section
3.1 Managing a Project 3.2 Managing a Task 3.3 Customizing Time Setting
Issue 01 (2007-01-19)
23
z z
Click
on the toolbar.
Select the WCDMA node in the Project View pane, and then select New Project on the shortcut menu, as shown in Figure 3-2.
The Create WCDMA Project dialog box is displayed, as shown in Figure 3-3.
24
Issue 01 (2007-01-19)
Table 3-1describes the Create WCDMA Project dialog box. Table 3-1 Create WCDMA Project dialog box Item Version list Name Description Select a version for the new project. Type a name for the project. The name is consisted of letter, number, and underline. Project Location Description Click to select the path for saving the project.
Step 2 Select the version, type a project name and set path. Step 3 Click Create. The new project is displayed in the Project View pane, as shown in Figure 3-4.
Issue 01 (2007-01-19)
25
----End
z z
Click
on the Toolbar.
Select the WCDMA node in the Project View pane, and then select Management on the shortcut menu, as shown in Figure 3-6.
26
Issue 01 (2007-01-19)
The Manage WCDMA Projects dialog box is displayed, as show in Figure 3-7. Figure 3-7 Manage WCDMA Projects
Table 3-2 describes the Manage WCDMA Projects dialog box. Table 3-2 Manage WCDMA Projects dialog box Item Project List Name Description Create Date Edit Date Disk Space Version Description The name of a project. The descriptions of a project. The date when the project created. The latest date when the data is edited. The occupancy disk space of a project. The version information of a project. Click to backup a selected project. Click to restore a project. Click to delete the selected project. Click to exit from the Manage WCDMA Projects dialog box.
Issue 01 (2007-01-19)
27
Step 3 Select a path for saving the selected project, and click OK. The project is saved as a backup file with the same name as the selected project.
28
Issue 01 (2007-01-19)
Step 3 Select the backup file of the project, and click Open. The program will restore the selected project with the backup file. ----End
Issue 01 (2007-01-19)
29
Step 3 Input the name for the project to be restored. Step 4 Select a backup project file for restoring the project. Step 5 Click OK. ----End
30
Issue 01 (2007-01-19)
Task States
Description Stopped state. It means the task is stopped, or has been stopped by user. Executing state. It means the data are in the process of importing or deleting. Ready state. Waiting state.
The Data Import Task Setting dialog box is displayed, as shown in Figure 3-12.
Issue 01 (2007-01-19)
31
Figure 3-12 Data Import Task Setting dialog box Figure 3-13 Data Import Task Setting dialog boxConfiguration Data
Table 3-4 describes the elements in the Data Import Task Setting dialog box Table 3-4 Descriptions of the data Import Task Setting dialog box Element Basic Task Name Description The name of the task. The default name is Config Data Import. Data Path Execute At Once Select the directory of the file to be imported. Execute the task at once. If you import the data manually, select this option. Execute As Plan Execute the task according the plan set in the Trigger Time field. You can set Begin Time and Granularity in the Trigger Time field. And only when Active Task is selected, the task can be executed.
32
Issue 01 (2007-01-19)
Description Set the begin time to import data. It is available only when Execute As Plan is selected. Granularity Set Granularity to import data in interval after the begin time. It is available only when Execute As Plan is selected.
Data Process
Do not process Delete all data files after importing After import, move date files to
Do not to process data file after the data is imported. Delete all data files after the data is imported.
Click
to select a path.
Move the data file to the selected directory after the data is imported.
Step 2 Edit each element in the Data Import Task Setting dialog box. Step 3 Click OK. ----End
The Data Delete Task Setting dialog box is displayed, as shown in Figure 3-15.
Issue 01 (2007-01-19)
33
Step 2 Edit each element on the Data Delete Task Setting dialog box. Step 3 Click OK. ----End
34
Issue 01 (2007-01-19)
The Custom Time Setting dialog box is displayed, as shown in Figure 3-16. Figure 3-16 Custom Time Setting dialog box
Table 3-5 describes the Custom Time Setting dialog box. Table 3-5 Custom Time Setting dialog box Element Basic Time Unit Week Month Description Select Week to set week as the time unit. Select Month to set month as the time unit. Set the trigger time.
Trigger Time
Customized time list. According to the time unit, display the corresponding date. The name of the customized time. Click to add a customized time to the Time List. Click to remove a selected customized time from the Time List.
Issue 01 (2007-01-19)
35
Step 2 Type a name of the customized time, set time unit, and select the corresponding dates. Step 3 Click Add to add a customized time to the Time List Step 4 Click Exit to close the Custom Time Setting dialog box. ----End
36
Issue 01 (2007-01-19)
4
About This Chapter
Section 4.1 Importing the Project Parameters 4.2 Introducing the Data Management
The following table lists the contents of this chapter. Describes Describe how to import project parameters. Describe how to import or delete all kinds of data.
Issue 01 (2007-01-19)
37
38
Issue 01 (2007-01-19)
Step 2 Select the project file, and click Open. The Select Excel Sheet dialog box is displayed, as shown in Figure 4-4. Figure 4-4 Select Excel Sheet dialog box
Step 3 Select the project parameter sheet, and click OK. The Project Parameter Import Setting dialog box is displayed, as shown in Figure 4-5.
Issue 01 (2007-01-19)
39
The project parameters are matched automatically. That the signin front of a column name means the name has been matched with a certain column and cannot be used to match with the next column. You can also match it manually.
z z
Click the table column header and select the matched column name in the drop-down list. To cancel the match of a column, select Release Match on the shortcut menu.
Step 4 After the match finishes, click OK to import data. If error occurs during importing project parameter, an error report is generated.
NOTE It is suggested to select Clear Database to clear database before importing the project parameter. In this way, you can avoid the errors appears during importing the project parameter.
----End
40
Issue 01 (2007-01-19)
Table 4-1 describes the elements in the Data Import Task Setting dialog box. Table 4-1 Descriptions of the Data Import Task Setting dialog box Element Basic Task Name Description The name of the task. The default name is Config Data Import. Data Path Select the directory of the file to be imported.
Issue 01 (2007-01-19)
41
Description Execute the task at once. If you import the data manually, select this option. Execute As Plan Execute the task according the plan set in the Trigger Time field. You can set Begin Time and Granularity in the Trigger Time field. And only when Active Task is selected, the task can be executed.
Trigger Time
Begin Time
Set the begin time to import data. It is available only when Execute As Plan is selected.
Granularity
Set Granularity to import data in interval after the begin time. It is available only when Execute As Plan is selected.
Data Process
Do not process Delete all data files after importing After import, move date files to
Do not to process data file after the data is imported. Delete all data files after the data is imported.
Click
to select a path.
Move the data file to the selected directory after the data is imported.
Step 3 Type task name, and select the directory of the file to be imported. Step 4 Select task execution type.
z z
Select Execute At Once to import the data manually. Select Execute As Plan to import the data automatically, and set Begin Time and Granularity in Trigger Time.
42
Issue 01 (2007-01-19)
The Data Delete Task Setting dialog box is displayed, as shown in Figure 4-7. Figure 4-7 Data Delete Task SettingConfiguration Data
Table 4-2 describes the elements in the Data Delete Task Setting dialog box. Table 4-2 Descriptions of the Data Delete Task Setting dialog box. Element Basic Task Name Description The name of the task. The default name is Config Data Delete. Execute At Once Execute the task at once. If you manually delete the data, select this option. Execute As Plan Execute the task according the plan set in the Trigger Time field. You can set Begin Time and Granularity in the Trigger Time field. And only when Active Task is selected, the task can be executed. Trigger Time Begin Time Set the begin time to delete the data. It is available only when Execute As Plan is selected. Granularity Set Granularity to delete data in interval after the begin time. It is available only when Execute As Plan is selected.
Issue 01 (2007-01-19)
43
Step 3 Type the task name and execution type. Step 4 Click OK. ----End
44
Issue 01 (2007-01-19)
Table 4-3 describes the elements in the Data Import Task Setting dialog box. Table 4-3 Descriptions of the Data Import Task Setting dialog box Element Basic Task Name Description The name of the task. The default name is Performance Data Import. Data Path Item set Select the directory of the file to be imported. Select item set to be queried from the Item set drop-down list.
Issue 01 (2007-01-19)
45
Description Execute the task at once. If you manually import the data, select this option. Execute As Plan Execute the task according the plan set in the Trigger Time field. You can set Begin Time and Granularity in the Trigger Time field. And only when Active Task is selected, the task can be executed.
Trigger Time
Begin Time
Set the begin time to import data. It is available only when Execute As Plan is selected.
Granularity
Set Granularity to import data in interval after the begin time. It is available only when Execute As Plan is selected.
Only when Use Time Filter is selected. Start Time and End Time in Import File Time Set field are available. Set the start time for filtering. Set the end time for filtering. Do not to process data file after the data is imported. Delete all data files after the data is imported.
Start Time End Time Data Process Do not process Delete all data files after importing After import, move date files to
Click
to select a path.
Move the data file to the selected directory after the data is imported.
Step 3 Type the task name, and select the directory of the file to be imported. Step 4 Select the task execution type.
z z
Select Execute At Once to import the data manually. Select Execute As Plan to import the data automatically, and set Begin Time and Granularity in Trigger Time.
Step 5 Set the filter time. Step 6 Select the data process type. Step 7 Click OK. ----End
46
Issue 01 (2007-01-19)
After the performance data is imported, select Performance Data node of a project in the Project View pane, and then select Query on the shortcut menu. The Query Result dialog box is displayed, as shown in Figure 4-9. The imported data is listed in the Query Result dialog box. Figure 4-9 Query Result dialog box
Issue 01 (2007-01-19)
47
Table 4-4 describes the elements in the Data Delete Task Setting dialog box. Table 4-4 Descriptions of the Data Delete Task Setting dialog box Element Basic Task Name Description The name of the task. The default name is Performance Data Delete. Original Data Reserved Statistical Data Reserved Execute At Once The date for reserving original data. Input 0 to delete all original data. The date for reserving statistical data. Input 0 to delete all statistical data. Execute the task at once. If you manually delete the data, select this option. Execute As Plan Execute the task according the plan set in the Trigger Time field. You can set Begin Time and Granularity in the Trigger Time field. And only when Active Task is selected, the task can be executed. Active Task Trigger Time Begin Time Only when Active Task is selected, the deleting task can be executed according to the plan. Set the begin time to delete the data. It is available only when Execute As Plan is selected.
48
Issue 01 (2007-01-19)
Element Granularity
Description Set Granularity to delete the data in interval after the begin time. It is available only when Execute As Plan is selected.
Step 3 Select the reserving time, and select the execution type. Step 4 Click OK. ----End
Issue 01 (2007-01-19)
49
Figure 4-11 Data Import Task Setting dialog boxCHR Data Import
Table 4-5 describes the elements in the Data Import Task Setting dialog box. Table 4-5 Descriptions of the Data Import Task Setting dialog box Element Basic Task Name Description The name of the task. The default name is CHR Data Import. Data Path Data Version Execute At Once Select the directory of the file to be imported. Displays the current data version information. Execute the task at once. If you manually import the data, select this option.
50
Issue 01 (2007-01-19)
Description Execute the task according the plan set in the Trigger Time field. You can set Begin Time and Granularity in the Trigger Time field. And only when Active Task is selected, the task can be executed. Set CHR Import Condition to open Set CHR Click Import Condition dialog box, as shown in Figure 4-12. Select contents to be imported, and click OK. When you import CHR data, only the selected contents are imported.
Trigger Time
Begin Time
Set the begin time to import the data. It is available only when Execute As Plan is selected.
Granularity
Set Granularity to import the data in interval after the begin time. It is available only when Execute As Plan is selected.
Only when Use Time Filter is selected, Start Time and End Time in Import File Time Set field are available. If Use Time Filter is not selected, all data of the data file are imported by default.
Start Time End Time Data Process Do not process Delete all data files after importing After import, move date files to
Set the start time for filtering. Set the end time for filtering. Do not to process data file after the data is imported. Delete all data files after the data is imported.
Click
to select a path.
Move the data file to the selected directory after the data is imported.
Issue 01 (2007-01-19)
51
Step 3 Type the task name, and select the directory of the file to be imported. Step 4 Select the task execution type.
z z
Select Execute At Once to import the data manually. Select Execute As Plan to import the data automatically, and set Begin Time and Granularity in Trigger Time.
Step 5 Select the contents of the CHR data to be imported on the Set CHR Import Condition dialog box. Step 6 Set the filter time. Step 7 Select the data process type. Step 8 Click OK. ----End
52
Issue 01 (2007-01-19)
The Data Delete Task Setting dialog box is displayed, as shown in Figure 4-13. Figure 4-13 Data Delete Task Setting dialog box
Issue 01 (2007-01-19)
53
Table 4-6 describes the elements in the Data Import Task Setting dialog box. Table 4-6 Descriptions of the Data Import Task Setting dialog box Element Basic Task Name Description The name of the task. The default name is IOS Data Import. Data Path Execute At Once Select the directory of the file to be imported. Execute the task at once. If you manually import the data, select this option. Execute As Plan Execute the task according the plan set in the Trigger Time field. You can set Begin Time and Granularity in the Trigger Time field. And only when Active Task is selected, the task can be executed.
54
Issue 01 (2007-01-19)
Description Set the begin time to import the data. It is available only when Execute As Plan is selected. Granularity Set Granularity to import the data in interval after the begin time. It is available only when Execute As Plan is selected.
Data Process
Do not process Delete all data files after importing After import, move date files to
Do not to process data file after the data is imported. Delete all data files after the data is imported.
Click
to select a path.
Move the data file to the selected directory after the data is imported.
Step 3 Type task name, and select the directory of the file to be imported. Step 4 Select task execution type.
z z
Select Execute At Once to import the data manually. Select Execute As Plan to import the data automatically, and set Begin Time and Granularity in Trigger Time.
Issue 01 (2007-01-19)
55
Table 4-7 describes the elements in the Data Delete Task Setting dialog box. Table 4-7 Descriptions of the Data Delete Task Setting dialog box Element Basic Task Name Description The name of the task. The default name is IOS Data Delete. Data Reserved Days Execute At Once The date for reserving data. Input 0 to delete all original data. Execute the task at once. If you manually delete the data, select this option. Execute As Plan Execute the task according the plan set in the Trigger Time field. You can set Begin Time and Granularity in the Trigger Time field. And only when Active Task is selected, the task can be executed. Active Task Trigger Time Begin Time Only when Active Task is selected, the deleting task can be executed according to plan. Set the begin time to delete the data. It is available only when Execute As Plan is selected.
56
Issue 01 (2007-01-19)
Element Granularity
Description Set Granularity to delete the data in interval after the begin time. It is available only when Execute As Plan is selected.
Step 3 Select the reserving time, and select the execution type. Step 4 Click OK. ----End
Issue 01 (2007-01-19)
57
Table 4-8 describes the elements in the Data Import Task Setting dialog box. Table 4-8 Descriptions of the Data Import Task Setting dialog box Element Basic Task Name Description The name of the task. The default name is RTWP Data Import. Data Path Execute At Once Select the directory of the file to be imported. Execute the task at once. If you manually import the data, select this option. Execute As Plan Execute the task according the plan set in the Trigger Time field. You can set Begin Time and Granularity in the Trigger Time field. And only when Active Task is selected, the task can be executed.
58
Issue 01 (2007-01-19)
Element TxtFile Set RNCID and CelllID Trigger Time Begin Time
Description Set the RNC ID and Cell ID that the imported RTWP data of .txt format belongs to. Only when the imported data is .txt format, this field is available. Set the begin time to import the data. It is available only when Execute As Plan is selected. Granularity Set Granularity to import data in interval after the begin time. It is available only when Execute As Plan is selected.
Data Process
Do not process Delete all data files after importing After import, move date files to
Do not to process data file after the data is imported. Delete all data files after the data is imported.
Click
to select a path.
Move the data file to the selected directory after the data is imported.
Step 3 Type the task name, and select the directory of the data to be imported. Step 4 Select the task execution type.
z z
Select Execute At Once to import the data manually. Select Execute As Plan to import the data automatically, and set Begin Time and Granularity in Trigger Time.
Step 5 Select the data process type after import setting finishes. Step 6 Click OK. ----End
Issue 01 (2007-01-19)
59
Select Execute As Plan to import the data automatically, and set Begin Time and Granularity in Trigger Time.
Step 4 Click Enter Set Form on the Data Import Task Setting dialog box. The RTWP TXT File Information dialog box is displayed, as shown Figure 4-17. Figure 4-17 RTWP TXT File Information dialog box
Table 4-9 describes the elements in the RTWP TXT File Information dialog box. Table 4-9 RTWP TXT File Information dialog box Element ROWID RNCID Description Row ID. RNC ID. Click to input the RNC ID. CELLID Cell ID. Click to input the cell ID. FILE PATH Display the directory and name of the data file.
Step 5 Input RNC ID and cell ID, click OK in the RTWP TXT File Information dialog box. Step 6 Select the data process type after data file setting finishes. Step 7 Click OK. Return to the RTWP TXT File Information dialog box. Step 8 Click OK to confirm. ----End
60
Issue 01 (2007-01-19)
Table 4-10 describes the elements in the Data Delete Task Setting dialog box. Table 4-10 Descriptions of the Data Delete Task Setting dialog box Element Basic Task Name Description The name of the task. The default name is RTWP Data Delete. Data Reserved Days Execute At Once The date for reserving the data. Input 0 to delete all original data. Execute the task at once. If you manually delete the data, select this option.
Issue 01 (2007-01-19)
61
Description Execute the task according the plan set in the Trigger Time field. You can set Begin Time and Granularity in the Trigger Time field. And only when Active Task is selected, the task can be executed. Active Task Only when Active Task is selected, the deleting task can be executed according to the plan. Set the begin time to delete the data. It is available only when Execute As Plan is selected. Granularity Set Granularity to delete the data in interval after the begin time. It is available only when Execute As Plan is selected.
Trigger Time
Begin Time
Step 3 Select the reserving time, and select the execution type. Step 4 Click OK. ----End