Rate Analysis For Centering

This document provides a rate analysis for centering and shuttering work. It lists the materials, labor, and costs required to form and remove shuttering for 1 square meter of concrete work up to 4.5 meters in height. The total estimated cost per square meter is Rs. 104 after accounting for the material costs, labor costs of fitters and beldars, maintenance costs over multiple uses, and contractor overhead and profit. Dismantling and removing the shuttering is estimated to cost Rs. 156.30 per use, with the materials assumed to last for 40 uses before becoming unserviceable.

Uploaded by

bd_gupta_3
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
8K views1 page

Rate Analysis For Centering

This document provides a rate analysis for centering and shuttering work. It lists the materials, labor, and costs required to form and remove shuttering for 1 square meter of concrete work up to 4.5 meters in height. The total estimated cost per square meter is Rs. 104 after accounting for the material costs, labor costs of fitters and beldars, maintenance costs over multiple uses, and contractor overhead and profit. Dismantling and removing the shuttering is estimated to cost Rs. 156.30 per use, with the materials assumed to last for 40 uses before becoming unserviceable.

Uploaded by

bd_gupta_3
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Rate Analysis for centering & shuttering

Rate Amount (in Rs.) (in Rs.) Centering & shuttering with plywood or steel sheets including strutting, propping, bracing bothways with wooden members and removal of formwork upto 4.50 mtr. Height above ground level, for suspended floors, roofs, landings, staircase, balconies, girders, cantilevers, bands, copings, bed plates, anchor blocks, sills chajjas, etc. Description Unit Qty.

Sl. No.

Unit = Sq.m. Taking output = 1 Sq.m Material 2 Steel Plate 3.15 mm thick @ 24.73 kg/m (2.88x24.73) = 71.22 kg Supporting Angle (35x35x5) @ 2.6 kg/m (16.4x2.6) = 42.64 kg Total Weight = 113.86 kg (including welding, nuts & bolts ect.) Add for maintenance @ 10 % Cost of Supporting Material Ballies 100 mm,75mm 3m long Total Less salvage value after full use of material @ 20 % on A Total - Part A Assuming shuttering of material will become unservicable after use of 40 times Cost for using once Carriage Labour Fitter Beldar Shuttering oil Add Overhead & Contractor's Profit 10 % Total Cost per Sqm

kg

113.86

60.00

6831.60

683.16 No 5 60.00 300.00 7814.76 -1562.95 6251.81

Once LS

1/40

156.30 15.00

Nos Nos LS

0.75 1.5

150.00 80.00

112.50 120.00 5.00 408.80 40.88 449.67 104.21

Say

104.00