Tir e C o r d L e t Of f
C o mpo u n d P r e pa r a t io n
Spl ic in g
C o mpo u n d F e e d in g
FLOW PROCESS
H e a t in g
Tir e C o r d W id t h Se t t in g C o r d -C o mpo u n d C a l e n d e r in g
Tr e a t me n t C o o l in g
Tr e a t me n t W in d in g
2
FLOW PROCESS
Cont
1. LET OFF
TOOLING DESIGN
2. SPLICING
To join / link up the fabric during cord roll replacement.
TOOLING DESIGN
4. PREHEATING
5. EXPANDER ROLL
5
TOOLING DESIGN
6. PRESSURE ROLL To press the fabric to calender roll, the pressure roll will optimize the rubber penetration to the fabric.
6
To control cord distribution on both side area (water and drive side).
TOOLING DESIGN
10. BLISTER PRICKING DEVICE To eliminate the the trapped air by pricking the treatment surface.
TOOLING DESIGN
12. WIND UP ACCUMULATOR To prepare buffer treatment during wind up treatment replacement.
TOOLING DESIGN
14. WIND UP FEED ROLL STAND To guide and hold the treatment during winded up treatment replacement.
TOOLING DESIGN
10
PROCESSING CONDITIONS
11
SETTING PARAMETERS
12
CONTROL PLAN
13
MEASURING EQUIPMENTS
14
MONITORING PROCESS
15
PFMEA
16
OPEN CORD
SCRAP IN PROCESS
17
TROUBLE SHOOTING
18
IMPROVEMENT
19