Pay Item
Description
Location No.
34.01 34.01
Stabilising of the Base with 2.5% 3.10 Zambezi cement Stabilising of the Base with 2.5% Zambezi cement Preparation of base layer
7th Aug 8th Aug 9th Aug 10th Aug 11th Aug 12th Aug 13th Aug 14th Aug 15th Aug 16th Aug 17th Aug
34.1
Ch 9+550 to Ch 9+850
Reworking low density bases Rework base; stabilising failed section Rework base; stabilising with 2% failed section
Dumping base material and pre shaping Stabilise base with 2.5 %
Reaping and Removing base material on failed reworked section Ch 9+ 400 to Ch 9+550 Roadbed watering, preshaping, levelling, processing and compaction Ch 28+675 to Ch 27+300 Roadbed watering, preshaping, levelling, processing and compaction Ch 26+800 to Km 26 + 350 Watering and recompacting failed roadbed section Ch 27+300 to Km 26+350 Stabilising base with 2.5 % zambezi cement Dumping base material
18th Aug
Roadbed watering, preshaping, levelling, processing and compaction Ch 14+175 to CH 14+400 Watering and recompacting failed roadbed section Ch 27+ 675 to Km 26+300 Roadbed watering, preshaping, levelling, processing and compaction Ch 26+400 to Km 25 + 900
Quantity Area
Volume
Length m
Width m
Working thickness
Achieved Thickness mm
Testing
300
150
1375
13.7
450 950
13.8 13.8
210 150
10.1
150
Remarks
Started mixing with reclaimer due to breakdown but finished with grader. Used reclaimer
Used reclaimer for mixing, few wet sport were seen in some sections.Did not finish on time due to water shortage.
Still low density result were obtained Low density values obtained.
Finished late due to less moisture in the material. Material was presoaked. Dumping on the reaped base section