PENGENALAN
ISU YANG TIMBUL APABILA BEKERJA DI TEMPAT TINGGI 2 Meter dan keatas pekerja cenderung untuk jatuh AKTIVITI - AKTIVITI Pembinaan, Penyelenggaraan, Pembaikpulihan, Mengecat Sektor Komunikasi, utiliti dsb PERALATAN Perancah, platform, tangga TINDAKAN PENYELAMAT & PELONGGARAN - Selusur (Railing), Jaring (Netting), Fall arrester, APD
15(3) - ..the duties is extend to independent or self employed and their workers
Seksyen 2 OSHA:
"employee" means a person who is employed for wages under a contract of service on or in connection with the work of an industry to which this Act applies and(a) who is directly employed by the principal employer .. (b) who is employed by or through an immediate employer at the place of work of the industry or under the supervision of the principal employer or his agent on work which is ordinarily part of the work of the industry or which is preliminary to the work carried on in or incidental to the purpose of the industry; or (c) (c) whose services are temporarily lent or let on hire to the principal employer by the person with whom the person whose services are so lent or let on hire has entered into a contract of service;
Seksyen 2 OSHA:
"employee" means a person who is employed for wages under a contract of service on or in connection with the work of an industry to which this Act applies and(a) who is directly employed by the principal employer .. (b) who is employed by or through an immediate employer at the place of work of the industry or under the supervision of the principal employer or his agent on work which is ordinarily part of the work of the industry or which is preliminary to the work carried on in or incidental to the purpose of the industry; or (c) (c) whose services are temporarily lent or let on hire to the principal employer by the person with whom the person whose services are so lent or let on hire has entered into a contract of service;
PELANGGAN
KONSULTASI PENGURUSAN
KONTRAKTOR UTAMA
Pekerja
Pekerja
Sub kontraktor
Pekerja
Independent Contractor
Pekerja
Sub Kontraktor
Sub kontraktor
Kontraktor Utama
Menyediakan komponen perancah
OSHA-514 PEKERJA
TANGGUNGJAWAB AM
Includes In Particular Sect 15 (2)(a) the provision and maintenance of plant and systems of work
PROSIDUR
SECTION 15 (2)(c) the provision of such information, instruction, training and supervision Penggunaan loji, jentera dan bahan Langkah kawalan, Penggunaan APD Induksi, toolbox meeting dsb
Section 15 (2)(d) Penyediaan dan penyelenggaraan laluan akses dan keluar Pemeriksaan dan penyenggaraan Percahayaan laluan > 50 lux
Section 15(2)(e) Penyediaan dan penyenggaraan persekitaran tempat kerja untuk pekerjanya
Pengudaraan Haba Pencahayaan Kelembapan Bebas dari Asap toksid Kemudahan Kebajikan
SIASATAN KEMALANGAN
PRIOR TO INCIDENT
TINDAKAN TIDAK SELAMAT KEADAAN TIDAK SELAMAT
PENTADBIRAN
KURANG PENYELIAAN PROSIDUR YANG TIDAK MENCUKUPI
TIADA LATIHAN
KURANG PENGETAHUAN
FAKTOR KEMALANGAN
PRINSIP
Salah faham undang-undang (Passing Out the Job , Pass the duty) Terma kontrak tidak jelas Keperluan OSH terlalu umum
KONTRAKTOR
Belanjawan Terhad
PENYELESAIAN
Principal Employers who is owner of Industry responsible to ensure all his workers including Contractors Workers. HOW TO ENSURE.-As far as practicable APA YANG BOLEH DILAKUKAN: MENGETAHUI RISIKO -HIRARC MAKLUM/ BERKONGSI RISIKO PEMANTAUAN / PEMERIKSAAN LAPORAN DO IT AT THE FIRST STAGE:
INCORPORATING IN OSH CONTRARCT
PUBLIC SAFETY
Generally to be fenced -Railing and toe board Stairway- railing at expose side Opening to be covered
Specification of stairway
Inclined- handrail Vertical-lSafety loops Portable ladder-equiped with non skid devices
Factory means include; any premises, place or space where any Building Operation and Works of Engineering Construction are carried out.
BOWEC
Operasi bangunan building Operations bermaksud pembinaan, pengubahan struktur, pembaikan atau penyelenggaraan bangunan (termasuk penghiasan semula, repointing dan pembersihan struktur luar), perobohan bangunan, dan penyediaan bagi meletakkan satu asas bangunan.
Pembinaan Kejuruteraan "work of engineering construction" bermaksud pembinaan, penyambungan, pemasangan, pembaikan, penyelenggaraan, pembaharuan, penyingkiran, pengubahsuaian, pengubahan, perombakan, perobohan (a) sebarang pemasangan, bangunan, struktur, tiang, menara, kaison, dinding, pagar atau cerobong, dimana dibina sepenuhnya atau separuh atas atau bawah paras bumi; (b) apa-apa kerja-kerja jalan, dok, kerja-kerja pelabuhan, landasan keretapi, tepi laluan atau talian kabel, talian trem, pelayaran pedalaman, bidang udara atau padang terbang;
Loading and Catch Platform Formwork Runway an Ramp Rubbish Chute > 15 meter
LOADING PLATFORM
Pengiraan dan Lukisan Rekabentuk oleh PE SWL (Safe Working Load) Pengadang (toe board) Penyenggaraan Kekemasan pelantar Pelantar kerja yang sesuai Laluan pelantar kerja yang selamat
Pemasangan Pengadang
Tanda amaran
Pemeriksaan dan Penyenggaraan
KESESUAIAN PEMASANGAN PENGADANG ATAU PENUTUP TANDA-TANDA AMARAN YANG SESUAI PEMERIKSAAN DAN PENYENGGARAAN
PEKERJAAN DI TEMPAT TINGGI YANG TIDAK MENGGUNAKAN PERALATAN KESELAMATAN DIRI (PPE)
Laluan keluar-masuk Pembinaan > 2 Tingkat kena buat laluan dengan perlindung atas (Overhead Protection) Laluan ke lokasi kerja (tiada apa-apa pepasangan yang menghalang laluan) Pemeriksaan dan penyenggaraan Percahayaan laluan > 50 lux
SELAMAT KE?
TANDA-TANDA AMARAN
DAN KAWALAN
LALULINTAS
Kawalan Memasuki KawASAN Kerja Yg Baik (Sistem & Pengawal, Pagar Dll)
Pagar Adang
permukaan
Kawalan Memasuki Kaw. Kerja Yg Baik (Sistem & Pengawal, Pagar Dll)
KESELAMATAN ELEKTRIK
Sambungan(Sakit Mata)
Pembuangan sisa bahan-bahan binaan Pelongsor sampah (chute) Ketinggian bangunan > 12 m Perlu dapatkan pengesahan rekabentuk daripada Jurutera yg bertauliah.
PENYIMPANAN BAHAN
Tempat penyimpanan yang sesuai/stor Timbunan bahan disusun dalam keadaan stabil Pemeriksaan dan senggaraan Kekemasan dan kebersihan tempat simpanan Tidak boleh disimpan atau diletakkan terlalu dekat dengan tepi lantai/platform Disimpan di atas lantai/pelantar tidak melebihi SWL (Safe Working Load)
Peti pertolongan cemas (Per. 38(2)(1) SHW, 1970) - Minima 13 item (Jadual Ke-4) Kemudahan tempat makan, minum, tandas & berehat Kawalan bawaan vektor (nyamuk, tikus, lipas dll) Tanda-tanda amaran yang sesuai Pemeriksaan kesihatan pekerja
FORMWORK
Penanggalan Pemasangan mengikut spesifikasi rekabentuk Pemeriksaan (Sebelum, Semasa & Selepas) Orang yang bertanggungjawab Penyediaan laluan yang selamat
PERANCAH
Perancah merupakan struktur sementara yang disediakan untuk : i) Pekerja berdiri diatasnya untuk melakukan kerja ii) Laluan atau akses kepada pekerja atau membawa bahan-bahan ke tempat kerja termasuk platform kerja, laluan titian, landasan dan tangga iii) Aktiviti loading / unloading bahan-bahan binaan dan lain-lain logistik yang diperlukan oleh pekerja
HUBUNGKAIT KONTRAKTOR UTAMA DAN SUB KONTRAKTOR SEMASA PEMASANGAN PERANCAH DAN PELANTAR KERJA DI TAPAK BINA
Sub Kontraktor
Kontraktor Utama
Sub kontraktor
100%
45% 47%
73%
70%
NO SUITABLE SIGNAGE/TAGGING
PEMBINAAN PERANCAH
SCAFFOLD FOUNDATION
- Keadaan
KOMPONEN PERANCAH
Cross brace karat dan bengkok
PELANTAR KERJA
-Dipasang menggunakan 1 plank -Tiada guard rail and toe board - Tidak mematuhi P 86 Bowec
FIKIR-FIKIRKANLAH
If you think SAFETY is expensive...