JSA FORMAT

JOB SAFETY ANALYSIS

Job Task Material Shifting through loading from Yard & Unloading at Place. Equipment: Hydra

Project Location: NKP/ FGD/ Unit#1/ 0 meter Analysis done by: ML. suman Reviewed by: Rhul baghat/Amit kr. Gupta

PPE required: As mentioned in PPE Column Date Initiated: 07-11-2020 Revised date: 00
Emergency Plan:
Tools used: Ceiling Rope,D shackle, Hydra/Crane ,Trailer. Chemical used: NA

Sequence of Job Step Potential Hazards Safety Precaution PPE

1.MaterialLifting - Personal injury 1. Proper lifting arrangement. 1. Safety Shoe


- Damage to Material/Equipment. 2. Flag man/Signal man. 2. Safety Helmet
3. Ensuring restricted movement of unauthorized 3. Hand gloves
person(Caution board or barricading). 4. Goggles
4. Ensuring use of T&P certified by authorized HSE personnel. 5. Nose mask
6. Reflective Vest.
2. Material Transportation - Fall of material from trailer. 1. Proper lashing/tying, Do
- Toppling of Trailer. 2. Flag man/Signal man.
- Personal injury due to 3.No Over hung materials,
a) fall of material 4. No over Load& Uneven loading.
b) Collision with Trailer 5. Proper road condition for safe load movement.
3. Materials Unloading/Stacking. - Personal injury 1. Proper lifting arrangement. Do
- Damage to Material/Equipment. 2. Flag man/Signal man.
3. Ensuring restricted movement of unauthorized person
(Caution board or barricading).
4. Ensuring use of T&P certified by authorized HSE personnel.
5. Ensure stacking on level ground with slippers wherever
necessary.
4. Material Transportation to the yard - Fall of material from trailer. 1. Proper lashing/tying, 1. Safety Shoe
location at which the material will be - Toppling of Trailer. 2. Flag man/Signal man. 2. Safety Helmet
stored - Personal injury due to 3.No Over hung materials, 3. Hand gloves
a) fall of material 4. No over Load & Uneven loading. 4. Goggles
b) Collision with Trailer 5. Nose mask
5.Material Lifting from truck/Trailor - Personal injury 1. Proper lifting arrangement.
- Damage to Material/Equipment. 2. Flag man/Signal man.
3. Ensuring restricted movement of unauthorized person
(Caution board or barricading).
6. Materials Unloading/Stacking. - Personal injury 1. Proper lifting arrangement. Do
- Damage to Material/Equipment. 2. Flag man/Signal man.
3. Ensuring restricted movement of unauthorized person
(Caution board or barricading).
4. Ensuring use of T&P certified by authorized HSE personnel.
5. Ensure stacking on level ground with slippers wherever
necessary.

Vendor Safety Officer Vendor Field Engineer