The JSA document provides safety guidelines for fire proofing works. It identifies potential hazards such as falling, tripping, improper equipment, and lack of training. It then lists mitigation measures to reduce risks such as ensuring proper permits and procedures are followed, equipment is inspected, the work area is barricaded, and personnel are trained and use appropriate PPE. Emergency response plans and communication protocols are also established to quickly address any incidents.
The JSA document provides safety guidelines for fire proofing works. It identifies potential hazards such as falling, tripping, improper equipment, and lack of training. It then lists mitigation measures to reduce risks such as ensuring proper permits and procedures are followed, equipment is inspected, the work area is barricaded, and personnel are trained and use appropriate PPE. Emergency response plans and communication protocols are also established to quickly address any incidents.
The JSA document provides safety guidelines for fire proofing works. It identifies potential hazards such as falling, tripping, improper equipment, and lack of training. It then lists mitigation measures to reduce risks such as ensuring proper permits and procedures are followed, equipment is inspected, the work area is barricaded, and personnel are trained and use appropriate PPE. Emergency response plans and communication protocols are also established to quickly address any incidents.
Activity: FIRE PROOFING WORKS 016 Rev. 00 GC 32 – NEW GATHERING CENTRE FOR SEK EF 1931 / JI Project Title: Project No: JI - 2035 2035 Site/Facility: Work Area: AREA-2, ISBL Permit No:
KOC Emergency Contact Number: 160
Date: 972 99 100 (Mobile) Hard Hat, Safety Shoes, Safety Goggles, Hand Gloves, Covera Personal Protective Equipment’s: disposable coverall, ear plugs, respiratory protections, full body harnes etc. RESIDUA RISK RISK JOB STEPS POTENTIAL HAZARDS MITIGATION MEASURES RATING RATING Pre - work Permit to Work procedure (KOC.SA.004) shall be complied. Mobile Equipment procedure Non-compliance of KOC Mediu (KOC.SA.013) shall be complied. Low HSEMS Procedure m Working at Height Procedure (koc.sa.031) shall be complied. Waste Handling Procedure (KOC.EV.008) shall be complied. Poor Task Planning Medium Physically check all equipment tools Low Defective tools by an authorized person and ensure Unauthorized personnel color coding. Ensure pre-task briefing before fire proofing activity about the safe procedure and prior inspection of equipment to be carried out. All equipment to have KOC CC and the same shall be displayed with equipment. Conduct TBT and ensure that PPE appropriate to the work to be undertaken is correctly identified and used. Ensure the equipment and tool to be used are free from defect. Ensures all hoses and connections are properly crimped and jubilee clip shall not be used. Ensure all emergency exits at work location are not blocked. Personnel trained as per training matrix. Ensure the area is fully barricaded and adequate signage’s posted around
Page 1 of 5 JSA No. EF 1931-HSE-016; Rev-00
the working area. First Aid kit and trained first aider shall always be available at the work location. Ensure gas testing is carried out to confirm free from flammable / toxic vapor. Only authorized personnel shall be allowed near the work area. Ensure all personnel have completed safety awareness trainings as per Untrained Personnel and training matrix. Medium Low Poor supervision Ensure supervisor on site and workers involved in fire proofing are trained & competent to carry out the work safely. Adequate number of lighting plants shall be placed. Reflector coveralls / jackets shall be Working at night Medium Low provided to the crew members. White glass shall be provided to all crew members. Ensure that the Emergency Numbers are posted at site, and personnel are informed in during the TBT. Lack of ERP All incidents and emergencies to be Lack of adequate Medium communicated to KOC Emergency Low communication number – 160. All incidents and emergencies to be communicated to PIL Emergency number – 900 30 980. Ensure barricading of area with authorized personnel entry. Tool box talk to discuss pinch points and drop objects. Only competent and authorized Trip hazard personnel to set up the equipment. Setting of Pinch point Medium Equipment KOC CC to be displayed Low Equipment’s Drop objects on air compressors, Generator sets, hopper, etc. Ensure earthing connections are properly fixed. Ensure proper hoisting of equipment at height. Proper planning of work and provision Low Medium of fall protection materials including Working at Fall of person working at lanyards, snap hooks, full body safety Height height harness has been provided to all Fall of object from person workers involved. working Ensure that a personal fall arrest system is in place and available to all Trip/Slip hazards workers involved, including but not limited to anchorage connector, full Page 2 of 5 JSA No. EF 1931-HSE-016; Rev-00 body safety harness, lanyard etc. Supervisor to ensure that workers assigned for the work are well trained and highly competent in this type of work, 100 % tie-off to maintained. Conduct a toolbox talk briefing workers on potential hazards and precautionary measures required for working at height has been made clear to all workers to be involved in the work. All tools and materials shall be placed in a safe container and properly secured throughout the duration of work at height. Hand tools used during the work must have a lanyard attached. Ensure the work area to be free from all slip/trip hazard. and proper access is made available for all workers at height. Ensure that all precautionary measures required for the safe execution of work at height has been taken prior to start of work. Fixing of Ensure sharp edges of the object are Sharp edge Wire Mesh protected by means of softener. and Fire Pinch Point Ensure proper whiplash arrestor Proofing provided to pressurized hose. Caught by, striking, crushing Ensure wire mesh properly fixed before starting the fire proofing. Stored Energy Ensure chemical mixing are perform Irritation as per manufacturer recommendation. Ensure all involve personnel adhere to Fire approved and mandatory PPE’s requirements while performing fire proofing works. Ensure equipment and vessel is temporarily grounded to prevent static electricity hazards. Ensure first aid box and trained first aider shall be available. Ensure enough number fire extinguisher available to the work location. Eye wash station shall be positioned at work location. Respiratory protection shall be readily available for issuance to workers as needed as per the SDS. Ensure access/egress are always free of obstruction.
Page 3 of 5 JSA No. EF 1931-HSE-016; Rev-00
Ensure job perform under the present of competent supervisor or WSS. Obtain SDS for the paint as well as thinner. Wear the required PPE (Long Sleeve Coverall, Apron, Face Shield & suitable respiratory protection etc.). Ensure there is no naked flame or spark generating equipment in the area where spray painting is to be done. Keep the suitable fire extinguishers in Exposure to Harmful ready condition. Vapor Do not eat or smoke wearing a paint- Fire & Explosion Medium soaked coverall / gloves Low Contaminated Clothing Clean / dispose safely the paint- Un-attended Equipment / soaked coverall / gloves. Painting Tool Wash properly before consuming any Unsafe Storage of Paint food. & Thinner Do not leave unattended the Spray Paint Gun & Hose with on condition. Isolate the equipment from all source of energy when not in use. Store the paint & thinners in safe & designated location away from source of ignition. Slip/Trip/Fall Ensure the workplace is maintained House Personnel injury due to Low clear of debris, waste at all stages of Low Keeping poor house keeping job. Ensure workers are training for heat stroke and heat extortion Ensure workers are medically fit for the job Additional Ensure adequate resting and welfare facility provided at the site Hazards Extreme weather Ensure trained first aider with (Other than condition Medium Low adequate filled content of first aid kit is indicated Heat Stroke/Extortion available at site. above) Ensure sufficient/ enough cool drinking water available at site. Ensure toilet facility available at site in compliance with KOC.HE.025 procedure.