Project Location: INDMAX PRIME-G, IGHDS UNIT, IOCL, BGR JSA No.: 48
Thermite welding mold, Chisel, Hammer, Plier, Screw driver set,
P&M and
Spanners, Cable Cutter, Hacksaw, Crimping tools, Spade, Grab Hoe,
Equipment, Tools & Rev. No.: 00
tackles involved Knife, Auger, Spade, Shovel, Mattock
SL. Sequence of Tools & tackles used Hazards involved at Risk Safety measures / precautions Risk Responsib
NO Operation – and manpower various steps level level ility Action
Activity Steps deployed H/M/ after by
L contr
ol
1 Place the Thermite welding Fire, Smoke, Burn ➢ Proper PPE should use to Site
cables on the Mold, hammer. Spillage of weld metal perform the job Engineer
mold, place the Chisel, coating from the mold exit ➢ MSDS should be submitted
steel disc on marker, sandpaper hole to TP
the tap hole and wire brush. ➢ Use proper respiratory
H L
and pour the ➢ Avoid direct contact with
exothermic weld metal powder
metal powder
in the mold.
Page 1 of 4
2 Place 50% Fire, Smoke, Burn Site
starting powder in Thermite welding Spillage of weld metal ➢ Fire watcher with fire Engineer
the mold & close Mold, hammer. from the mold exit extinguisher should be
the mold lid .and Chisel, coating hole available on the job
pour the marker, sandpaper location.
remaining starting and wire brush ➢ Make sure the exit hole of
powder on cover the mold is in the opposite
of the mold. & direction from the operator
Ignite ➢ Proper PPE Should be
used by the operator
➢ Make sure area is clear
from the combustible
material.
➢ Only competent person L
should perform the activity.
➢ Close supervision by the
supervisor should be
available.
➢ Barricade the area with
signage
➢ From work area &
firefighting equipment to be
provided like fire
extinguisher, sand bucket&
running fire hose.
Page 2 of 4
and Calibration certificates
are available at site.
Note: a) Ensure Daily JSTI meeting attended by all personnel's before starting any work activities.
b) Job Safety Analysis must be discussed during JSTI meetings.
c) Responsibility of overcoming the hazards lies with the concerned Engineer, supervisor, Foreman and workmen.
d) Ensure skilled and trained manpower for the job.
f) Job specific PPE must be worn.
g) Required job/ Work Permit shall be obtained from concern authority.
h) All persons involved in cable pulling should were full body harness and ensure 100% tie off when working on elevated areas.