Professional Documents
Culture Documents
SUPERVISOR
Paper 2B (Presentation Test)
Title: Concrete Safety
Name: Muhammad Asyraf Bin Azhar
IC no: 890816-14-6473
Index no: SSS 6419
Tool box briefing
1. Only authorized person can allow to enter the site
2. Wear appropriate Personal Protective Equipment according to the suitability of the work
3. If concrete came in contact with skin, please go to the wash area to clean it
4. If there’s an emergency, please go to the assembly point and follow the instructions
Introduction
Concrete is a construction material composed of cement, fine aggregates
(sand) and coarse aggregates mixed with water which hardens with time
Activities done using a concrete at construction site:
1. Preparation of the concrete mix
2. Delivery of the mix to the construction site
3. Compaction of the mix in the formwork
4. The curing of the concrete
5. Quality control of the concrete work
Objective
7. Distribute concrete i. Awkward body i. Over exertion and i. To get rest, not to
across the foundation position muscle strain continue if exhausted
slab ii. Carry excessive load ii. Back pain and slipped and change worker
iii. Exposure to vibration disc ii. Practice proper way
iv. Repetitive action iii. Hand-arm vibration to handle concrete
v. Heat exposure iv. Heat stroke iii. Access to drinking
water and adequate
frequent drinking
8. Curing work i. Slippery, uneven i. Sprain ankle and fall i. Put a signage
surface
Job step Hazard Effect Control measure
9. Cart away earth or i. Dust exposure i. Lung cancer i. Wear dusk mask
debris ii. Heavy load ii. Back pain and ii. All debris or rebar
slipped disc being stockpiled
shall be remove
away from site
iii. Dump at designated
safe area
iv. Use more then one
person to carry
heavy load
10. Barricade and put i. Dust exposure i. Lung cancer i. Wear dusk mask
safety signage ii. Exposure to heat ii. Dehydration ii. Access to drinking
water and adequate
frequent drinking
11. Clean and keep tools i. Tools scatter on the i. Slips, trip and fall i. Stack the tools
and machinery at the floor neatly
store ii. Keep records (in and
out)
12. Cancel off Permit to
work
Conclusion
Concrete work involves many activities