JOB SAFETY ANALYSIS REPORT

Job Title: Electrical Work .Date of Job Analysis:


Project name: Iskcon Mayapur Project Analyst/ Reviewer: Ranjan Moulick
Description of Job: Light Fixture Installation.
Sequence of job steps Risks identified Precautions advised

A)Marking of Location of light A) A)


fittings & drilling of holes for i. Striking against object / working platform
fixing light fitting fellow workmen ii. Make sure the ladder is placed on
Tripping due to obstruction in firm ground
your path iii. Make sure the wheels are locked
Improper placing of properly in case of mobile working
Scaffolding / Working platform platform
Person may fall due to slip or iv. Provide hand rails to the
improper gripping. Scaffolding /Working platform
Fall from height. Make sure no person is coming to
your path.
v. Maintain good housekeeping &
supervision.
vi. Ensure proper holding & tying of
the material
vii. Ensure proper supervision &
experienced rigging
viii. Ensure proper PPE’s during the
job.

B) Marking location of light B) B)


fittings on the tiles/Gypsum i. Improper placing of ladder / i. Check the condition of ladder /
Sheet of suspended ceiling. Working platform working platform
ii. Person may fall due to slip or ii. Make sure the ladder is placed on
improper gripping firm ground
iii. Fall from height iii. Make sure the wheels are locked
iv. Inadequate illumination properly in case of mobile working
v. Fall of equipment due to platform
wrong manual handling iv. Ensure good condition of Handrail
equipment / tool failure in the working platform
vi. Injury due to loose griping, v. Use Safety belt properly hooked
broken hand tools, fall of while working at height if required.
material etc. Arrange proper lighting
Sequence of job steps Risks identified Precautions advised
vii. Tripping due to obstruction vi. Usage of slip resistance safety shoe
in your path Maintain the thumb rule of three point
contact while ascending
C) Cut tiles/ gypsum sheet or
wall ( If required) to the size of C) C)
light fittings i. Improper placing of ladder / i. Check the condition of ladder /
Working platform working platform
ii. Person may fall due to slip or ii. Make sure the ladder is placed on
improper gripping firm ground
iii. Inadequate illumination iii. Make sure the wheels are locked
iv. Fall of equipment due to properly in case of mobile working
wrong platform
iv. Adequate illumination provided.
v. Use of all necessary PPE’s.

D) Drilling of holes. D) D)
i. Improper placing of ladder / i. Check the condition of ladder /
Working platform working platform
ii. Person may fall due to slip. ii. Make sure the ladder is placed on
iii. Inadequate illumination firm ground
iv. Eye Injury. iii. Make sure the wheels are locked
properly in case of mobile working
platform
iv. Adequate illumination provided.
v. Use of all necessary PPE’s like
Safety shoe, helmet, safety belt,
goggles etc.
vi. Inspection all the tools before
using.

E) Hang the light fittings on the E) E)


chain & adjust the height so that, i. Improper placing of ladder / i. Check the condition of ladder /
fitting is in line with bottom Working platform working platform
surface of ceiling tile/gypsum ii. Person may fall due to slip or ii. Make sure the ladder is placed on
sheet improper gripping firm ground
iii. Inadequate illumination iii. Make sure the wheels are locked
iv. Fall of equipment due to properly in case of mobile working
wrong platform
iv. Adequate illumination provided.
v. Use of all necessary PPE’s.
Sequence of job steps Risks identified Precautions advised

F) Take the wires inside the light F) F)


fitting, flexible conduit fit to light i. Electrical Shock / i. Use of Proper PPEs
fitting. All the joints should be Electrocution ii. Experienced & trained workmen
inside the Fitting ii. Flash Burn Injury iii. Proper supervision & maintenance
Fire due to Flash Off iv. Make sure no person is coming to
your path.
v. Maintain good housekeeping.
vi. Any rectification job should be
done only after proper shut down
Working only under strict supervision

G) Connect wires to the terminals G) G)


of light fitting i. Electrical Shock / i. Use of Proper PPEs
Electrocution ii. Experienced & trained workmen
ii. Flash Burn Injury iii. Proper supervision & maintenance
Fire due to Flash Off iv. Make sure no person is coming to
your path.
v. Maintain good housekeeping.
vi. Any rectification job should be
done only after proper shut down
Working only under strict supervision
Suggested safe system of work
 Plan for safe movement of Equipment at the work place.
 Check the access condition, electrical connections & tool condition prior to use.
 Ascend / descend cautiously
 Use properly hooked safety belt if you require to work at more than 2M of height
 Placing of Ladder / working platform should be on firm base.
 Locking of wheels is to be ensured.
 Ensure Electrical & Fire safety.
 Ensure proper PPEs & strict supervision

Suggested Review date: (if required)


As and when required.
Suggested further job safety instructions: (if required)
 Take utmost care during fixing the light fixtures.
 Ensure all the safety measures suggested during the work.
Suggested training programmes: (Tool Box Talks)
 Working at height,
 Safe Working with tools,
 Safe material handling

Reviewed by: Ranjan Moulick

Safety Officer : Surajit Singha Approved by: Arun Ambrayath Nair