Professional Documents
Culture Documents
PROJECT: PRIVATISATION OF SUNGAI BESI – ULU DESCRIPTION OF JOB: INSTALLATION OF TAKO RAISED FLOOR SYSTEM PREPARED BY: FIRZANAH (QAQC)
KELANG ELEVATED EKSPRESSWAY (SUKE)
PACKAGE: TP1
REVIEWED BY: MUQSIT (SHO)
LOCATION: SUPERVISION BUILDING HIRARC NO:028 REV NO:00
TYPE OF ACTIVITIES: Routine / Non Routine / DATE:27/11/2021 PAGES: 1 of 2 APPROVED BY: MOHD NOOR (PM)
Emergency
REVISED RESIDUAL
HAZARD IDENTIFICATION RISK ASSESSMENT
LEGAL RISK RATING
HIERARCHY
Risk Rating ADDITIONAL & Risk Rating
OF RESPONSIBLE
PXS CONTROL MEASURES OTHER PXS
Job Risk (R) & CONTROL PERSON
Hazard P S REQ P S
No Sequence/Steps Opportunity (O)
Score Level Score Level
1 Preparation works i. Slip and (R): Bodily injury 3 2 6 M 5,6 i. Remind workers to do daily OSHA 3 1 3 L i. SE
trip falling housekeeping 1994 – ii.SS
hazard ii. Wearing proper PPE Act 514 iii. SSS
FMA iv. W
1967 –
Act 139
2 Setting out and i. Awkward (R)i. Back pain 2 3 6 M 5,6 i. Educate workers on health OSHA 1 2 2 L i. S
marking posture (O): Safety briefing consequences 1994 – E
and toolbox meeting ii. Wear back support Act 514 ii.SS
FMA iii. SSS
1967 – iv. W
Act 139
3 Install pedestal base i.Usage of (R)i. Dizziness and 2 4 8 M 5,6 i.Monitor the usage of glue OSHA 1 3 3 L i. SE
glue and intoxicated ii. Wear appropriate PPE to 1994 – ii.SS
other (O): Safety briefing avoid direct inhale Act 514 iii. SSS
chemical and toolbox meeting FMA iv. W
1967 –
Act 139
4 Installation of floor i. Usage of (R)i.Finger injury 3 2 6 M 6 i. Wear suitable gloves OSHA 1 2 2 L i. SE
panel sharp tools ii. Backpain and 2 3 6 M 6 Ii. Wear back support 1994 – 1 2 2 L ii.SS
-Cutting of panel and fatigueness Act 514 iii. SSS
-Install panel machine iii. Finger stuck 3 2 6 M FMA 3 1 3 L iv. W
ii. Awkward between panel 1967 –
posture Act 139
PROJECT: PRIVATISATION OF SUNGAI BESI – ULU DESCRIPTION OF JOB: INSTALLATION OF TAKO RAISED FLOOR SYSTEM PREPARED BY: FIRZANAH (QAQC)
KELANG ELEVATED EKSPRESSWAY (SUKE)
PACKAGE: TP1
REVIEWED BY: MUQSIT (SHO)
LOCATION: SUPERVISION BUILDING HIRARC NO:028 REV NO:00
TYPE OF ACTIVITIES: Routine / Non Routine / DATE:27/11/2021 PAGES: 2 of 2 APPROVED BY: MOHD NOOR (PM)
Emergency
REVISED RESIDUAL
HAZARD IDENTIFICATION RISK ASSESSMENT
LEGAL RISK RATING
HIERARCHY
Risk Rating ADDITIONAL & Risk Rating
OF RESPONSIBLE
PXS CONTROL MEASURES OTHER PXS
Job Risk (R) & CONTROL PERSON
Hazard P S REQ P S
No Sequence/Steps Opportunity (O)
Score Level Score Level
iii. Laying of
floor panel
3 Housekeeping i. Slip and (R): Bodily injury 3 2 6 M 5,6 i. Remind workers to do daily OSHA 3 1 3 L i. SE
trip falling housekeeping 1994 – ii.SS
hazard ii. Wearing proper PPE Act 514 iii. SSS
FMA iv. W
1967 –
Act 139
Financial Less than RM 50k RM 50k to RM 250k RM 250k to RM 1.0M RM 1.0M to RM 10M More than RM 10M
Safety None First Aid required Medical treatment required Serious injury A fatality case
Programme Less than 1 week 1 – 4 weeks 1 – 3 Months 3 – 6 Months More than 6 Months
Moderate to high damage
Minor damage some repairs Significant/ permanent Widespread, substantial/
Third Party Impact Negligible damage requires specialist to
required damage permanent damage
repair
Slight contamination of spoils
Contamination/pollution Major source of contamination
Minor contamination of at work area – some Catastrophic environmental
Environmental Impact into public space causing causing adverse public health
spoils at work area precautions necessary result damage
public nuisance/discomfort & well being
in slight delay
Almost certain – happens
5 frequently (more than 10 times Medium High High Very High Very High
within the project)
Very Likely – could happen
4 frequently (more than 3 times Low Medium High High Very High
LIKELIHOOD
Note:
1. Legend for Responsibility: PM – Project Manager, PE – Project Engineer, SS- Site Supervisor, ESHO – ESH Officer, ESHS – ESH Supervisor, TMO- Traffic Management Officer,
FM – Flagman, AGT- Authorize Gas Tester, ES – Entry Supervisor, MO – Machine Operator, BA- Banksman, DI – Designated Inspector, SC - Subcontractor, W – Worker, All – All
personnel.