Professional Documents
Culture Documents
I-444
Qty
Installed kw
Location of Drive
a)
1 2 1 4 2
60 15 7.5 2 1
IMWLS-1 (Silo Complex) IMWLS-1 (Silo Complex) IMWLS-1 (Silo Complex) IMWLS-1 (Silo Complex) IMWLS-1 (Silo Complex)
0.5
0.5
Control Cabin CC-2 near Weigh Bridge ---------do--------IMWLS-1 (Silo Complex)- Control Cabin-CC-1
3.7
3.7
---------do---------
1 1 1
3.7 15 3.7+1.5 15
3.7 15 5.2 15
Control Cabin CC-2 near Weigh Bridge ---------do--------IMWLS-1 (Silo Complex) IMWLS-1 (Silo Complex) IMWLS-1 (Silo Complex) Separate Package for Lift Under Wagon Loading Station Package ---------do---------
b)
Future 1 2 1 4 2 1 1 1 1 1
60 7.5 7.5 0.5 0.5 0.5 3.7 3.7 15 3.7+1.5 15
IMWLS-2 (Silo Complex) IMWLS-2 (Silo Complex) IMWLS-2 (Silo Complex) IMWLS-2 (Silo Complex) IMWLS-2 (Silo Complex) IMWLS-2 (Silo Complex) IMWLS-2 (Silo Complex)
Wegh Bridge Cabin Future IMWLS-2 (Silo Complex) IMWLS-2 (Silo Complex) IMWLS-2 (Silo Complex) Future Future Future
Page 1 of 1
11/08/2010