Karaikal Port Project

Coal Handling Facility (Ph-II)

Electric Load List # 3 ( In -motion Wagon loading Station)


Date: 10/08/2010

I-444

S.No. Eqpt. Description

Qty

Installed kw

Total Installed Power

Location of Drive

Remarks Under Phase-II OF Coal Handling Facility

a)

In- motion Wagon Loading Station # IMWLS-1


1 Hydraulic Power Pack 2 Vent Filters# VF-1/2 3 Air Compressor 4 Load Cell Assembly 5 Level Indicator

1 2 1 4 2

60 7.5 7.5 0.5 0.5

60 15 7.5 2 1

IMWLS-1 (Silo Complex) IMWLS-1 (Silo Complex) IMWLS-1 (Silo Complex) IMWLS-1 (Silo Complex) IMWLS-1 (Silo Complex)

Under Wagon Loading Station Package ---------do-----------------do-----------------do-----------------do---------

6 Inmotion weigh bridge

0.5

0.5

Control Cabin CC-2 near Weigh Bridge ---------do--------IMWLS-1 (Silo Complex)- Control Cabin-CC-1

7 A/C unit for Cabin # CC-1

3.7

3.7

---------do---------

8 A/C unit for Cabin # CC-2 9 Lift

1 1 1

3.7 15 3.7+1.5 15

3.7 15 5.2 15

Control Cabin CC-2 near Weigh Bridge ---------do--------IMWLS-1 (Silo Complex) IMWLS-1 (Silo Complex) IMWLS-1 (Silo Complex) Separate Package for Lift Under Wagon Loading Station Package ---------do---------

10 Electric Host 11 Miscellaneous Load

b)

In- motion Wagon Loading Station # IMWLS-2


1 Hydraulic Power Pack 2 Vent Filters# VF-1/2 3 Air Compressor 4 Load Cell Assembly 5 Level Indicator 6 Inmotion weigh bridge 7 A/C unit for Cabin # CC-1 8 A/C unit for Cabin # CC-2 9 Lift

Future 1 2 1 4 2 1 1 1 1 1
60 7.5 7.5 0.5 0.5 0.5 3.7 3.7 15 3.7+1.5 15

60 15 7.5 2 1 0.5 3.7 3.7 15 5.2 15

IMWLS-2 (Silo Complex) IMWLS-2 (Silo Complex) IMWLS-2 (Silo Complex) IMWLS-2 (Silo Complex) IMWLS-2 (Silo Complex) IMWLS-2 (Silo Complex) IMWLS-2 (Silo Complex)

Future Future Future Future Future Future Future

Wegh Bridge Cabin Future IMWLS-2 (Silo Complex) IMWLS-2 (Silo Complex) IMWLS-2 (Silo Complex) Future Future Future

10 Electric Host 11 Miscellaneous Load

HOWE (INDIA) PVT LTD

Page 1 of 1

11/08/2010