Class 9

Introduction to RDAP

Demo Pole and System


7' b 2' a c 4'

D1

4' 4' n 25'

6000'

D2

9000 kVA, 0.9 lag

First Time RDAP


Create a system Create spacing Create configuration Create substation Create feeder Input line segment data Input spot load data Run analysis

Homework #6
Problem 4.4
Config 4.1 - Three-phase from Prob. 4.1 Config 4.2 - Two-phase from Prob. 4.2 Config 4.3 - One-phase from Prob. 4.3

First RDAP System

First RDAP System


12.47 kV Substation 6000' Config 4.1

400 kW 300 kvar

2000' Config 4.3

7500 kVA, 0.9 PF (Three-phase) 4000' Config 4.2

1000 kW, 0.95 lag - Phase a 750 kW, 0.8 lag - Phase c