You are on page 1of 4

LOADING MONITORING AT TRANSHIPMENT POINT

VOYAGE NAME
VESSEL NAME
SHIPPER
INVOICE/PAY
CONTRACT DATE
SURVEYOR
QUALITY

:
:
:
:
:
:

MV. Pacific Primate


PT. PPS

Sucofindo

NO
TUG BOAT
BARGE
1 Danni A
Danni 14
2 Lintas Samudra 26 Lintas Samudra 12
3 WIRATIMUR 12
WIRATIMUR 21
4
5
6
7
8
9
10
TOTAL CARGO (MT) :

PORT
ARRIVED
PRATIQUE GRANTED
NOR TENDERED
NOR ACCEPTED
LAYTIME
COMM. LOADING
COMP. LOADING
CARGO
ALONG SIDE
PLAN
ACTUAL
DATE
TIME
5,000.000
5,030.472
24-Feb-10
16:00
5,000.000 27-Feb-10
21:00
5,000.000 -

15,000.000

:
:
:
:
:
:
:
:

Muara Jawa
TOTAL CARGO
: 17,017.000 MT
24-Feb-10 5:54
LOADING RATE
: 8,000.000 MT/day
24-Jun-06 5:54
DEMM. RATE
: $ 10,000.00
24-Jun-06 5:54
DESP. RATE
: $ 5,000.00
25-Jun-06 17:00
KURS
: Rp 9,100.00
24-Jun-06 17:54
25-Jun-06 17:00
27-Jun-06 20:30
COMMENCED LOAD
COMPLETED LOAD
CAST OFF
CARGO
DATE
TIME
DATE
TIME
DATE
TIME
RETURN
25-Feb-10
10:55 27-Feb-10
19:25 28-Feb-10
1:00
0.000
- 0.000
- 0.000

5,030.472

TOTAL (MT) :

0.000

VESSEL LOADING PROGRESS


TIME
Time Allowed

2.127 day

DAY

Time Used
Despatch Time

:
:

0.000 day
2.127 day

Saturday

Despatch

by MYI

DATE
24-Jun-06

FROM
5:54

TO

REMARK
5:54 Ship arrived

PERCENT
TO COUNT

TOTAL
JAM

TOTAL
DAYS

0%

00:00

0.000

TOTAL :

00:00

0.000

: $ 10,635.63
Rp 96,784,187.50

THE CERTIFICATE OF ANALYSIS


Total Moisture (arb)
:
Inherent Moisture (adb)
:
Ash Content (adb)
:
Volatile Matter (adb)
:
Fixed Carbon (adb)
:
Total Sulphur (adb)
:
Gross Calorific Value (adb)
:
Hargrove Grindability Index / HGI
:
Ash Fusion Temperature
(Initial Deform Temp, Reducing Atmosphere
:
Size
0 - 50 mm
:
50-100 mm
:

25.9
16.0
2.6
39.4
42.0
0.21
5756
45

PCT
PCT
PCT
PCT
PCT
PCT
Kcal/Kg

1160 deg. Cel


95.0
5.0

LOADING MONITORING AT TRANSHIPMENT POINT


VOYAGE NAME
VESSEL NAME
SHIPPER
INVOICE/PAY
CONTRACT DATE
SURVEYOR

:
:
:
:
:
:

40
MV. BEI JI ZHOU
PT. PADANG KARUNIA

PORT
ARRIVED
PRATIQUE GRANTED
NOR TENDERED
NOR ACCEPTED
LAYTIME

SUCOFINDO LABORATORY

QUALITY

NO
1
2
3
4
5
6
7
8
9
10

TUG BOAT
KSA 02
WIRATIMUR 18
PRATAMA 9
CAKRAWALA 3
WIRATIMUR 2
CERIA
WIRATIMUR 5

BARGE
BOSS 2301
WIRATIMUR 19
PROFIT 24
WIRATIMUR 21
WIRATIMUR 15
ESP 2205
WIRATIMUR 16

TOTAL CARGO (MT) :

CARGO
PLAN
ACTUAL
3,300.000
3,359.680
3,450.000
3,569.260
3,450.000
3,332.995
3,400.000
3,497.342
3,400.000
3,481.329
3,000.000
2,921.203
3,000.000
3,123.721

23,000.000

:
:
:
:
:
:

MUARA BERAU
29-Jun-06
9:20
29-Jun-06
9:20
29-Jun-06
9:20
29-Jun-06
21:20
29-Jun-06
21:20

COMM. LOADING
: 30-Jun-06
18:40
COMP. LOADING
: 7-Jul-06
1:35
ALONG SIDE
COMMENCED LOAD
DATE
TIME
DATE
TIME
28-Jun-06
6:00
30-Jun-06
13:00
28-Jun-06
0:00
28-Jun-06
9:15
1-Jul-06
0:00
2-Jul-06
3:10
29-Jun-06
0:00
29-Jun-06
14:50
30-Jun-06
0:00
30-Jun-06
19:30
29-Jun-06
23:00
30-Jun-06
13:00
29-Jun-06
22:40
29-Jun-06
22:40

TOTAL CARGO
LOADING RATE
DEMM. RATE
DESP. RATE
KURS

:
:
:
:
:

22,934.000 MT
6,000.000 MT/day
$ 7,000.00
$ 3,500.00
Rp 9,100.00

COMPLETED LOAD
CAST OFF
DATE
TIME
DATE
TIME
2-Jul-06
14:55 3-Jul-06
6:00
29-Jun-06
8:45 29-Jun-06
9:10
3-Jul-06
17:50 4-Jul-06
6:00
30-Jun-06
12:00 30-Jun-06
13:00
1-Jul-06
21:45 1-Jul-06
23:00
1-Jul-06
8:45 1-Jul-06
10:00
1-Jul-06
11:00 1-Jul-06
21:00

23,285.530

CARGO
RETURN
0.000
0.000
0.000
0.000
0.000
0.000
0.000

TOTAL (MT) :

0.000

PERCENT
TO COUNT
0%
0%
0%
100%
100%
100%
100%
100%
100%
100%
100%

TOTAL
JAM
00:00
00:00
00:00
05:20
24:00
24:00
24:00
24:00
24:00
24:00
01:35
00:00
00:00
00:00
00:00
00:00
00:00
00:00
00:00
150:55

VESSEL LOADING PROGRESS


Time Allowed
Time Used
Demurrage Time
Demurrage

by MYI

:
3.822 day
:
6.288 day
:
-2.466 day
: -$ 17,261.03
-Rp 157,075,352.78

DAY
Thursday

Friday
Saturday
Sunday
Monday
Tuesday
Wednesday
Thursday
Friday

DATE
29-Jun-06
29-Jun-06
29-Jun-06
30-Jun-06
1-Jul-06
2-Jul-06
3-Jul-06
4-Jul-06
5-Jul-06
6-Jul-06
7-Jul-06

TIME
FROM
9:20
9:20
10:50
18:40
0:00
0:00
0:00
0:00
0:00
0:00
0:00

TO
9:20
10:50
21:20
24:00
24:00
24:00
24:00
24:00
24:00
24:00
1:35

REMARK
Ship's arrived
NOR Tendered
Turntime
Commenced Loading
Commenced Loading
No Activity
Commenced Loading
Commenced Loading
Commenced Loading
Commenced Loading
Completed Loading

TOTAL :

TOTAL
DAYS
0.000
0.000
0.000
0.222
1.000
1.000
1.000
1.000
1.000
1.000
0.066
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
6.288

THE CERTIFICATE OF ANALYSIS


Total Moisture (arb)
:
Inherent Moisture (adb)
:
Ash Content (adb)
:
Volatile Matter (adb)
:
Fixed Carbon (adb)
:
Total Sulphur (adb)
:
Gross Calorific Value (adb)
:
Hargrove Grindability Index / HGI
:
Ash Fusion Temperature
(Initial Deform Temp, Reducing Atmosphere
:
Size
0 - 50 mm
:
50-100 mm
:

25.8
15.6
3.9
39.7
40.8
0.43
5735
46

PCT
PCT
PCT
PCT
PCT
PCT
Kcal/Kg

1160 deg. Cel


95.2
4.8

You might also like