SUMMARY ON MONITORING RESULTS

(22/July -31/July)

Location Level (m) I01 I02 I15 Parameters Surcharge layer no. Settlement from Plate Unit SP1 3.248 E01 m Max. lateral movement Lateral movement rate, H Settlement rate, V Ratio of H/V Ratio of H/V FS from Wakita & Matsuo' chart Excess pwp. At level +0.0 At level -10.0 At level -20.0 Increment stress,P At level +0.0 At level -10.0 At level -20.0 Skempton Parameter, B At level +0.0 At level -10.0 At level -20.0 Factor of safety from slope analysis: mm mm/day mm/day A- direction (mm)

Maximum lateral movements Level (m)

B- direction (mm)

Phase 1-1 11 SP2 3.429 E01A E01B E01C

m Settlement from Plate Magnet

P01 kN/m kN/m kN/m kN/m kN/m kN/m

P01A

P01B

P01D

SUMMARY ON MONITORING RESULTS


(22/July -31/July)

Location Level (m) I03 A- direction (mm)

Maximum lateral movements Level (m)

B- direction (mm)

Parameters Surcharge layer no. Settlement from Plate

Unit SP3 3.427 E02 m E02A

Phase 1- 2 5 SP9 3.253 E02B E02C E02D 3.355

m Settlement from Plate Magnet

Max. lateral movement (toward the river) mm Lateral movement rate, H mm/day Settlement rate, V mm/day Ratio of H/V Ratio of H/V FS from Wakita & Matsuo' chart Excess pwp. At level +0.0 At level -10.0 At level -20.0 Increment stress,P At level +0.0 At level -10.0 At level -20.0 Skempton Parameter, B At level +0.0 At level -10.0 At level -20.0 Factor of safety from slope analysis:

P02 kN/m kN/m kN/m kN/m kN/m kN/m

P02A

P02B

P02C

P02D

SUMMARY ON MONITORING RESULTS


(22/July -31/July)

Location Level (m) I04 I11 I12 I13 Parameters Surcharge layer no. Settlement from Plate m Settlement from Plate Magnet m E03 A- direction (mm)

Maximum lateral movements Level (m)

B- direction (mm)

Unit

Phase 1- 3 11 SP4 3.090 E03A 2.952 I04 E03B SP24 3.421 SP25 3.302

Phase 2 - 1 SP26 SP27 2.808 SP28 SP01A

Area Building SP01B SP01C SP01D SP02A

E08

I11

I13

I12

Max. lateral movement Lateral movement rate, H Settlement rate, V Ratio of H/V Ratio of H/V FS from Wakita & Matsuo' chart Excess pwp. At level +0.0 At level -10.0 At level -20.0 Increment stress,P At level +0.0 At level -10.0 At level -20.0 Skempton Parameter, B At level +0.0 At level -10.0 At level -20.0

mm mm/day mm/day

P03 kN/m kN/m kN/m kN/m kN/m kN/m

P03A

P03B

P12

P13

SUMMARY ON MONITORING RESULTS


(22/July -31/July)

Location Level (m) I14 A- direction (mm)

Maximum lateral movements Level (m)

B- direction (mm)

Parameters Surcharge layer no. Settlement from Plate

Unit

m Settlement from Plate Magnet m Max. lateral movement Lateral movement rate, H Settlement rate, V Ratio of H/V Ratio of H/V FS from Wakita & Matsuo' chart Excess pwp. At level +0.0 At level -10.0 At level -20.0 Increment stress,P At level +0.0 At level -10.0 At level -20.0 Skempton Parameter, B At level +0.0 At level -10.0 At level -20.0 mm mm/day mm/day

Phase 2- 2 13 SP18 SP19 3.620 3.147 E09 2.648 I14

Phase 2- 3 10 SP20 SP21 2.559 1.971

Phase 3 - 1 8 SP12 SP13 2.996 1.957 E06 2.89

Phase 3 - 2 10 SP14 2.081

kN/m kN/m kN/m kN/m kN/m kN/m

P10 7.25 12.91

P11 28.28 45.01

P06 4.67 10.9

P07 11.75 27.55

97.254 82.982

104.66 90.63

101.647 98.182

95.545 81.76

0.075 0.156

0.270 0.497

0.046 0.111

0.123 0.337