Professional Documents
Culture Documents
Filling The Hole
Filling The Hole
STRING A DP Hevi-Wt. DC
DRILLING APPLICATION
FILLING THE HOLE STRING B DP Hevi-Wt. DC
Pipe ID? = *Corrected Wt.? = Avg Length Stand? = Hole Diameter, in? =
RESULTS-STRING A
Pipe ID? = *Corrected Wt.? = Avg Length Stand? = Hole Diameter, in? =
RESULTS-STRING B
Stks to Fill 1-Std Bbls to Fill 1-Std BHP Loss 1-Dry Std Max Dry pipe pulled for a 75 BHP loss Max Wet pipe pulled for a 75 BHP loss Liner Size, in? = Stroke Length, in? = Pump Efficiency, %? = Output, bbl/stk
Stks to Fill 1-Std Bbls to Fill 1-Std BHP Loss 1-Dry Std Max Dry pipe pulled for a 75 BHP loss Max Wet pipe pulled for a 75 BHP loss Liner Size, in? = Stroke Length, in? = Pump Efficiency, %? = Output, bbl/stk
THE END
MMS Regulation: The annulus shall be filled with mud before the change in mud level decreases the hydrostatic pressures by 75 psi or every five stands of drill pipe, whichever gives a lower decrease in hydrostatic pressure. *Corrected Weight applies to the drill pipe only. "Dry Pipe" = slugged pipe. Reference "WCS Manual" Lafayette, La. 1994. Use Table starting in cell J5 for Corrected Weight of drill pipe.